Monthly Operating Rept for Oct 1989 for Re Ginna Nuclear Power Plant
ML17250B069
Person / Time
Site: Ginna Constellation icon.png
Issue date: 10/31/1989
From: Dodge R, Mecredy R
ROCHESTER GAS & ELECTRIC CORP.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 8911280058
Download: ML17250B069 (9)


Text

ACCELERATED D UTION DEMON TION SY%j"EM REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)'CCESSION NBR:8911280058 DOC.DATE: 89/10/31 NOTARIZED: NO FACIL:50-244 Robert Emmet Ginna Nuclear Plant, Unit '1, Rochester G

AUTH.NAME AUTHOR AFFILIATION DODGE,R.E.

Rochester Gas 6 Electric Corp.

MECREDY,R.C.

Rochester Gas 6 Electric Corp.

RECIP.NAME RECIPIENT AFFILIATION DOCKET 05000244'UBJECT:

Monthly opera t for Oct 1989 for RE Ginna Nuclear Power Plant

/891115 r.

DISTRIBUTION CODE:

IE24D COPIES RECEIVED:LTR ENCL SIZE:

TITLE: Monthly Operating Report (per Tech Specs)

NOTES:License Exp date in accordance with 10CFR2,2.109(9/19/72).

S

,05000244 A

RECIPIENT ID CODE/NAME PDl-3 LA JOHNSON,A INTERNAL: AEOD/DOA IRM TECH ADV NRR/DOEA/EAB 11 NUDOCS-ABSTRACT RGN1 EXTERNAL: EGGG SIMPSON,F NRC PDR COPIES LTTR ENCL 3

3 1

1 1

1 2

2 1

1 1

1 1

1 1

1 1

1 RECIPIENT ID CODE/NAME PD1-3 PD AEOD/DSP/TPAB NRR/DLPQ/PEB 10 NRR/DREP/RPB 10 LPDR NSIC COPIES LTTR ENCL 1

1 1

1 1

1 1

1 1

1 1

1 "j.

1 R

NOTE TO ALL"RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTEl CONTACT THE.DOCUMENTCONTROL DESK, ROOM PI-37 (EXT. 20079) TO ELIMINATEYOUR NAMEFROM DISIRIBUTION LISTS FOR DOCUMENTS YOU DONT NEEDl TOTAL NUMBER OF COPIES REQUIRED:

LTTR 19'NCL 19 D

g" I

'0 f

~

~

'mrzt zzziz~nr Lkgl C4 114 Zrir I iZmiisn

'OCHESTER GAS AND ELECTRIC CORPORATION o 89 EAST AVENUE, ROCHESTER, N.Y. 14649-0001 TCLKPHONc Ave*coos>>a 546.2700 GINNA STATION November 15, 1989 US Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 Sub j,e'ct:

Monthly Report for October, 1989 Operating Status Information R.

E. Ginna Nuclear Power Plant Docket No. 50-244

Dear Sir:

Pursuant to our Technical Specification 6.9.1, attached herewith is the monthly operating status report for Ginna Station for the month of October, 1989.

Very truly yours, Robert C.

M credy General Manager Nuclear Production RCM/eeh Attachments cc:

Mr. William T. Russell NRC (1) 89~~2 DOcg 0500024~

800~8 89l03l PDR ADO

~

PDC R

E

\\

tl "I

/,

~ OPERATING STATUS obert E.

TELEPHONF 315-524-4446 x-396 Ginna Station OPERATING DATA REPORT DOCKET NO.

DATE November 15, 1989 COMPLETED BY e

I ~ Unit Name'R.E.

GINNA NUCLEAR POWER

2. Reporting Period:
October, 198
3. Licensed Thermal Power (MWt):
4. Nameplate Rating (Gross MWe):
5. Design Electrical Rating (Net hfWe):
6. Maximum Dependable Capacity (Gross MWe):
7. Maximum Dependable Capacity (Net MWe):

PLANT 1520 490 470 490 470 Notes The unit operated at approximately 100% reactor power level for the majority of the report period.

