'ACCELERATED DI ~RIBUTION DEMONSTPA.TION SYSTEM REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR:9005290223 DOC.DATE:

NOTARIZED:

NO FACIL:50-244 Robert Emmet Ginna Nuclear Plant, Unit 1, Rochester G

AUTH.NAME AUTHOR AFFILIATION DODGE,R.E.

Rochester Gas 6 Electric Corp.

MECREDY,R.C.

Rochester Gas

& Electric Corp.

RECIP.NAME RECIPIENT AFFILIATION DOCKET 05000244

SUBJECT:

Monthly operati for Apr 1990 for RE Ginna Nuclear Power Plant.

900515 tr.

DISTRIBUTION CODE: IE2 S RECEIVED:LTR ENCL SIZE:

TITLE: Monthly Operating Report (per Tech Specs)

NOTES:License Exp date in accordance with 10CFR2,2.109(9/19/72).

D 05000244

/

RECIPIENT ID CODE/NAME PD1-3 LA JOHNSON,A INTERNAL: AEOD/DOA IRM TECH ADV NRR/DOEA/OEAB11 RGN1 EXTERNAL: EGGG STUART,V.A NRC PDR COPIES LTTR ENCL 3

3 1

1 1

1 2

2 1

1 1

1 1

1 1

1 RECIPIENT ID CODE/NAME PD1-3 PD AEOD/DSP/TPAB NRR LPEB10 FIL 01 LPDR NSIC COPIES LTTR ENCL 1

1 1

1 1

1 1

1 1

1 1

1 D

D D

NOTE TO ALL"RIDS" RECIPIENTS:

D D

PLEASE HELP US TO REDUCE WASfE! CONTACT THE DOCUMENT CONTROL DESK, ROOM Pl-37 (EXT. 20079) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!

TOTAL NUMBER OF COPIES REQUIRED:

LTTR 17 ENCL 17

/

t j>>>>>>>>>>>>I

>>>>>>>>>>II

'>>>>I zi

>>I>>>>>>>>>>

>>>>/I

>>>>I>>

T j

j TOIIR j

TTATT j>>>>I ROCHESTER GAS AND ELECTRIC CORPORATION o 89 EAST AVENUE, ROCHESTER, N.Y. 14649-0001 7 TlT. K0 H0 N T!

ARCA OOOE 'Tle 546.2700 GINNA STATION May 15, 1990 US Nuclear Regulatory Commission Document Control Desk Washington, DC 20555

Subject:

Monthly Report for April, 1990 Operating Status Information R. E. Ginna Nuclear Power Plant Docket No. 50-244

Dear Sir:

Pursuant to our Technical Specification 6.9.1, attached herewith is the monthly operating status report for Ginna Station for the month of April, 1990.

Ver truly

ours, j

Robert

. Mecredy Division Manager Nuclear Production RCM/eeh Attachments cc:

Mr. Thomas T. Martin NRC (1)

I 9Q052902 K 0500024+

9004'30 AQOC poc R

0 OPERATING DATA REPORT DOCKET HO.

50.244 DATE Ma 5

1990 COMPLETED BY Robert E.

D ge OPERATING STATUS TELEPHONE 315 524-4446 ext. 396 1 ~

2.

3.

4 ~

5.

6.

7.

Notes:

The unit was shutdown for the 1990 Annual Refueling and Maintenance Outage.

Unit Name:

R.E.

GINNA NUCLEAR POWER PLANT Reporting Period:

APRIL 1990 Licensed Thermal Power (MWt):

1520 Nameplate Rating (Gross Mlle):

490 Design Electrical Rating (Net MWe):

470 Maxiaun Dependable Capacity (Gross MWe):

490 Maximm Dependable Capacity (Het MWe):

470 If Changes Occur in Capacity Ratings (Items Nunber 3 Through 7) Since Last Report, Give Reasons:

9.

