Monthly Operating Rept for Aug 1988 for Ginna Station
ML17251A265
Person / Time
Site: Ginna 
Issue date: 08/31/1988
From: Mcnamara A, Mecredy R
ROCHESTER GAS & ELECTRIC CORP.
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
NUDOCS 8809220062
Download: ML17251A265 (13)


Text

iCCELERATKD DISXRIBUYION DEMONSTRATION SYSTEM REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR:8809220062 DOC.DATE: 88/09/15 NOTARIZED: NO DOCKET FACIL:50-244 Robert Emmet Ginna Nuclear Plant, Unit 1, Rochester G

05000244,

~

AUTH.NAME AUTHOR AFFILIATION MCNAMARA,A.E.

Rochester Gas

& Electric Corp.

MECREDY,R.C.

Rochester Gas

& Electric Corp.

RECIP.NAME RECIPIENT AFFILIATION

SUBJECT:

Mo l

perating rept for Aug 1988 for Ginna Station.

/880915 tr.

DISTRIBUTION CODE:

IE24D COPIES RECEIVED:LTR ENCL SIZE:

TITLE: Monthly Operating Report (per Tech Specs)

NOTES:License Exp date in accordance with 10CFR2,2.109(9/19/72),.

D 05000244 RECIPIENT ID CODE/NAME PD1-3 LA STAHLE,C INTERNAL: AEOD/DOA ARM TECH ADV NRR/DOEA/EAB ll NUDOCS-ABSTRACT RGN1 EXTERNAL EG&G WILLIAMSg S NRC PDR COPIES LTTR ENCL 1

0 1

0 1

1 2

2 1

1 1

1 1

1 1

1 1

1 RECIPIENT ID CODE/NAME PD1-3 PD AEOD/DSP/TPAB NRR/DLPQ/PEB 11

/++(QNPB 10 REG FILE 01 LPDR NSIC COPIES LTTR ENCL 5

5 1

1 1

1 1

1 1

1 1

1 1

1 D

8 A

TOTAL NUMBER OF COPIES REQUIRED:

LTTR 21 ENCL 19

I

OPERATING DATA REPORT DOCKET NO.

DATE Se tember 15 198 COMPLETED BY Andrew E.

McNamara

~ OPERATING STATUS 490

1. Unit Name:

R.E. GINNA NUCLEAR POWER PLANT

2. Reporting Period:

Au ust 1988

3. Licensed Thermal Power (MWt):
4. Nameplate Rating (Gross MWe):
5. Dcstgn Electrical Rating (Net MWe):

t

6. Maximum Dependable Capacity (Gross MWe)t
7. hfaximum Dependable Capacity (Net MWe):

TELEPHONE 315-Ginna Station Notes The reactor power level was maintained at lOOX for the majority of the report period.

The exceptions are detailed on a e 4.

8. IfChanges Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
9. Power Level to Which Restricted, If Any (Net MWc):
10. Reasons I'or Restrictions, If Any:

This Month Yr, to Date Cumulative U WVi

,f0' I(jh,Q Ioo

,0910 SQ 4)o

, ton

'oe RcX N

os, GO%

0)Q Q' 744.00 5 855.00

11. Hours In Reporting Period
12. Number of Hours Reactor Was Critical
13. Reactor Reserve Shutdown Ifours
14. Ifours Gcncrator On-Linc

) 5. Unit Rcservc Shutdown Hours

16. Gross Thermal Energy Generated (hfWH)
17. Gross Electrical Energy Generated (MWH)
18. Net Flectrical Energy Gencratcd (hfWH)
19. Unit Service Factor
20. Unit AvailabilityFactor
21. Unit Capacity Factor (Using MDC Net)
22. Unit Capacity Factor (Using,DER Net)
23. Unit Forced Outage Rate
24. Shutdowns Scheduled Over Next 6 Months (T 744.00 4 750.14 0.0 744.00 4 664.50 0.0 0.0 1,113,811 365 061 346 906 6,656 919 2 233 531 2

121 302 100$

7 6

lOOX 99.21K 99.21K 77.09K 6.75K O.OX ype, Date and Duration of Each):

Forecast

25. If Shut Down At End Of Rcport.Period, Estimated Date of Startup:
26. Units In Test Status (Prior to Commercial Operation):

INITIALCRITICALITY INITIALELECTRICITY COhfMERCIAL OPERATION 128 768.61 126 342.88 8,5

  • 177 584 652 58 316 116 55 332 586 73K 6.52K Achieved
  • Cummulative Total Commencing January 1,

1975 atv. 44$

49 88

1 t

y J

h 11, iJ

t

'C AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.

50-244 UNIT R.E. Ginna Nuclear Power Plant DATE Se tember 15 1988 COMPLETED BY Andrew E.

McNamara MONTH Au ust 1988 TELEPHONE 1

315 524-4446 Ext.

