Monthly Operating Rept for Sept 1988 for Re Ginna
ML17251A334
Person / Time
Site: Ginna Constellation icon.png
Issue date: 09/30/1988
From: Mcnamara A, Mecredy R
ROCHESTER GAS & ELECTRIC CORP.
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
NUDOCS 8810210405
Download: ML17251A334 (12)


Text

A.C CELERA.TED DI BUTION DEMONS TION BYE'EM 1

REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR:8810210405 DOC.DATE: 88 NOTARIZED: NO FACIL:50-244 Robert Emmet Ginna Nuclear Plant, Unit 1, Rochester G

AUTH.NAME AUTHOR AFFILIATION MCNAMARA,A.E.

Rochester Gas

& Electric Corp.,

MECREDY,R.C.

Rochester Gas

& Electric Corp.

RECIP.NAME RECIPIENT,AFFILIATION

SUBJECT:

Monthly operating rept for Sept 1988 for RE Ginna. /FED~

ltr.

DISTRIBUTION CODE:'IE24D COPIES RECEIVED:LTR ENCL SIZE:

TITLE: Monthly Operating Report (per Tech Specs NOTES:License Exp date in accordance with 10CFR2,2.109(9/19/72).

DOCKET g I, 05000244.

R D

S 05000244/

h RECIPIENT ID CODE/NAME PD1-3 LA STAHLE,C INTERNAL: AEOD/DOA ARM TECH ADV NRR/DOEA/EAB ll NUDOCS-ABSTRACT RGNl COPIES LTTR ENCL 1

0 1

0 RECIPIENT ID CODE/NAME PD1-3 PD COPIES LTTR ENCL 5

5 1

1 AEOD/DSP/TPAB, 1

1 2

2 N

I B 11 1

1 1

1 9

10 1

1 1

1 E

LE 1

1 1

1 1

D

'D 8

EXTERNAL EG&G WILLIAMSI S NRC PDR 1

1

,1 1

LPDR NSIC 1

1 1

1 S.

NOTE TO ALL "RIDS" RECIPZEVIS'LEASE HELP US TO RZZXJCE WASTE!

CXRKACT 'IHE DOCUMENI'XÃ5KLDESK RMM Pl-37 (EXT. 20079)

TO ZZZH32VZH K)UR NAME FMM DISTRZKJTION LISTS H)R DOCUMENZS KNJ DCjN~T NEEDf D

D S

TOTAL NUMBER OF COPIES REQUIRED:

LTTR 21 ENCL 19

N I I

J r

s

,1

~ OPERATING STATUS OPERATING DATA REPORT DOCKET NO.

50 244 October 1988 COMPLETED BY

. 7y1 Andrew E. McNamara TELFpHONF 1(315)524-4446 Ext. 301 I ~ Unit Name:

R.E. 6INNA NUCLEAR POWER PLANT

2. Reporting Period, Se tember 1988
3. Licensed Thermal Power (MWt):
4. Nameplate Bating (Gross hlWe):
5. Design Electrical Rating (Nct MWe):
6. Maximum Dependable Capacity (Gross MWe):
7. Maximum Dependable Capacity (Net MWe):

The reactor power level was maintained at 100K for the majority of the report period.

The two exceptions are detailed on pages 3 and 4.

8. IfChanges Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Rcport, Give Reasons:
9. Power Level to Which Restricted, If Any (Net MWc)r
10. Reasons For Rcs trictions, If Any:

This Month Yr:to-Date Cumulative K UQ) em O

IQ 3)stfo O4

'O

'VI I

OCO. I V1to

'O",

Out 165 215.00 6,575.00 720 129 488.61 5 470.14 l 687.55*

0.0 127 062.88 8.5*

1 068 655 178 653 307 58 673 299 2,590 714 2 461 044 55 672 328 76.91K lOOX 76.91K 73.12K 100.40K 73.12K 79.64K

25. If Shut Down At End Of Rcport. Period, Estimated Date of Startup:
26. Units In Test Status (Prior to Commercial Operation):

INITIAL CRITICALITY INITIALELECTRICITY COMhfERCIAL OPERATION Forecast Achieved ll. Hours In Reporting Period

12. Number of Hours Reactor Was Ctitical 720
13. Reactor Rcservc Shutdown Hours 0.0
14. Hours Generator On-Line 720 384.50
15. Unit Reserve Shutdown Hours
16. Gross Thermal Energy Generated (hlWH)
17. Gross Electrical Energy Generated (MWH)
18. Net Flectrical Energy Generated (MWH) 339 742
19. Unit Service Factor 100K 81.89%
20. Unit AvailabilityFactor 81.89K
21. Unit Capacity Factor (Using MDC Net) 79.64/o
22. Unit Capacity Factor (Using,DER Net) 100.40K
23. Unit Forced Outage Rate
24. Shutdowns Scheduled Over Next 6 hfonths (Type, Date and Duration of Each):

Annual Refueli and Maintenance Shutdown March 17 1989 49 to 55 da s "Cumulative total commencing January 1, 1975 Rtv. 44$

4$-88

'1 4

P

>>k

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.