Power Level to Which Restricted, If Any (Het MWe):

10'easons For Restrictions, If Any:

This Month Yr. ~ to.Date Cwuiative 11.

12.

13.

14.

15.

16.

17.

18.

19.

20

'1

~

22

'3.

Hours In Report Period Nunber of Hours Reactor Was Critical Reactor Reserve Shutdown Hours Hours Generator On-Line Unit Reserve Shutdown Hours Gross Thermal Energy Generated (MWH)

Gross Electrical Energy Generated (MWH)

Net Electrical Energy Generated (MWH)

Unit Service Factor Unit Avai labi lity Factor Unit Capacity Factor (Using MDC Het)

Unit Capacity Factor (Using DER Net)

Unit Forced Outage Rate 719~

2 879 1 962.07 1 961.5 2 926 224 987 813 940 207 68.13 68.15 69.48

68. 13 179 465.45 140 308.21 1 687.55 137 802.88 8.5 194 548 674 64 021 158 60 758 120 76.79 79.12 73.81 73.81 6.27 24.

Shutdowns Scheduled Over Next 6 Months (Type, Date and Duration of Each):

25.

If Shut Down At End Of Report Period, Estimated Date of Startup:

May 7, 1990 26.

Units In Test Status (Prior to Cotrmercial Operation):

Forecast Achieved INITIALCRITICALITY INITIALELECTRICITY COMMERCIAL OPERATION "CUMULATIVETOTAL COMMENCIHG JANUARY 'I, 1975

    • EASTERN STANDARD TIME TO EASTERN DAYLIGHT SAVIHGS TIME

r 1

AVERAGE DAXLY UNXT POWER LEVEL DOCKET NO.

50-244 UNIT R.E.

Ginna Nuclear Power Plant DATE Ma 1990 COMPLETED BY Robert E.

Dodge TELEPHONE 1

315 524-4446 ext.

396 MONTH A ril 1990 DAY AVERAGE DAXLY POWER LEVEL (MWe-Net)

DAY AVERAGE DAXLY POWER LEVEL (MWe-Net) 17 ~

2 ~

18.

3

~

19.

20 21.

6.

22 '

~

23.

8 ~

24.

9.

10.

25.

26.

27

'2.

13.

-3 28.

29

'4

'0.

15'1

~

0 16.

INSTRUCTXONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting month.

Compute to the nearest whole megawatt.

l

~ r

DOCKI".I'O.

SO 244 UNITNAhll'. R E. GINNA NUCLEAR POWER PLANT UNIT SHUTDOWN AND POWER REDUCTIONS DATE M

15, 1990 COhlPLETED ltY REPORT MONTH APR>L 1990 1 ELI PllONE 315-524-4446 x-396 Ginna Station No.

Date 0

4

~

0 OK n-40 40 IX e~0 C 44

> IL 0 N t30n licensee Event Report 4I'w0 lA 0 EA 40LO 04 0 4o O

Cause 5 Corrective Action to Prevent Recurrence 4-90 A

719 The unit was shutdown for Annual Refueling and Maintenance Outage.'he unit remained shutdown at the end of the report period.

F:

Forced S:

Scheduled Atv. 489 4949 Reason:

A-Equipment Failure (Explain)

B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training & License Examination.

F-Administrative G-Operational Error (Explain)

H-Other (Explain) 3 hfethod:

1 Manual 2-hlanual Scram.

3-Automatic Scram.

4-Other (Explain)

Exhibit G - Instructions for Preparation of Data Entry Sheets for Licensee Event Report (LER) File (NUREG-0161)

Exhibit 1 - Same Source

C

~

',l

NARRATIVE

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO.

50-244 UNIT R.E.

Ginna Nuclear Power Plant DATE Ma 15 90 COMPLETED BY Ro ert E.

Dodge TELEPHONE 1

315 524-4446 ext.

396 MONTH A ril 1990 The unit was shutdown for the Annual Refueling and Maintenance Outage.

The unit remained shutdown at the end of the report periods

~ g E' l