ACCELERATED DISTRIBUTION DEMONSTIRA'IIo5l SYSTEM h

REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS) t ACCESSION NBR:8912270288 DOC.DATE: ~~

NOTARIZED: NO DOCKET g

FACIL:50-244 Robert Emmet Ginna Nuclear Plant, Unit 1, Rochester G

05000244 AUTH.NAME AUTHOR AFFILIATION DODGE,R.E.

Rochester Gas

& Electric Corp.

MECREDY,R.C.

Rochester Gas

& Electric Corp.

RECIP.NAME RECIPIENT AFFILIATION

SUBJECT:

Monthly oper for Nov 1989 for RE Ginna Nuclear Power Plant.

/891215 r.

DISTRIBUTION CODE:

IE24 COPIES RECEIVED:LTR ENCL SIZE:

TITLE: Monthly Operating Report (per Tech Specs NOTES:License Exp date in accordance with 10CFR2,2.109(9/19/72).

'D 05000244 A

RECIPIENT ID CODE/NAME PDl-3 LA JOHNSON,A INTERNAL: AEOD/DOA IRM TECH ADV NRR/DOEA/OEAB11 NUDOCS-ABSTRACT RGN1 EXTERNAL: EG&G SIMPSON, F NRC PDR COPIES LTTR ENCL 3

3 1

1 1

1 2

2 1

1 1

1 1

1 1

1 1

1 RECIPIENT ID CODE/NAME PD1-3 PD AEOD/DSP/TPAB NRR/DLPQ/LPEB10 LPDR NSIC COPIES LTTR ENCL 1

1 1

1 1

1 1

1 1,

1 1

1 1

1 D

'S

, R.

S NOTE TO ALL"RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTEl CONTACI'HE.DOCUMENTCONIROL DESK, ROOM Pl-37 (EXT. 20079) TO ELIMINATEYOUR NAMEFROM DISTRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEEDl TOTAL NUMBER OF COPIES REQUIRED:

LTTR 19 ENCL 19 "D

D S

k I

T I

~

N 0

I ID

,5 I

fi c

<-l P

<<l

/ 7

~ ~

"'IIIIIIIIIIIIIIt !Sll///II Zi7('Zi IIIIIIIIII IIII/

IIIIIIIIII ROCHESTER GAS AND ELECTRIC CORPORATION o R)V li COefb ~ 0, 89 EAST AVENUE, ROCHESTER, N.Y. 14649-0001 7KLCPHONK ARE'A COO8 7l8 546.2700 GINNA STATION December 15, 1989 US Nuclear Regulatory Commission Document. Control Desk Washington, DC 20555

Subject:

Monthly Report for November, 1989 Operating Status Information R.

E. Ginna Nuclear Power Plant Docket No. 50-244

Dear Sir:

P Pursuant to our Technical Specification 6.9.1, attached herewith is the monthly operating status report for Ginna Station for the month of November, 1989.

Very truly yours, Robert C.

Me redy General Manager Nuclear Production RCM/eeh Attachments cc:

Mr. William T. Russell NRC (1) 85'12270238 891130 PDR ADOCK 05000244 R

PDC

~j

OPERATING DATA REPORT DOCKET NO.

50 244 DATF cember 15, 1989 COMPLETED BY Ro rt E. Dod e OP ERATING STATUS TELFPHONE 315-524-4446 x-396 Ginna Station 490 470 1 ~ Unit Name:

R.E. GINNA NUCLEAR POWER PLANT

2. Reporting period:
November, 1989
3. Licensed Thermal Power (MWt):
4. Nameplate Rating (Gross MWe):
5. Design Electrical Rating (Net MWe):
6. Maximum Dependable Capacity (Gross MWe):
7. Maximum Dependable Capacity (Nct MWe):

Notes The unit operated at approxi-mately 100% reactor power level for the majority of the report period.

