Monthly Operating Rept for Oct 1989 for Re Ginna Nuclear Power Plant.W/891115 Ltr
ML17250B069
Person / Time
Site: Ginna Constellation icon.png
Issue date: 10/31/1989
From: Dodge R, Mecredy R
ROCHESTER GAS & ELECTRIC CORP.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 8911280058
Download: ML17250B069 (9)


Text

ACCELERATED D UTION DEMON TION SY%j"EM REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)'CCESSION NBR:8911280058 DOC.DATE: 89/10/31 NOTARIZED: NO DOCKET FACIL:50-244 Robert Emmet Ginna Nuclear Plant, Unit '1, Rochester G AUTH. NAME AUTHOR AFFILIATION DODGE,R.E. Rochester Gas 6 Electric Corp.

MECREDY,R.C. Rochester Gas 6 Electric Corp. 05000244'UBJECT:

RECIP.NAME RECIPIENT AFFILIATION Monthly opera Power Plant /891115 t for r.

Oct 1989 for RE Ginna Nuclear DISTRIBUTION CODE: IE24D COPIES RECEIVED:LTR ENCL SIZE:

TITLE: Monthly Operating Report (per Tech Specs) S NOTES:License Exp date in accordance with 10CFR2,2.109(9/19/72). ,05000244 A

RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PDl-3 LA 3 3 PD1-3 PD 1 1 JOHNSON,A 1 1 INTERNAL: AEOD/DOA 1 1 AEOD/DS P/TPAB 1 1 IRM TECH ADV 2 2 NRR/DLPQ/PEB 10 1 1 NRR/DOEA/EAB 11 1 1 NRR/DREP/RPB 10 1 1 NUDOCS-ABSTRACT 1 1 1 1 RGN1 1 1 EXTERNAL: EGGG SIMPSON,F NRC PDR 1

1 1

1 LPDR NSIC "j.1 1 1

R D

NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTEl CONTACT THE.DOCUMENT CONTROL DESK, ROOM PI-37 (EXT. 20079) TO ELIMINATEYOUR NAME FROM DISIRIBUTION LISTS FOR DOCUMENTS YOU DONT NEEDl TOTAL NUMBER OF COPIES REQUIRED: LTTR 19'NCL 19

g" I

'0 '

~

f

~

'mrzt zzziz~nr Lkgl C4 114 Zrir I iZmiisn

'OCHESTER GAS AND ELECTRIC CORPORATION o 89 EAST AVENUE, ROCHESTER, N.Y. 14649-0001 TCLKPHONc Ave*coos>>a 546.2700 GINNA STATION November 15, 1989 US Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 Sub j,e'ct: Monthly Report for October, 1989 Operating Status Information R. E. Ginna Nuclear Power Plant Docket No. 50-244

Dear Sir:

Pursuant to our Technical Specification 6.9.1, attached herewith is the monthly operating status report for Ginna Station for the month of October, 1989.

Very truly yours, Robert C. M credy General Manager Nuclear Production RCM/eeh Attachments cc: Mr. William T. Russell NRC (1) 89~~2 800~8 89l03l PDR DOcg 0500024~

ADO ~

PDC R

E

\

tl "I

/,

OPERATING DATA REPORT DOCKET NO.

DATE November 15, 1989 COMPLETED BY obert E. e TELEPHONF 315-524-4446 x-396

~ OPERATING STATUS Ginna Station I Unit Name'R.E. GINNA NUCLEAR POWER

~ PLANT Notes October, 198

2. Reporting Period:

1520 The unit operated at

3. Licensed Thermal Power (MWt):

490 approximately 100% reactor

4. Nameplate Rating (Gross MWe): power level for the majority 470 of the report period.
5. Design Electrical Rating (Net hfWe):
6. Maximum Dependable Capacity (Gross MWe):

490

7. Maximum Dependable Capacity (Net MWe):

470

8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
9. Power Level to Which Restricted, If Any (Net MWe):
10. Reasons For Restrictions, If Any:

