ACCELE RA.TED DlSTMBUTtON DE MON STRA.TION SYSTEM)d REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
ACCESSION NBR: 8811150213 DOC. DATE: 88/11/04 NOTARIZED: NO FACIL:50-244 Robert Emmet Ginna Nuclear Plant, Unit 1, Rochester AUTH.NAME AUTHOR AFFILIATION MECREDY,R.C.
Rochester Gas
& Electric Corp.
RECIP.NAME RECIPIENT AFFILIATION RUSSELL,W.T.
Region 1, Ofc of the Director
SUBJECT:
Responds to violations noted in Insp Rept 50-244/88-16.
DISTRIBUTION CODE:
IE01D COPIES RECEIVED:LTR
(
ENCL
'IZE:
TITLE: General (50 Dkt)-Insp Rept/Notice of VioTation Re ponse NOTES:License Exp date in accordance with '10CFR2,2.109(9/19/72).
DOCKET 4.
G 05000244:
R 05000244 RECIPIENT ID CODE/NAME PD1-3 PD INTERNAL AEOD NRR MORISSEAU,D NRR/DLPQ/QAB 10 NRR/DREP/EPB 10 NRR/DRIS DIR 9A NUDOCS-ABSTRACT OGC/HDS2 RGN1 FILE 01 TERNAL: LPDR NSIC COPIES LTTR ENCL 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 1
1 RECIPIENT ID CODE/NAME STAHLE, C
, DEDRO NRR/DLPQ/PEB 11 NRR/DOEA DIR 11 NRR/DREP/RPB 10 NRR/PMAS/ILRB12 OE~~BERMAN,Z EG 02 NRC PDR RESL MARTIN,D COPIES LTTR ENCL 1
1 1
1 1
1 1
1 2
2 1
1 1
1 1
1 1
1 1
1 D
D 8'
I' S
NOTE R) ALL "RIDS" RECIPIENIS:
PLEASE HELP US TO REDl,'JCE
%HASTE!
CORI'ACI'XHE DOCUMENl'XKIBOLDESK, ROOM Pl-37 (EXT. 20079)
KO EliQQXATE YOUR NAME PRCH DISTRIHKIGN LISTS H)R DOC(MEHZS YOU DON'T NEED)
TOTAL NUMBER OF COPIES REQUIRED:
LTTR 22 ENCL 22
'10tk
)tall ROCHESTER GAS AND ELECTRIC CORPORATION a 89 EAST AVENUE, ROCHESTER, N.K 14649.0001 I
TEE,C><ONE inca casa ~ie 546.2700 November 4, 1988 Mr. William T. Russell Regional Administrator US Nuclear Regulatory Commission Region I 475 Allendale Road King of Prussia, PA 19406
Subject:
Inspection Report 50-244/88-16 Notice of Violation R.E.
Ginna Nuclear Power Plant Docket No. 50-244
Dear Mr. Russell:
In accordance with NRC Inspection Report 88-16 which stated:
Technical Specification 6.8.1 requires, in part, written procedures shall be implemented covering surveillance and test activities of safety related equipment and the
. radiological environmental monitoring program.
Periodic Test procedure PT-12.1, Emer enc Diesel Generator lA, Revision 38, effective July 15,
- 1988, step 2.1 requires the lA Emergency Diesel Generator be demonstrated operable and step 2.1.6 requires, in part, various local panel readings are verified within given acceptable values.
Contrary to the
- above, on August 8,
- 1988, PT-12.1 was performed with actual fuel oil pressure documented outside the range of acceptable values;
- and, on August 9,
- 1988, PT-12.1 was again performed with lube oil pressure documented outside the.range of acceptable values.
In each
- case, station personnel failed to declare the diesel inoperable.
Procedure PT-ll.l, Heat Trace Circuit Functional Check, Revision 9,
effective October 16,
- 1987, step 1.1
- requires, in part, Technical Specification required heat trace circuitry be insured operable.
Contrary to the
- above, on March 7, 1988, electrical maintenance personnel failed to notify operations personnel and declare Technical Specification required heat trace circuitry inoperable.
SSi>SSO2> 'ec>04 FDa ODOCP.
<~~000244 9
(
Health Physics Procedure (HP) 5.1, Area Radiation Surve s, Revision 24, effective May 12,
- 1988, step 6.4 requires, in part, survey results for the Auxiliary Building and other radiation areas will be entered on area maps and postecl at the access control area.
Contrary to the
- above, on September 7g 1988/
the inspectors discovered weekly maps documenting surveys performed on August 30 and September 1,
- 1988, had not been posted as required.
We believe the Notice of Violation contains one error. It refers to the lube oil pressure instead of to the out of specification condition identified in section 4 a for lube oil temperature.
1)
Reason for the violation In response, RG&E concurs with the stated violation.
In both Periodic Test (PT) procedures, the field test personnel.
followed the steps as written, initiating a trouble report for the identified deficiency.
The procedures did not clearly require an evaluation to determine whether the declaration of equipment inoperability was warranted, or whether the deficiency was only intended to identify necessary maintenance when certain conditions are reached from a
predictive maintenance standpoint.
The Health Physics (HP) weekly survey was taken as required by Health Physics Procedure HP-5.1 Area Radiation Surve s, however, the latest surveys were not posted due to personnel oversight as required by step 6.4 "Areas inside of controlled areas that have posted survey maps should have the most recent results and date."
2)
Corrective steps which have been taken and the results-achieved Both PT procedures have been revised to assure clarity of the need to evaluate the condition against the inoperability criteria and to assure implementation of the necessary tracking mechanisms for out of service equipment.
These revisions were in progress at the time of the violation.
Necessary personnel have been familiarized in this mechanism.
All personnel in the HP section have been reminded of the posting requirements.
The requirements for posting the surveys have been added to the list of duties for the HP technician.
3)
Corrective steps which will be taken to avoid further violations We concur that the review and approval of the completed test data needs better oversight to assure operability decisions along with analysis and trending of data.
We have set and
4) will continue to set higher standards and clear criteria for operational and supervisory reviews on all critical informa-tion.
Responsible personnel have been familiarized with these expectations and significant changes
. have already taken place.
Date when full compliance will be achieved All corrective action concerned with the specific violation have been completed,
- however, additional improvement will continue to be made.
Additional information'n the specifics of the ongoing improvement plan can be best conveyed in our discussion on Inspection Report 88-15.
Very truly yours, Robert C.
M cr General Manage Nuclear Production xc:
U.S. Nuclear Regulatory Commission (original)
Document Control Desk Washington, DC 20555 Ginna Senior Resident Inspector