8. IfChanges Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
9. Power Level to Which Restricted, If Any (Net MWe):
10. Reasons For Restrictions, IfAny:

This Month Yr.-to-Date Cumulative 174,720 136,882.14 1,687.55*

134,377.38 8 5

  • 189,441,244 62,298,843 59,119,183 76.91%

76.91%

73.34%

73.34~o

6. 42%
11. Hours In Reporting Period 745**

7,296

12. Number of Hours Reactor Was Critical 745 g

~

13. Reactor Reserve Shutdown Hours
14. Hours Generator On-Line 745 5,105.5
15. Unit Reserve Shutdown Hours
16. Gross Thermal Energy Generated (MWH)
17. Gross Electrical Energy Generated (hIWH) 2,499,514
18. Net Electrical Energy Generated (MWH) 358,085 2,374,725
19. Unit Service Factor 100%

69.98%

20. Unit AvailabilityFactor 100%

69.989

21. Unit Capacity Factor (Using MDC Net) 69.25%
22. Unit Capacity Factor (Using.DhR Net) 102.27%

69.25%

23. Unit Forced Outage Rate
24. Shutdowns Scheduled Over Next 6 Months (Type, Date and Duration of Each):

Annual Refuelin and Maintenance shutdown - March 30,1990 - 35 da s

25. IfShut Down At End Of Report. Period, Estimated Date of Startup:

/

26. Units In Test Status (Prior to Commercial Operation):

INITIALCRITICALITY INITIALELECTRICITY COhIMERCIAL OPERATION

  • Cumnulative total comnencing January 1,

1975

    • Eastern Daylight Savings Time to Eastern Standard Time Forecast Achieved Rtv. 4/89 49-88

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.

50-244 UNIT R.E.

Ginna Nuclear Power Plant DATE No mber 15 1989 COMPLETED BY Robert E.

Dodge TELEPHONE 1

315 524-4446 Ext.

396 at Ginna MONTH October 1989 DAY AVERAGE DAILY POWER LEVEL (MWe-Net)

DAY AVERAGE DAILY POWER LEVEL (MWe-Net) 477 17.

481 2 ~

478 18.

482 3

~

477 19.

481 4 ~

479 20'82 5.

479 21.

483 6.

479 22.

482 7 ~

470 23.

481 8.

479 24.

481 9 ~

479 25.

481 10.

479 26

~

481 480 27.

481 12.

480 28.

481 13.

481 29'81 14.

480 30.

480 15.

481 31.

481 16'80 INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting month.

Compute to the nearest whole megawatt.

>>0(.KI:.T NO ~

SO-244 UNI'I'NAhli:.R.E. 6INNA NUCLEAR POWER PLANT UNIT SHUTDOWN AND POWER REDUCTIONS>>A'IE

(.OhlP LE1'I'.>> 13Y

/ ~

~

Robert E. Dodge REPORT hlONTH 1'I:LEpllO>ir 315-524-4446 x-396 Ginna Station Ho.

Date 0

I-c0 h

00X c4 c0 00 cL Pl e e-0 c u0 0 e a

ann c 0

Cl Licensee Event Report 4

Em a

N 00 c0Ln 0c 0 0 E

0 tJ Cause g4 Corrective Action to Prevent Recurrence 10-07-89 89-012 ID INSTRU Turbine runback caused by a dropped rod signal frcrn power range detector N-44.

F: Forced S:

Scheduled Rtv. 4/89 4949 Reason:

A-Equipment Failure (Explain)

B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training at License Examination F-Administrative G-Operational Error (Explain)

H-Other (Explain) hlethod:

I-hfanual 2-Manual Scram.

3-Automatic Scram.

4-Other (Explain)

Fxhibit G - Instructions for Preparation of Data Entry Sheets for Licensee Event Report (LER) File (NUREG-0161)

Exhibit 1 - Same Source

I

'I ~

NARRATIVE

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO.

50-244 UNIT R.E. Ginna Nuclear Power Plant DATE Novemb 15 1989 COMPLETED BY obert E.

Dod TELEPHONE 1

315 524-4446 EXT. 396 at Ginna MONTH October 1989 The unit operated at approximately 100% reactor power for the majority of the report period.

On October 7, 1989 the reactor power level was reduced to 804 due to a Turbine Runback caused by a dropped rod signal from power range detector N-44.