This Month Yr.-to-Date Cumulative

11. Hours In Reporting Period 745** 7,296 174,720
12. Number of Hours Reactor Was Critical 745 g ~ 136,882.14
13. Reactor Reserve Shutdown Hours 1,687.55*
14. Hours Generator On-Line 745 5,105.5 134,377.38 8 5 *
15. Unit Reserve Shutdown Hours
16. Gross Thermal Energy Generated (MWH) 189,441,244
17. Gross Electrical Energy Generated (hIWH) 2,499,514 62,298,843
18. Net Electrical Energy Generated (MWH) 358,085 2,374,725 59,119,183
19. Unit Service Factor 100% 69.98% 76.91%
20. Unit Availability Factor 100% 69.989 76.91%
21. Unit Capacity Factor (Using MDC Net) 69.25% 73.34%
22. Unit Capacity Factor (Using.DhR Net) 102.27% 69.25% 73.34~o
23. Unit Forced Outage Rate
6. 42%
24. Shutdowns Scheduled Over Next 6 Months (Type, Date and Duration of Each):

Annual Refuelin and Maintenance shutdown - March 30,1990 - 35 da s

25. If Shut Down At End Of Report. Period, Estimated Date of Startup:

/

26. Units In Test Status (Prior to Commercial Operation): Forecast Achieved INITIALCRITICALITY INITIALELECTRICITY COhIMERCIAL OPERATION
  • Cumnulative total comnencing January 1, 1975
    • Eastern Daylight Savings Time to Eastern Standard Time Rtv. 4/89 49-88

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-244 UNIT R.E. Ginna Nuclear Power Plant DATE No mber 15 1989 COMPLETED BY Robert E. Dodge TELEPHONE 1 315 524-4446 Ext. 396 at Ginna MONTH October 1989 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net) (MWe-Net) 477 17. 481 2 478 18. 482

'82

~

3 ~ 477 19. 481 4 ~ 479 20

5. 479 21. 483
6. 479 22. 482 7 ~ 470 23. 481
8. 479 24. 481 9 ~ 479 25. 481
10. 479 26 ~ 481 480 27. 481 12.

13.

14.

480 481 480 28.

29 30.

'81 481 480 15.

16 '80 INSTRUCTIONS 481 31. 481 On this format, list the average daily unit power level in MWe-Net for each day in the reporting month. Compute to the nearest whole megawatt.

>>0(.KI:.T NO ~

SO-244 UNI'I'NAhli:. R.E. 6INNA NUCLEAR POWER PLANT UNIT SHUTDOWN AND POWER REDUCTIONS>>A'IE

(.OhlP LE1'I'.>> 13Y /~ ~

Robert E. Dodge REPORT hlONTH 1'I:LEpllO>ir 315-524-4446 x-396 Ginna Station Pl c c4 ec 0 e- c 0 c u 0

Licensee Em 0Ln c Cause g4 Corrective Ho. 0 h 0 Date 0 0 e a Event a 0 0 0 Action to 0 N 0 I- 0X 0 cL ann c Report 4 0 E 0 Prevent Recurrence 0 tJ Cl 10-07-89 89-012 ID INSTRU Turbine runback caused by a dropped rod signal frcrn power range detector N-44.

F: Forced Reason: hlethod: Fxhibit G - Instructions S: Scheduled A-Equipment Failure (Explain) I -hfanual for Preparation of Data B-Maintenance or Test 2-Manual Scram. Entry Sheets for Licensee C-Refueling 3-Automatic Scram. Event Report (LER) File (NUREG-D-Regulatory Restriction 4-Other (Explain) 0161)

E-Operator Training at License Examination F-Administrative G-Operational Error (Explain)

Rtv. 4/89 4949 H-Other (Explain) Exhibit 1 - Same Source

I

'I

~

NARRATIVE

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO. 50-244 UNIT R.E. Ginna Nuclear Power Plant DATE Novemb 15 1989 COMPLETED BY obert E. Dod TELEPHONE 1 315 524-4446 EXT. 396 at Ginna MONTH October 1989 The unit operated at approximately 100% reactor power for the majority of the report period.

On October 7, 1989 the reactor power level was reduced to 804 due to a Turbine Runback caused by a dropped rod signal from power range detector N-44.