Text

ACCELERATED Dl+R1BU'nON DEMONISTTION SYSTEM 1

REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR:8909280071 DOC.DATE: 89/08/10 NOTARIZED: NO FACIL:50-244 Robert Emmet. Ginna Nuclear Plant, Unit 1, Rochester G

AUTH.NAME AUTHOR AFFILIATION DODGE,R.E.

Rochester Gas S Electric Corp.

MECREDY,R.C.

Rochester Gas 6 Electric Corp.

RECIP.NAME RECIPIENT AFFILIATION DOCKET 05000244

SUBJECT:

Monthly operating rept for Aug 1989 for RE Ginna Nuclear Power Plant.W/890915 ltr.

DISTRIBUTION CODE:

IE24D COPIES RECEIVED:LTR ENCL SIZE-TITLE: Monthly Operating Report (per Tech Specs NOTES:License Exp date in accordance with 10CFR2,2.109(9/19/72).

S 05000244 RECIPIENT ID CODE/NAME PD1-3 LA JOHNSON,A INTERNAL: AEOD/DOA IRM TECH ADV NRR/DOEA/EAB 11 NUDOCS-ABSTRACT RGNl EXTERNAL EGGG SIMPSON, F t

NRC PDR COPIES LTTR ENCL 3

3 1

1 1

1 2

2 1

1 1

1 1

1 1

1 1

1 RECIPIENT ID CODE/NAME PD1-3 PD AEOD/DSP/TPAB NRR/DLPQ/PEB 10

/iD38@

PB 10 EG FILE 01 LPDR NSIC COPIES LTTR ENCL 1.

1 1

1 1

1 1

1 1

1 1

1 1

1 S

h PLEASE HELP US Io REOOCB %ASTE.'ON'ZACT XHE DOCUMEÃZ ~ROL DESKI RXN Pl-37 (EXT. 20079) I EIJMZNATH ARK 2QHE PBQN DISXVGBVTXON TOTAL NUMBER 8F%8$ %

RP. RRR

%5 ENCL 19 D

S

f'SW i7$i/7

>'/ u'x rimed ROCHESTER GAS AND ELECTRIC CORPORATION o 89 EAST AVENUE, ROCHESTER, N.Y. 14649-0001 TELEPHONE ARCA CODE 7la 546.2700 GINNA STATION September 15, 1989 US Nuclear Regulatory Commission Document Control Desk Washingtong DC 20555

Subject:

Monthly Report for Augu"t, 1989 Operating Status Information R. E. Ginna Nuclear Power Plant Docket No. 50-244

Dear Sir:

Pursuant to our Technical Specification 6.9.1, attached herewith is the monthly operating status report for Ginna Station for the month of August, 1989.

Very truly yours, Robert C. Mecre General Manager Nuclear Production RCM/eeh Attachments cc:

Mr. William T. Russell NRC (1) 890928067i 890835 PDR ADOCK 05000244 I DC

OPERATING DATA REPORT DOCKET NO.

DATE COMPLETED BY 50-244 September 15, 1989 Robert E.

Dod

~ OPERATING STATUS 490

l. Unit Name:

R.E. GINNA NUCLEAR POWER PLANT

2. Reporting Period:
3. Licensed Thermal Power (hfWt):

1520

4. Nameplate Rating (Gross MWe):
5. Design Electrical Rating (Nct MWe):
6. hfaximum Dependable Capacity (Gross MWe):

490

7. hfaximum Dependable Capacity (Net MWe):

470 TELEPHONE 315-524-4446 x-'396 dna Station Notes The unit operated at 5ppMx.

100% reactor power level for the majority of the report period with exceptions detail on page 4 of the report.

