Text
ACCESSION NBR:8808230354 DOC.DATE: 88/07/31 NOTARIZED: NO DOCKET FACIL:50-244 Robert Emmet Ginna Nuclear Plant, Unit 1, Rochester G
05000244 AUTH'.NAME AUTHOR AFFILIATION MCNAMARA,A.E.
Rochester Gas
& Electric Corp.
MCNAMARA,A.E.
Rochester Gas
& Electric Corp.
RECIP.NAME RECIPIENT AFFILIATION
SUBJECT:
Mo crating rept for Jul 1988 for RE Ginna Plant.
W/880812 tr.
DISTRIB
~O
- IE24D COPIES RECEIVED:LTR
(
ENCL g BISE:
(0 TITLE: Monthly Operating Report (per Tech Specs)
NOTES:License Exp date in accordance with 10CFR2,2.109(9/19/72).
D 05000244 S
RECIPIENT ID CODE/NAME PD1-3 LA STAHLEPC INTERNAL: AEOD/DOA ARM TECH ADV NRR/DOEA/EAB 11 NUDOCS-ABSTRACT RGNl EXTERNAL: EGSG WILLIAMSPS NRC PDR COPIES LTTR ENCL 1
0 1
0 1
1 2
2 1
1 1
1 1
1 1
1 1
1 RECIPIENT ID CODE/NAME PDl-3 PD AEOD/DSP/TPAB NRR/DLPQ/PEB ll NRR D
RPB 10
-FILE 01 LPDR NSIC COPIES LTTR ENCL 5
5 1
1 1
1 1
1 1
1 1
1 1
1 h
D' TOTAL NUMBER OF COPIES REQUIRED:
LTTR 21 ENCL 19
I t
OPERATING DATA REPORT DOCKET NO.
50 244 DATE A
COMPLETED BY Andrew E. McNamara OPERATING STATUS TELEPHONE 3
Ginna Station
- 1. Unit Name:
R.E. PINNA NUCLEAR POWER PLANT
- 2. Reporting period:
Jul 1988
- 3. Licensed Thermal Power (MWt):
- 4. Nameplate Rating (Gross MWe):
- 5. Design Electrical Rating (Net MWe):
- 6. Maximum Dependable Capacity (Gross MWe):
- 7. Maximum Dependable Capacity (Net MWc):
- 8. IfChanges Occur in Capacity Ratings (Items Number 3 Through 7)
Notes The unit operated at lOOX reactor power level for the majority of the report period Exceptions detailed on page 4.
Since Last Rcport, Give Reasons:
- 9. Power Level to Which Restricted, If Any (Net MWc):
- 10. Reasons For Restrictions, If Any:
This Month Yr.-to-Date Cumulative
- 11. Hours In Reporting Period
- 12. Number of Hours Reactor Wa's Critical
- 13. Reactor Reserve Shutdown Hours
- 14. Hours Generator On-Line
- 15. Unit Reserve Shutdown Hours
- 16. Gross Thermal Energy Generated (hIWH)
- 17. Gross Electrical Energy Generated (MWH)
- 18. Nct Flcctrical Energy Generated (hlWH)
- 19. Unit Service Factor
- 20. Unit AvailabilityFactor
- 21. Unit Capacity Factor (Using MDC Net)
- 22. Unit Capacity Factor (Using.DER Nct)
- 23. Unit Forced Outage Rate
- 24. Shutdowns Scheduled Over Next 6 Months (Type, 728.87 5 ill 4 006.14 714.25 3 920.5 96.00K 96.00K 94.01K 94.01K 4.00 76.71K 76.71K 73.87K 73.87K Date and Duration of Each):
044 756 5 543 108 345,922 1 868 470 328 741 1 774 396 163 751 128 024 1 687.55*
125 5 8.88 8.5
- 176 470 841 57 951 055 54 985 680 76.70K 76.71K 72.87K 72.87K
- 25. If Shut Down At End Of Rcport. Period, Estimated Date of Startup:
- 26. Units In Test Status (Prior to Commercial Operation):
INITIALCRITICALITY INITIALELECTRICITY COMMERCIALOPERATION Forecast Achieved
- Cummulative Total Commenciru..Innuary 1,
1975 8808280354 8807030 pDR ADOCN, 050 p
R r
Rtv. 445 49 88
I f
t h
1" IP r
1 V
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.
50-244 UNIT R.E. Ginna Nuclear Power Plant DATE Au ust 12 1988 COMPLETED BY Andrew E.
McNamara TELEPHONE 1
315 '24-4446 Ext.
301 at Ginna MONTH Jul 1988 DAY AVERAGE DAILY POWER LEVEL (MWe-Net) 485 DAY AVERAGE DAILY POWER LEVEL (MWe-Net) 17 '
~
484 18.
119 3
~
484 19.
421 4 ~
484 20.
466 5.
484 21.
476 6 ~
483 22'79 7
~
482 23.
480 8.
481 24.
481 9 ~
481 25.
470 10.
479 26
~
472 473 27'70 12.
470 28.
469 13.
473 29'66 14.
473 30.
466 15'73 31.
466 16'44 NOTE:
Exceptionally high lake temperatures adversely affected the electrical output.
INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting month.
Compute to the nearest whole megawatt.
DO(:Kl'.T NO.
~o-244 liNlTNAMER.E. GINNA NUCLEAR POWER PLANT UNIT SHUTDOWN AND POWER REDUCTIONS
(:OMPLE1'ED I3Y Andrew E.
McNamara TI'.LEPHONE 315-524-4446 x-301 Ginna Station Ho.
Date O
CL I
eI 0
Q ~
Pl C0 D0 Pl L
en0 E v 0
> rt:
0cO C
0O licensee Event Report 0
Ew o
0 0
EA Q O Ill c0 Q
D0 Cause 8a Corrective Action to Prevent Recurrence 88-5 7-16-88 E
29.75 A
88-006 Manual controlled shutdown due to a fault in circuit breaker in offsite power transmission system.
1 F: Forced S:
Scheduled Rtv. 4/89 4949 Reason:
A-Equipment Failure (Explain)
B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training & License Examination F-Administrative G-Operational Error (Explain)
H-Other (Explain) 3 Method:
l*fanual 2-Manual Scram.
3-Automatic Scram.
4-Other (Explain)
Fxhibit G - Instructions for Preparation of Data Entry Sheets for Licensee Event Rcport (LER) File (NUREG-0161)
Exhibit 1 - Same Source
NARRATIVE
SUMMARY
OF OPERATING EXPERIENCE DOCKET NO.
50-244 UNIT R.E. Ginna Nuclear Power Plant DATE A
st 12 1988 COMPLETED BY Andrew E.
McNamara TELEPHONE 1
315 524-4446 EXT. 301 at Ginna MONTH Jul 1988 The unit operated at 100% reactor power level for the majority of the report period, with two exceptions:
On 7/16/88 the unit was taken offline (manual controlled shutdown) due to a fault in a circuit breaker in Station
- 13A, the unit was returned to service on 7/17/88 and returned to full power on 7/19/88.
On 7/20/88 the reactor power level was reduced to 964 to perform Periodic Tests PT-16 and PT-36 Auxiliary Feedwater System and Standby Auxiliary Feedwater System Flow Check.
The unit was returned to 1004 power level after the tests.
GINNA STATION MAINTENANCE REPORT
SUMMARY
JULY, 1988 During the month of July, routine maintenance and inspections were completed.
Major safety related work included:
a ~
b.
C ~
'd ~
e.
"B" Charging Pump Vari-drive Repair/Overhaul "A" Safety Injection Fan Cooler Coil Install Temporary Clamp "B" Aux.
FW Pump Clean Strainer "A" Charging Pump Repair Drain Line "M-40" Monthly Snubber Inspection
I ~
if IIII'll////Itt$$/I/II E!/II+Yll~/
IIIIIIIIIIII'OCHESTER GAS AND ELECTRIC CORPORATION o 89 EAST AVENUE, ROCHESTER, N.Y. 14649 0001 TELEPHONE AREA CODE 711 546-2700 GINNA STATXON August 12, 1988 US Nuclear Regulatory Commission Document Control Desk Washington, DC 20555
Subject:
Monthly Report for July, 1988 Operating Status Information R.
E. Ginna Nuclear Power Plant Docket No. 50-244
Dear Sir:
Pursuant to our Technical Specification 6.9.1, attached herewith is the monthly operating status report for Ginna Station for the month of July, 1988.
Very truly yours, Robert C. Mecred General Manager Nuclear Production RCM/eeh Attachments cc:
Mr. William T. Russell NRC (1)