8. IfChanges Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
9. Power Level to Which Restricted, If Any (Nct MWc):
10. Reasons For Restrictions, IfAny:

This Month Yr:to-Date Cumulative

11. Hours In Reporting Period 720
12. Number of Hours Reactor Was Critical 720
13. Reactor Reserve Shutdown Hours
14. Hours Generator On-Linc
15. Unit Reserve Shutdown Hours
16. Gross Thermal Energy Generated (hIWH)
17. Gross Electrical Energy Generated (MWH)
18. Nct Flectrical Energy Generated (MWH) 343, 695
19. Unit Service Factor 100%
20. Unit AvailabilityFactor 1008
21. Unit Capacity Factor (Using MDC Net) 101.56%
22. Unit Capacity Factor (Using.DER Nct) 101. 56%
23. Unit Forced Outage Rate
24. Shutdowns Scheduled Over Next 6 Months (Type, Date and Duration

~nual Refuelin and Maintenance shutdo 175,440 8, 016 137,602.14 5,904.53 1,687.55*

135,097.38 5,825.5 8.5*

8,544,928 2,860,903 2,718,420 62, 660, 232 59,462,878 77%

72.67%

72.67%

72.15%

77%

73.77%

73.77%

72.15%

6 60+o 6.39%

of Each):

-35das 190,515,342

25. If Shut Down At End Of Rcport. Period, Estimated Date of Startup:
26. Units In Test Status (Prior to Commercial Operation):

INITIALCRITICALITY INITIALELECTRICITY COMMERCIALOPERATION Forecast Achieved

  • Curraulativewtotal corm.ncing January 1,

1t)75 Wtv. AS 49 88

g%

~

I

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.

50-244 UNIT R.E. Ginna Nuclear Power Plant DATE Dece r 15 1989 COMPLETED BY Robert E.

Do ge TELEPHONE 1

315 524-4446 Ext.

396 at Ginna MONTH November 1989 DAY AVERAGE DAILY POWER LEVEL (MWe-Net)

DAY AVERAGE DAILY POWER LEVEL (MWe-Net) 482 17.

483 2 ~

482 18'82 3 ~

482 19'81 4 ~

482 20 ~

482 5.

482 21.

482 6.

482 22'81 7 ~

482 23'83 8.

482 24.

483 9 ~

482 25'83 10'82 26.

482 482 27'82 12.

483 28.

482 13

~

456 29'83 14 ~

421 30.

483 15'26 31.

16.

482 INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting month.

Compute to the nearest whole megawatt.

'I CI

DO(:KI'.T NO.

>>-244 R.E. 6INNA NUCLEAR POWER'PLANT UNIT SHUTDOWN AND POWER REDUCTIONS

(:OhIP LI'.l'I:.D I3Y Robert E. Dodge REPORT MONTH ~~ERI l'I'LI,PIIONI 315-524-4446 x-396 Gonna Sta ron Ho.,

Dote 0

I-C

.0 0

~

0 or O~

C0 00 Pl 0

C 0 0>>

0 0IA C X

0 Ch Licensee Event Report 4I E~

0 Vl 0 IA Q C0 It) 0C 0

00 O

Cause gI Corrective Action to Prevent Recurrence 11/12211/15 11/19 60 hrs.

B 2.5 89-015 INSTRU A maintenance replacement of 13A bushing.

Turbine runback due to a malfunction of TAVG Channel TI-401 11/22 1.75 A

89-015 INSTRU Turbine runback due to a malfunction of TAVG Channel TI-401 1

F: Forced Sc Scheduled REV. 4/85 4949 Reason:

A-Equipment Failure (Explain)

B-Maintenance or Test C-Refueling D-Regulatory Restriction'-Operator Training & License Examination F-Administrative G-Operational Error (Explain)

H-Ocher (Explain) hfethod:

I-hfanual 2-hlanual Scram.

3-Automatic Scram.

4-Other (Explain)

Exhibit G - Instructions for Preparation of Data Entry Sheets for Licensee Event Report (LER) File (NUREG-0161)

Exhibit 1 - Same Source

4

\\P A

NARRATIVE

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO.

50-244 UNIT R.E. Ginna Nuclear Power Plant DATE Dece er 5

1989 COMPLETED BY r

Robert E.

odge TELEPHONE 1

315 524-4446 EXT. 396 at Ginna MONTH November 1989 The unit operated at approximately 100% reactor power for the majority of the report period.

On November 13, 1989 the reactor power level was reduced to 82.5% max.,

due to a replacement of bushings in substation 13A.

On November 19, 1989 the reactor power level was reduced to 954 due to a turbine runback 'caused by a malfunction of TAVG Channel TI-401.

On November 22, 1989 the reactor power level was reduced to 944 due to a turbine runback caused by another malfunction of TAVG Channel TI-401.

0 4