301 at Ginna DAY AVERAGE DAILY POWER LEVEL (MWe-Net)

DAY AVERAGE DAILY POWER LEVEL (MWe-Net) 2 ~

3 ~

4 ~

5.

6.'

~

8.

9a 10.

12.

13

'66 465 466 465 466 463 463 463 463 462 463 463 463 17.

18

'9

'0

~

21 ~

22.

23.

24.

25.

26.

27

'8

'9.

468 463 466 457 446 473 487 486 442 478 481 481 480 14.

462 30.

477 15'62 31.

425 16'64 INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting month.

Compute to the nearest whole megawatt.

P

~

~

~'

< h

I)0(:KI:TNO.

50 244 liNITNAMI:.R.E. GINNA NUCLEAR POWER PLANT UNIT SHUTDOWN AND POWER REDUCTIONS>>ATI'.~

(:Ohtp LI'.1'I'.D BY rew c amaa RFPORT hIONTH AUGUST 1988 Ti:.LI(PHONI:.

315-524-4446 x-301 Ginna Station No.

Date c0 oO txl Pl Cn o-0 c u4o tx,'IAc 0

Cl Licensee Event Report t Em e

Ul 'lgo IA (J c0 EA 0c Q u0 O

Cause 8a Corrective Action to Prevent Recurrence No shutdowns or major power reduc-tions to report.

See page 4 for minor reductions in the report period.

F: Forced S:

Scheduled REV. 4/BS 4949 Reason:

A-Equipment Failure (Explain)

B-Maintenance or Test C-Refueling D-Regulatory Restriction E&perator Training & License Examination F-Administrative G-Operational Error (Explain)

Hither (Explain) 3 hlethod:

14Ianual 2-hlanual Scram.

3-Automatic Scram.

4-Other (Explain)

Fxhibit G - Instructions for Preparation of Data Entry Sheets for Licensee Event Report (LER) File (NUREG-0161)

Exhibit I - Same Source

r

)

NARRATIVE

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO ~

50-244 UNIT R.E.

Ginna Nuclear Power Plant DATE S

tember 15 1988 COMPLETED BY Andrew E.

McNamara TELEPHONE 1

315 524-4446 EXT. 301 at Ginna MONTH Au st 1988 The unit's reactor power level was maintained at 100% for the majority of the report period; with the following exceptions of short duration:

On 8/19 the reactor power level was reduced to 98% to perform a periodic test of the Auxiliary Feedwater System.

On 8/20 the reactor power level was reduced to 91% to check the generator output breakers at Station 13A (Switchyard).

The power level was restored to 100% after the inspection.

On 8/21 the reactor power level was reduced to 86% to further check the generator output breakers at Station 13A (Switchyard).

The power level was restored to 1004 after the inspection.

On 8/25 the unit experienced a turbine runback with a reduction in power level to "72%.

The runback was due to a bistable failure in the power range instrumentation.

The power level was restored to 1004 on 8/26.

On 8/31 the reactor power level was reduced to 834 to further check the generator output breakers at Station 13A (Switchyard).

The unit was restored to 1004 after the inspection was completed.

~

I

~ 1 L

I 4

4 GINNA STATION MAINTENANCE REPORT

SUMMARY

AUGUST g 1988 During the month of August, routine maintenance and inspections were completed.

Major safety related work included:

a 0 "A" Diesel Generator Oil Cooler Cleaned service water side of cooler.

b.

c ~

Turbine Driven Aux. Feed Water Pump Cleaned service water strainers.

Clamp Tested Relief and Regulating Valve (Fuel Oil) for "A" Diesel Generator.

d 0 e.

"A" Diesel Generator - Replace Fuel Oil Pump.

Weld Repair on "C" Charging Pump Relief Valve Socolet, Replace Relief Valve with Spare, Repair and Test Relief Valve and Put in Stock for Spare.

~

~

I

~

~

I

'h

////44E4 ( Ellllllll4

/III/

/I/

I////I/III/I/

/IIIIII II/Ill/4'OCHESTER GAS AND ELECTRIC CORPORATION o 89 EAST AVENUE, ROCHESTER, N.K PEW hh

~ 0 I ~

j

'I YORK 14649-0001 TELEPHONE AREA CODE 7ld 546-2700 GINNA STATION September 15I 1988 US Nuclear Regulatory Commission Document Control Desk Washington, DC 20555

Subject:

Monthly Report for August, 1988 Operating Status Information R.

E. Ginna Nuclear Power Plant Docket No. 50-244

Dear Sir:

Pursuant to our Technical Specification 6.9.1, attached herewith is the monthly operating status report for Ginna Station for the month of August, 1988.

Very truly yours, Robert C.

Me edy General Manager Nuclear Production RCM/eeh Attachments cc:

Mr. William T. Russell NRC (1)

'P1

~

~ V~

I

~+

S~'4