Forwards Table Listing Status of Licensing Actions on Plant, Per 880720 Discussion W/P Wilkens
ML17251A220
Person / Time
Site: Ginna Constellation icon.png
Issue date: 08/04/1988
From: Stahle C
Office of Nuclear Reactor Regulation
To: Kober R
ROCHESTER GAS & ELECTRIC CORP.
References
NUDOCS 8808120135
Download: ML17251A220 (6)


Text

Docket No. 50-244 August 4, 1988 Mr. Roger W. Kober, Yice President Rochester Gas II Electric Corporation 89 East Avenue Rochester, New York 14649

Dear Mr. Kober:

SUBJECT:

LICENSING ACTIONS ON G INNA The enclosed table lists the status of licensing actions on GINNA as discussed with Paul Wilkens of your staff on 7/20/88.

We will continue to revise the list on a periodic basis.

Sincerely, Originaf signed by:

Carl Stahle, Project Manager Project Directorate I-3 Division of Reactor Projects I/II

Enclosure:

As stated cc:

See next page DISTRIBUTION:

Docket FilebNRC Il Local

PDRs, PDI-3 r/f, RWessman,
BBoger,

,<<'Ii1,OGC:

ki11, EJ d

. i, t

I, Iligi PD C

h e:ck Q /g/88 PDI-3 RW man

/

/88 88081 20135 880804 PDR ADOCK 05000244 PNu

4 C

4 It e'

),

~ l1,lp

)

Cl 'I E

e

<n

Docket No. 50-244 August 4, 1988 Mr. Roger W. Kober, Vice President Rochester Gas 8 Electric Corporation 89 East Avenue Rochester, New York 14649

Dear Mr. Kober:

SUBJECT:

LICENSING ACTIONS ON GINNA The enclosed table lists the status of licensing actions on GINNA as discussed with Paul Wilkens of your staff on 7/20/88.

We will continue to revise the list on a periodic basis.

Sincerely, ot'iginaf signed by:

Carl Stahle, Project Manager Project Directorate I-3 Division of Reactor Projects I/II

Enclosure:

As stated cc:

See next page DISTRIBUTION: ~Docket Fil'e~NRC 8 Local

PDRs, PDI-3 r/f, RWessman,
BBoger, C,

OOC=

1 111, El d, O 1, AC O l Ol, jigggl PD C

h e:ck P/g /88 PDI-3 RW man

/

/88

Mr. Roger W. Kober Rochester Gas and Electric Corporation R.

E. Ginna Nuclear Power Plant CC:

Harry H. Voigt, Esquire

LeBoeuf, Lamb, Leiby and MacRae 1333 New Hampshire
Avenue, N.W.

Suite 1100 Washington, D.C.

20036 Ezra Bialik Assistant Attorney General Environmental Protection Bureau New York State Department of Law 2 World Trade Center New York, New York 10047 Resident Inspector R.E.

Ginna Plant c/o U.S.

NRC 1503 Lake Road

Ontario, New York 14519 Mr. Bruce A. Snow, Superientendent Nuclear Production Rochester Gas 5 Electric Corporation 89 East Avenue Rochester, N.Y. 14649-0001 Stanley B. Klimberg, Esquire General Counsel New York State Energy Office Agency Building 2 Empire State Plaza
Albany, New York 12223 Regional Administrator, Region I U.S. Nuclear Regulatory Commission 475 Allendale Road King of Prussia, Pennsylvania 19406 Supervisor of the Town of Ontario 1850 Ridge Road
Ontario, New York 14519 Ms.

Donna Ross Division of Policy Analysis 5 Planning New York State Energy Office Agency Building 2 Empire State Plaza

Albany, New York 12223

GINNA LICENSING ISSUES NO.

SUBJECT 1.

Procedures Generation Pack 2.

Inadequate Core Cooling 3.

Technical Support Center 4.

Operational Support Center 5.

Emergency Operation Center 6.

Meteorological Data 7.

SEP-Structural Upgrade 8.

IST 9.

Reactor Coolant Pump Trip

10. Increase Activity Coolant TAC NO.

44305 44137 45948 46019 46091 46307 54364 49135 49677 49899 ARGET DATES RAI 6/30/88 10/30/88 5/15/88 NRC SER 5/15/88 LIC AC TS/L 9/30/88 10/30/88 10/30/88 10/30/88 10/30/88 8/30/88 RGE

RESPONSE

TBD*

9/30/88 COMMENTS Region I Review Region I Review Region I Review Region I Review Meeting anticipated Close-out/create a

new TAC for long term IST To re Submit-addit.

information 11.

Regulatory Guide 1.97 12.

SPDS 13.

Hydraulic Snubber List 14.

Equipment Classification (2.1

15. 'uto Actuation (4.3) 16.

Equipment Class 2.2 51093 51243 5240 52841 5535 53675 8/15/88 9/30/88 9/30/88 9/30/88 9/30/88 10/30/88 11/12/88 TBD*

Audit Report and SER needed Region I

NO.

SUBJECT TAC NO.

ARGET DATES RAI NRC SER LIC AC TS L RGE

RESPONSE

COMMENTS 17.

ost rip Review 1.2 18.

Preventative Maint. (4.2/3) 19.

Reactor Trip System (4.5.2/3 20.

Op. Reactor Review (50.62) 21.

Loss of RHR (GL87-12) 22.

SG Snubber Replacement 23.

Steam Binding (GL.) (88-03) 24.

Revise Cont. Pressure 25.

Upper Plenum Injection 26.

Extend License Date 27.

P-10 Interlock 28.

Use of TSG Battery 53592 53912 53985 59098 66222 66351 67239 60035 07739 67427 54370 53311 4/15C 10/30/88 TBD 9/30/88 9/30/88 9/30/88 9/30/88 8/30/88 9/30/88 12/16/88 1/15/89 TBD 9/30/88 7/30/88 TBD*

5/25/88 9/30/88 4/30/88 Generic letter response License Amendment Needed Complete Re-submittal-Hold NRC Review Re-analysis Required No firm schedule Withdraw Request Withdraw Request

  • To Be Determined