50-244 UNIT R.E. Ginna Nuclear Power Plant DATE October 15 1988 COMPLETED BY Andrew E.

McNamara TELEPHONE 1

315 524-4446 Ext.

301 at Ginna MONTH Se tember 1988 DAY AVERAGE DAILY POWER LEVEL (MWe-Net)

DAY AVERAGE DAILY POWER LEVEL (MWe-Net) 474 17 ~

373 2 ~

474 18.

323 3.

475 19.

478 4 ~

481 20.

484 5.

480 21.

486 6.

7 ~

8.

480 480 481 22

'3

'4'84 483 483 9 ~

10'81 481 481 25.

26.

27'82 482 482 12.

13.

14.

15.

481 481 479 482 28

'9

'0.

31 ~'82 483 483 16.

482 INSTRUCTIONS On this format, list the average daily unit. power level in MWe-Net for each day in the reporting month.

Compute to the nearest whole megawatt.

l)0( K11 NO SO 244 UNi'I'NAhff:. R.E. GINNA NUCLEAR POWER PLANT UNIT SHUTDOWN AND POWER REDUCTIONS

(:Ohtp Ll'.1'l(D BY Andrew E.

McNa ra JL'o.

Date 0

I 00 4 0

0 C0 00 CC L0 E u 0~0

> cc Dan 0

0 CI Licensee Event Report II Em 0

0 Vl D0 EA c0Ln 0

0 O

Cause L Corrective Action to Prevent Recurrence 09/17/88 P

29.75 A

Mechanical seal failure heater drain pump F:

Forced S:

Scheduled REV. 4/85 4949 Reason:

A-Etluipment Failure (Explain)

B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training & License Examination F-Administrative G-Operational Error (Explain)

H-Other (Explain) hlethod:

1-hlanual 2-hfanual Scram.

3-Automatic Scram.

4-Other (Explain)

Exhibit G - Instructions for Preparation of Data Entry Sheets for Licensee Event Report (LER) File (NUREG-0161)

Exhibit 1 - Same Source

  • Power Reduc:tion

F~

f

NARRATIVE

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO.

50-244 UNIT R.E. Ginna Nuclear Power Plant DATE Octob r 15 1988 COMPLETED BY

. Pf Andrew E.

cNamara TELEPHONE 1

315 524-4446 EXT. 301 at Ginna MONTH Se tember 1988 The reactor power level was maintained at 100% for the majority of the report period, with two exceptions:

On September 14, the reactor power level was reduced to 98% to perform a periodic test on the Auxiliary Feedwater System.

On September 17, the reactor power level was decreased to a low of 534 due to a mechanical seal failure on a heater drain pump.

The reactor, power level was restored to 1004 on September 18 and remained there for the remainder of the report period.

p GINNA STATION MAINTENANCE REPORT

SUMMARY

SEPTEMBER' 9 88 During the month of September, routine maintenance and inspections=

were completed.

Major safety related work included:

a ~

b.

c ~

Repair Boric Acid Filter leak.

Primary snubber inspection per Procedure M-40 Inspect and rebuild "B" Aux. Feed Pump AOV-4310.

4r

~(r'8(EN j<./Zl/III' uZz- ~~un>>

VQRR I'llIIIIRI 5VA55 ROCHESTER GAS AND ELECTRIC CORPORATION o 89 EAST AVENUE, ROCHESTER, N.Y. 14649.0001 VCLCPHOHC ARCA COOK 7555 546.2700 GINNA'TATION October 15, 1988 US Nuclear Regulatory Commission Document Control Desk Washington, DC 20555

Subject:

-Monthly Report for September, 1988 Operating, Status Information R. E. Ginna Nuclear Power Plant Docket No. 50-244

Dear Sir:

Pursuant to our Technical Specification 6.9.1, attached herewith is the monthly operating status report for Ginna Station for the month of September, 1988.

Very truly yours, Robert C. Mecre General Manager Nuclear Production RCM/eeh Attachments cc:

Mr. William T. Russell NRC (1)