Monthly Operating Rept for Oct 1988 for Re Ginna Nuclear Power Plant
ML17251A354
Person / Time
Site: Ginna Constellation icon.png
Issue date: 10/31/1988
From: Mcnamara A, Mecredy R
ROCHESTER GAS & ELECTRIC CORP.
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
NUDOCS 8811210337
Download: ML17251A354 (13)


Text

AcCHZRATED DI BUTION DEMONSTR TION SYSTEM REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR:8811210337 DOC.DATE: 88/10/31 NOTARIZED: NO FACIL:50-244 Robert Emmet Ginna Nuclear Plant, Unit 1, Rochester G

AUTH.NAME AUTHOR AFFILIATION MCNAMARA,A.E.

Rochester Gas

& Electric Corp.

MECREDY,R.C.

. Rochester Gas

& Electric Corp.

RECIP.NAME RECIPIENT AFFILIATION DOCKET 05000244

SUBJECT:

Monthly operati

-r for Oct 1988 for RE Ginna Nuclear Power plant.

81115 r.

DISTRIBUTION CODE:

IE24D COPIES RECEIVED:LTR ENCL SIZE:

TITLE: Monthly Operating Report (per Tech Specs NOTES:License Exp date in accordance with 10CFR2,2.109(9/19/72).

05000244 j RECIPIENT ID CODE/NAME PD1-3 LA

'STAHLE, C INTERNAL: AEOD/DOA ARM TECH ADV NRR/DOEA/EAB 11 NUDOCS-ABSTRACT RGN1 EXTERNAL EG&G S IMPSON i F LPDR NSIC COPIES LTTR ENCL 1

0 1

0 1

1 2

2 1

1 1

1 1

1 1

1 1

1 1

1 RECIPIENT ID CODE/NAME PD1-3 PD AEOD/DSP/TPAB NRR/DLPQ/PEB ll REP/RPB 10 REG FIL '1 EG&G WI'LLIAMSI S NRC PDR COPIES LTTR ENCL 5

5 1

1 1

1

.1 1

'1 1

1 1

1 1

NVZE TO ALL "RIDS" RECIPIENTS PZZASE HELP US TO REDUCE HASTE!

CONTACT 'lHE DOCXJMEtfZ CGNIHOL DESK, ROOM Pl-37 (EXT. 20079)

TO EIZMZNATE YOUR NAME FROM DISTRHK7ZION LISTS FOR DOCUMENl'S YOU DON'T NEED>

TOTAL NUMBER OF COPIES REQUIRED:

LTTR 22 ENCL 20

~ OPERATING STATUS OPERATlNG DATA REPORT DOCKET NO+

50 244 DATE November 1988 COMPLETED BY Andrew E.

McNamara TEI.FpHONF (315)524-4446, Ext. 301

1. Unit Name:

R.E. 6INNA NUCLEAR POWER PlANT

2. Reporting period:

October 1988

3. Licensed Thermal Power (MWt):

1520

4. Nameplate Rating (Gross MWe):

490

5. Design Electrical Rating (Net MWe):
6. Maximum Dcpcndable Capacity (Gross hfWe):
7. hfaximum Dependable Capacity (Net MWe):

The reactor power level was maintained at 100K for the majority of the report.

A minor exception is detailed on Page 4.

8. IfChanges Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
9. Power Level to Which Restricted, IfAny (Net MWc):
10. Reasons For Restrictions, If Any:

This hlonth Yr"to.Date Cumulative 362 821.00 O.OOX ll. Hours In Reporting Period

12. Number of Hours Reactor Was Critical 745.00
13. Reactor Reserve Shutdown Hours 0.00
14. Hours Gcncrator On-Linc 745.00
15. Unit Rescrvc Shutdown Hours 0.00
16. Gross Thermal Energy Generated (hlWH)
18. Net Electrical Energy Generated (MWH)
19. Unit Service Factor 100.00K
20. Unit AvailabilityFactor 100.00K
21. Unit Capacity Factor (Using MDC Net) 103.62K
22. Unit Capacity Factor (Using DER Net) 103.62K
23. Unit Forced Outage Rate
24. Shutdowns Scheduled Over Next 6 Months (Type, Date and Duration Annual Refueling and Maintenance Shutdown March 7 320.00 6 215.14 0.00 6 129.00 0.00 165 960.00 130 233.61 127 807. 88 8 50**

83.74K 83.74K 82.08K 82.08K 5.22K

77. 0 73.26$

73.26K 6.45K of Each):

17 1989 49 to 55 da s 2 971 687.00 59 054 272.00 2 823

25. If Shut Down At End Of Rcport.Period, Estimated Date of Startup:
26. Units In Test Status (Prior to Commercial Operation):

INITIALCRITICALITY INITIALELECTRICITY, COMMERCIALOPERATION Forecast Achieved

  • Eastern Daylight Savings Time to Eastern Standard Time
  • "Cummulative total commencing Jaunuary 1,

1975 Rtv. 4/88 49 88

~

~

~

~

f P

e

L AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.

