Docket No.
50-244 AUG 8 1989 Rochester Gas and Electric Corporation ATTN:
Mr. Robert C. Mecredy General Manager Nuclear Production 49 East Avenue Rochester, New York 14649 Gentlemen:
Subject:
Inspection of the Emergency Operating Procedures This letter is to formalize requests made in a conversation between yourself and Mr. P.
W. Eselgroth on July 25,
- 1989, regarding a planned inspection of the Ginna Nuclear Power Plant Emergency Operating Procedures (EOPs) during the period of September 25 through October 6,
1989.
It is requested that the plant-referenced simulator be made available for evaluation of the effective-ness of the EOPs as part of the inspection.
Enclosure 1 is a list of reference material that is requested to be provided to the NRC no later than August 21, 1989.
Enclosure 2 is a tentative schedule for the inspection period, including the required facility support.
Thank you for your cooperation in this matter.
If you have any questions regarding this request, please contact the undersigned at 215-337-5291 or the Inspection Team Leader, Nr. Barry Norris of our staff at 215-337-5171.
Sincerely, r:..'.',.3. S >
~
Richard J. Conte,'cting Chief Operations Branch Division of Reactor Safety
Enclosures:
As stated cc w/encl s:
Harry H. Voigt, Esquire Central Records (4 copies)
Local Public Document Room (LPDR)
Nuclear Safety Information Center (NSIC)
NRC Resident Inspector State of New York 85'08150133 890803 PDR ADQCK 05000244 6
PNU
Rochester Gas
& Electric Corporation 2
bcc w/encls:
Region I Docket Room (with concurrences)
DRP Section Chief C. Stahle, PN, MRR J.
Dyer P. Eselgroth, DRS B. Norris, DRS DRS Files (2) bcc w/o encls:'anagement Assistant, DRMA RI:DRS Norr~is 07/ g /89 DRS:RI Eselgroth 7/31/89 DRS: RI Conge g rb) )
OFFICIAL RECORD COPY ESELGROTH/LETTER/7/31/89 - 0002.0.0 07/31/89
ENCLOSURE 1
REFERENCE MATERIAL FOR EOP INSPECTION Complete procedure index Emergency Operating Procedures Abnormal Operating Procedures Owners'roup Emergency
Response
Guidelines (revision used for the current EOPs)
Procedure Generation
- Package, including:
a.
Plant Specific Technical Guidelines b.
Writer's Guide c.
Verification
& Validation Program d.
Training Plan for the EOPs Deviation document explaining differences between the Owners'roup ERGs and the plant specific EOPs Simulator Malfunction Book Lesson plans and simulator scenarios used in the simulator for training on the EOPs
ENCLOSURE 2
TENTATIVE SCHEDULE AND RE UIRED FACILITY SUPPORT 1st Monday am travel to the site pm training and badging of inspectors 1st Tuesday am entrance
- meeting, meet with facility to resolve initial findings, start interviews of licensed operators pm continue inspection
& interviews 1st Wednesday through 2nd Monday continue interviews and perform control room/plant walk-downs of procedures with facility licensed operators (4-5 every day)
Mid-inspection 1
4 hour4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> time period in simulator for familiarization 2
4 hour4.62963e-5 days <br />0.00111 hours <br />6.613757e-6 weeks <br />1.522e-6 months <br /> time periods in simulator observing two different crews of licensed operators using the EOPs 2nd Tuesday
& Wednesday team wrap-up and preparations for working pre-exit 2nd Thursday working pre-exit with facility staff to resolve findings and obtain commitments (if possible) 2nd Friday Formal exit meeting with facility management