8. IfChanges Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
9. Power Level to Which Restricted, If Any (Net MWe):
10. Reasons For Restrictions, If Any:

This hfonth Yr.-to-Date Cumulative 744 5,831 3,719.53 508 3,642.5 489.5 5,268,120 710,578 1,763,573 232,527 220,530 1, 674, 717

" 62.47 62.47

61. 11 65.79 65.79 63.07 61.11 63.07 34.21 10.16 ype,'Date and Duration of Each):

ll. Hours In Reporting Period

12. Number of Hours Reactor Was Critical
13. Reactor Reserve Shutdown Hours
14. Hours Generator On-Line
15. Unit Reserve Shutdown Hours
16. Gross Thermal Energy Generated (MWH)
17. Gross Electrical Energy Generated (MWH)
18. Nct Electrical Energy Generated (MWH)
19. Unit Service Factor
20. Unit AvailabilityFactor
21. Unit Capacity Factor (Using hfDC Net)
22. Unit Capacity Factor (Using.DER Net)
23. Unit Forced Outage Rate
24. Shutdowns Scheduled Over Next 6 Months (T 173, 255 135,417.17 132,914.38 8.5
  • 187,238,534 61,562,902 58,419,175 76.72 76.72 73.10 7:3. 10 6.49
25. IfShut Down At End Of Report. Period, Estimated Date of Startup:
26. Units In Test Status (Prior to Commercial Operation):

INITIALCRITICALITY INITIALELECTRICITY COhfhfERCIAL OPERATION Forecast Achieved Murrmlative total comnencing January 1,

1975 Rtv. 4/85 49 88

~

~

I~

P AVERAGE DAILY UNIT POWER LEVEL MONTH Au ust 1989 DOCKET NO.

50-244 UNIT R.E. Ginna Nuclear Power Plant DATE Se te er 15 19 9

COMPLETED BY Robert E.

Do ge TELEPHONE 1

315 524-4446 Ext.

396 at Ginna DAY AVERAGE DAILY POWER LEVEL (MWe-Net)

DAY AVERAGE DAILY POWER LEVEL (MWe-Net)

-10 17.

465 2 ~

-10 18.

465 3 ~

-10 19.

468 4 ~

-10 20.

470 5.

-10 21.

468 6.

-12 22.

466 7 ~

-12 23.

467 8.

24.

467 9 ~

10.

-13

-16 25.

26.

468 470 44 27.

474 12.

316 28.

411 13.

458 29'77 14.

464 30.

472 15.

466 31.

469 16.

464 INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting month.

Compute to the nearest whole megawatt.

DOCK)".I NO.

))N)) NAM). R.E. GINNA NUCLEAR POWER PLANT UNIT SHUTDOWN AND POWER REDUCTIONS DAT)'-

P COMP L)'.TED )3Y REPORT h)ONTH AUGUST4 1989 ge 1 )'.LEP) lONE 315-524-4446 x-396 Gula Statzon No.

Date 0

0 s

0 C0 00 CL tn ~0 c o0 eown c 0

Licensee Event Report h

Ew 0

0 Vl 0 lA (J c0LO c

0 0

E 0

'O Cause g Corrective Action to Prevent Recurrence 89-5 8-1-89 F

254. 5 LER 89-009 1B CRDRVE Continuation of Manual Controlled Shutdown because of (MRPI Systemn Failure) Microprocessor Rod Position Indicator.

, 8-28-89 CRDRVE Problem with the Rod Control System.

Exact problem is unlmown.

F: Forced S:

Scheduled REV. 449 49.89 2

Reason:

A-Equipment Failure (Explain)

B-Maintenance or Test C-Refueling D-Regulatory Restriction E-Operator Training 8t License Examination F-Administrative G-Operational Error (Explain)

H-Other (Explain) hlethod:

1-Manua) 2-hlanual Scram.

3-Automatic Scram.

4-Other (Explain)

Fxhibit G - Instructions for Preparation of Data Entry Sheets for Licensee Event Report (LER) File (NUREG-0161)

Exhibit I - Same Source "Pgwer reduction only.

4 4

NARRATIVE

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO.

50-244 UNIT R.E.

Ginna Nuclear Po~er Plant DATE Se te r 1 1989 COMPLETED BY Robert E.

Dodg TELEPHONE 1

315 524-4446 EXT. 396 at Ginna MONTH Au ust 1989 The unit operated at 100% reactor power level for the majority of the report period, with exceptions detailed below.

On August 1, 1989, the unit remained shutdown due to a Micro-processor Rod Position Indication System (MRPI) failure, which occurred on July 29 1989.

At 1430 EDST, August 11, 1989, the unit went online.

On August 28, 1989 at 0936 EDST, the reactor power level was reduced to 654 due to a problem with the Rod Control System.

The exact cause is unknown at this time.

Westinghouse is investigating the problem.