UNIT DATE COMPLETED BY 50-244 R.E.

Ginna Nuclear Power Plant N v mber 15 1988 Andrew

. McNamara TELEPHONE 1

315 524-4446 Ext.

301 at Ginna MONTH October 1988 DAY AVERAGE DAILY POWER LEVEL (MWe-Net)

DAY AVERAGE DAILY POWER LEVEL (MWe-Net) 1 ~

484 17.

486 2.

484 18.

488 3.

484 19.

488 4 ~

485 20.

488 5.

485 21.

488 6.

485 22.

488 7

~

485 23.

488 8.

485 24.

488 9.

10.

486 486 25.

26.

488 488 487 27'88 12.

488 28.

488 13.

488 29'89 14.

'88 30.

488 15.

488 31

~

489 16.

488 INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting month.

Compute to the nearest whole megawatt.

I

~ ~

J

I)OCKI'.T NO.

SO-244 UNITNAhll:. R.E. GINNA NUCLEAR POWER PLANT UNIT SHUTDOWN AND POWER REDUCTIONS COMPLI'.TED 13Y Andrew E.

McNama a REPORT hlONTH October 1988 Tl'.LI:PIIONI; 24-4446 Ext. 301 No.

Date 00 I

0 a

0 C4 C0 00 IZ 0>>0 c 0 00>> 0 own C

0 CI licensee Event Report 0

Ew 0

lA C

CllA c00 E

0 V

Cause L Corrective Action to Prevent Recurrence No significant power reductions or outages to report.

F: Forced St Scheduled REV. 4/SS 4949 Reason:

A-Equipment Failure (Explain)

B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training 8c License Examination F-Administrative G-Operational Error (Explain)

Hither (Explain)

Method:

1-Manual 2-Manual Scram.

3-Automatic Scram.

4-Other (Explain)

Fxhibit G - Instructions for Preparation of Data Entry Sheets for Licensee Event Report (LER) File (NUREG-0161)

Exhibit I - Same Source

V e

NARRATIVE

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO.

50-244 UNIT R.E.

Ginna Nuclear Power Plant DATE Nov m er 15 1988 COMPLETED BY

~ gran Andrew E.

cNamara TELEPHONE 1

315 524-4446 EXT. 301 at Ginna MONTH October 1988 The reactor power level was maintained at 100~ for the majority of the report period with one minor exception:

On October 17, the reactor power level was reduced to 97% for a short period of time to perform a periodic test on the Auxiliary Feedwater System.

~

h,

~$ ), '14 g

+Q

~

a

~

~

GINNA STATION MAINTENANCE REPORT

SUMMARY

OCTOBER g 1 9 8 8 During the month of October, routine maintenance and inspections were completed.

Major safety related work included:

a ~

b.,

C ~

d 0 e.

g, "B" Charging Pump Repack and rebuild spare assemblies.

"Control Room Toxic Gas Monitor" Replace and rebuild spare pumps.

"Spare Service Water Pump Bowl Assembly" Rebuild unit.

Inspect components for boric acid blockage.

Perform leakage test on check valves 4003 and 4004.

Replace seal return filters.

Inspect "C" service'ater pump check valve 4603.

r

fI liiililiIIl'llliWZ AhrD Sg/till f/Nl!ill iiuziiÃ

~zzusvz ROCHESTER GAS AND ELECTRIC CORPORATION o 89 EAST AVENUE, ROCHESTER, N.Y. 14649-0001 TCLEPHONC AREA cooE Tld 546-2700 GINNA STATION November 15, 1988 US Nuclear Regulatory Commission Document Control Desk Washington, DC 20555

Subject:

Monthly Report for October, 1988 Operating Status Information R.

E. Ginna Nuclear Power Plant Docket No. 50-244

Dear Sir:

Pursuant to our Technical Specification 6.9.1, attached herewith is the monthly operating status report for Ginna Station for the month of October, 1988.

Very truly yours, Robert C. Mecredy General Manager Nuclear Production RCM/eeh Attachments cc: