Docket No. 50-244 August 4, 1988 Mr. Roger W. Kober, Yice President Rochester Gas II Electric Corporation 89 East Avenue Rochester, New York 14649
Dear Mr. Kober:
SUBJECT:
LICENSING ACTIONS ON G INNA The enclosed table lists the status of licensing actions on GINNA as discussed with Paul Wilkens of your staff on 7/20/88.
We will continue to revise the list on a periodic basis.
Sincerely, Originaf signed by:
Carl Stahle, Project Manager Project Directorate I-3 Division of Reactor Projects I/II
Enclosure:
As stated cc:
See next page DISTRIBUTION:
Docket FilebNRC Il Local
- PDRs, PDI-3 r/f, RWessman,
- BBoger,
,<<'Ii1,OGC:
- ki11, EJ d
. i, t
I, Iligi PD C
h e:ck Q /g/88 PDI-3 RW man
/
/88 88081 20135 880804 PDR ADOCK 05000244 PNu
4 C
4 It e'
),
~ l1,lp
)
Cl 'I E
e
<n
Docket No. 50-244 August 4, 1988 Mr. Roger W. Kober, Vice President Rochester Gas 8 Electric Corporation 89 East Avenue Rochester, New York 14649
Dear Mr. Kober:
SUBJECT:
LICENSING ACTIONS ON GINNA The enclosed table lists the status of licensing actions on GINNA as discussed with Paul Wilkens of your staff on 7/20/88.
We will continue to revise the list on a periodic basis.
Sincerely, ot'iginaf signed by:
Carl Stahle, Project Manager Project Directorate I-3 Division of Reactor Projects I/II
Enclosure:
As stated cc:
See next page DISTRIBUTION: ~Docket Fil'e~NRC 8 Local
- PDRs, PDI-3 r/f, RWessman,
- BBoger, C,
OOC=
1 111, El d, O 1, AC O l Ol, jigggl PD C
h e:ck P/g /88 PDI-3 RW man
/
/88
Mr. Roger W. Kober Rochester Gas and Electric Corporation R.
E. Ginna Nuclear Power Plant CC:
Harry H. Voigt, Esquire
- LeBoeuf, Lamb, Leiby and MacRae 1333 New Hampshire
- Avenue, N.W.
Suite 1100 Washington, D.C.
20036 Ezra Bialik Assistant Attorney General Environmental Protection Bureau New York State Department of Law 2 World Trade Center New York, New York 10047 Resident Inspector R.E.
Ginna Plant c/o U.S.
NRC 1503 Lake Road
- Ontario, New York 14519 Mr. Bruce A. Snow, Superientendent Nuclear Production Rochester Gas 5 Electric Corporation 89 East Avenue Rochester, N.Y. 14649-0001 Stanley B. Klimberg, Esquire General Counsel New York State Energy Office Agency Building 2 Empire State Plaza
- Albany, New York 12223 Regional Administrator, Region I U.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, Pennsylvania 19406 Supervisor of the Town of Ontario 1850 Ridge Road
- Ontario, New York 14519 Ms.
Donna Ross Division of Policy Analysis 5 Planning New York State Energy Office Agency Building 2 Empire State Plaza
- Albany, New York 12223
GINNA LICENSING ISSUES NO.
SUBJECT 1.
Procedures Generation Pack 2.
Inadequate Core Cooling 3.
Operational Support Center 5.
Emergency Operation Center 6.
Meteorological Data 7.
SEP-Structural Upgrade 8.
IST 9.
Reactor Coolant Pump Trip
- 10. Increase Activity Coolant TAC NO.
44305 44137 45948 46019 46091 46307 54364 49135 49677 49899 ARGET DATES RAI 6/30/88 10/30/88 5/15/88 NRC SER 5/15/88 LIC AC TS/L 9/30/88 10/30/88 10/30/88 10/30/88 10/30/88 8/30/88 RGE
RESPONSE
TBD*
9/30/88 COMMENTS Region I Review Region I Review Region I Review Region I Review Meeting anticipated Close-out/create a
new TAC for long term IST To re Submit-addit.
information 11.
SPDS 13.
Hydraulic Snubber List 14.
Equipment Classification (2.1
- 15. 'uto Actuation (4.3) 16.
Equipment Class 2.2 51093 51243 5240 52841 5535 53675 8/15/88 9/30/88 9/30/88 9/30/88 9/30/88 10/30/88 11/12/88 TBD*
Audit Report and SER needed Region I
NO.
SUBJECT TAC NO.
ARGET DATES RAI NRC SER LIC AC TS L RGE
RESPONSE
COMMENTS 17.
ost rip Review 1.2 18.
Preventative Maint. (4.2/3) 19.
Reactor Trip System (4.5.2/3 20.
Op. Reactor Review (50.62) 21.
Steam Binding (GL.) (88-03) 24.
Revise Cont. Pressure 25.
Upper Plenum Injection 26.
Extend License Date 27.
P-10 Interlock 28.
Use of TSG Battery 53592 53912 53985 59098 66222 66351 67239 60035 07739 67427 54370 53311 4/15C 10/30/88 TBD 9/30/88 9/30/88 9/30/88 9/30/88 8/30/88 9/30/88 12/16/88 1/15/89 TBD 9/30/88 7/30/88 TBD*
5/25/88 9/30/88 4/30/88 Generic letter response License Amendment Needed Complete Re-submittal-Hold NRC Review Re-analysis Required No firm schedule Withdraw Request Withdraw Request
- To Be Determined