Text
OP ERATING STATUS OPERATING DATA REPORT DOCKET NO.
50 244 DATF 12/11/80 COMPLETED BY 31 Andrew E.
McNam ra TELEPHONE 1 315 524-4446 Ext. 205, 293 at Ginna
- 1. Unit Name:
GINNA STATION
- 2. Reporting Period:
NOVEMBER 1980
- 3. I.iccnsed Thermal Power (hlWt):
- 4. Nameplate Rating (Gross hIWc):
- 5. Design Flcctrical Rating (Net hlWe):
- 6. Maximum Dcpcndable Capacity (Gross hlWc):
49
- 7. hlaximum Dependable Capacity (Nct hlWc):
Notes The unit was shutdown on 11/1 8 0015 for Steam Generators inspec-tion and remained shut down at the end of the reporting period.
- 8. IfChanges Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
- 9. Power Level to Which Restricted, If Any (Nct hIWc):
- 10. Reasons For Restrictions, If Any:
This hlonth Yr.-to Date Cumulative 1 l. Hours In Reporting Period
- 12. Number of Hours Reactor Was Critical
- 13. Reactor Rescrvc Shutdown Hours
- 14. Hours Generator On-Line
- 15. Unit Rcservc Shutdown Hours
- 16. Gross Thermal Energy Gcneratcd
{hlWH)
- 17. Gross Electrical Energy Gcncratcd (MWH)
- 18. Nct Electrical Energy Generated (hlWH)
- 19. Unit Service Factor
- 20. Unit AvailabilityFactor
- 21. Unit Capacity Factor (Using hlDC Net)
- 22. Unit Capacity Factor {Using,DER Nct)
- 23. Unit Forced Outage Rate
- 24. Shutdowns Scheduled Over Next 6 hlonths (Type, 720
.75 8 040 6, 020
.25 5,980.50 72 16
.03%
.03%
.003%
.003%
8,890,848 2 911 845 2 768 396 74.38%
74.38%
- 73. 26%
73.26%
Date and Duration of Each):
96 552 73,699.77 71 937.13 8,5 97, 166, 650 31 597 636 29 929 944 >>>>
- 74. 51%
.51 68.22%
68.22%
- 9. 16%
- 25. If Shut Down At End Of Report,Period, Estimated Date of Startup:
12/2/80 J
- 26. Units In Test Status (Prior to Commercial Operation):
Forecast INITIALCRITICALITY INITIALELECTRICITY COhlhlERCIAL OPERATION
- Cumulative total commencing January 1, 1975
>>>> Adjusted figure.
Incorrectly reported in the October report as 29,929,983; correct figure was 29,929,933.
s oases 0'9 Achieved 4d.dd IREVe 1/7d)
Il h.4
'4 0
AVERAGE DAILYUNIT POWER LEVEL MONTH NOVEMBER 1 980 DAY AVERAGE DAILYPOWER LEVEL (MWe-N et) 10 ll 12 13 14 15 16 DOCKET NQ.
50 244 UNIT II1 @irma Statio DATE 12 11 80 COMPLETED BY Andrew E. McNamara TELEPHONE 1 315 524"4446 Ext. 205,i 293 at Ginna DAY.AVERAGE DAILYPOWER LEVEL (MWe-Net) 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting month.
Compute to the nearest whole megawatt.
40i67 RLV, d/60
1 H
~
=,
H g4 I
'H H ~
H
~
H)HC H H~
~
~
4 NARRATIVE
SUMMARY
OF OPERATING EXPERIENCE DOCKET NO.
Ginna Station, Unit Nl DATE 12 11 80 COMPLETED BY Andrew E. McNamar
@ONTH NOVEMBER~ 1980 TELEPHONE 1 315 524-4446 Ext. 205, 293 at Ginna The unit was shutdown on ll/1/80 I 0015 for Steam Generators inspection, and remained shutdown at the end of the report period.
~
4
- 5 GINNA STATION MAINTENANCE REPORT NOVEMBER, 1980 During November the unit was in a shutdown condition.
Normal maintenance support was given to complete the ISI inspection of the steam generators.
In addition, a motor and seal inspection was completed on the 1B Reactor Coolant Pump.
Other safety related maintenance included:
Replacement of an amplifier for the delta T feeding a reactor protection channel.
2.
Repair of one of the PORV block valves.
3.
Minor weld repair on pinhole leak of a thermowell on the RHR System.
4.
Retaining screws were loctited on over 50 OT2 switches.
~
V
DOCKET NO.
SO-244 Nl Ginna Station UNIT SHUTDOWN AND POWER REDUCTIONS DATE 1 80 COMPLETED BY REPORT MONTHNOVIMBER 1980 q~:.LEPHONE 1 315 524-4446 Ext. 205, 293 at Ginna Dote 0
I 0
~
0 C0 0
Cl Pl L
S <<0 E v 0 <<
0 <<
o n 0 0
CL Licensee Event Report ll Em
~
0 0
Ul 0 IA (J 00 ill C00 E
0 Cause 8L Corrective Action to Prevent Recurrence 801101 S
719.75 B
CC Ht. Exch.
Steam Generators Inspection F: Forced S:
Scheduled 48.88 (REV, t/78)
Reason:
A-Equipment Failure (Explain)
B4faintcnancc or Test C-Refueling D-Regulatory Restriction E-Operator Training & License Examination F-Administrative G-Operational Error (Explain)
H-Other (Explain) 3 hfcthod:
I-hfanual 2-hfanual Scram.
g-Automatic Scram.
4-Other (Explain)
Exhibit G - Instructions for Preparation of Data Entry Sheets for Licensee Event Report (LER) File (NUREG-0161)
Exhibit 1 - Same Source
< Unit remained shutdown at the end of the report period.
II, t \\
I
< "I I