ML17250A831

From kanterella
Jump to navigation Jump to search
Monthly Operating Rept for Nov 1980
ML17250A831
Person / Time
Site: Ginna Constellation icon.png
Issue date: 12/11/1980
From: Mcnamara A
ROCHESTER GAS & ELECTRIC CORP.
To:
Shared Package
ML17250A830 List:
References
NUDOCS 8012220443
Download: ML17250A831 (10)


Text

OP ERATING STATUS OPERATING DATA REPORT DOCKET NO.

50 244 DATF 12/11/80 COMPLETED BY 31 Andrew E.

McNam ra TELEPHONE 1 315 524-4446 Ext. 205, 293 at Ginna

1. Unit Name:

GINNA STATION

2. Reporting Period:

NOVEMBER 1980

3. I.iccnsed Thermal Power (hlWt):
4. Nameplate Rating (Gross hIWc):
5. Design Flcctrical Rating (Net hlWe):
6. Maximum Dcpcndable Capacity (Gross hlWc):

49

7. hlaximum Dependable Capacity (Nct hlWc):

Notes The unit was shutdown on 11/1 8 0015 for Steam Generators inspec-tion and remained shut down at the end of the reporting period.

8. IfChanges Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
9. Power Level to Which Restricted, If Any (Nct hIWc):
10. Reasons For Restrictions, If Any:

This hlonth Yr.-to Date Cumulative 1 l. Hours In Reporting Period

12. Number of Hours Reactor Was Critical
13. Reactor Rescrvc Shutdown Hours
14. Hours Generator On-Line
15. Unit Rcservc Shutdown Hours
16. Gross Thermal Energy Gcneratcd

{hlWH)

17. Gross Electrical Energy Gcncratcd (MWH)
18. Nct Electrical Energy Generated (hlWH)
19. Unit Service Factor
20. Unit AvailabilityFactor
21. Unit Capacity Factor (Using hlDC Net)
22. Unit Capacity Factor {Using,DER Nct)
23. Unit Forced Outage Rate
24. Shutdowns Scheduled Over Next 6 hlonths (Type, 720

.75 8 040 6, 020

.25 5,980.50 72 16

.03%

.03%

.003%

.003%

8,890,848 2 911 845 2 768 396 74.38%

74.38%

73. 26%

73.26%

Date and Duration of Each):

96 552 73,699.77 71 937.13 8,5 97, 166, 650 31 597 636 29 929 944 >>>>

74. 51%

.51 68.22%

68.22%

9. 16%
25. If Shut Down At End Of Report,Period, Estimated Date of Startup:

12/2/80 J

26. Units In Test Status (Prior to Commercial Operation):

Forecast INITIALCRITICALITY INITIALELECTRICITY COhlhlERCIAL OPERATION

  • Cumulative total commencing January 1, 1975

>>>> Adjusted figure.

Incorrectly reported in the October report as 29,929,983; correct figure was 29,929,933.

s oases 0'9 Achieved 4d.dd IREVe 1/7d)

Il h.4

'4 0

AVERAGE DAILYUNIT POWER LEVEL MONTH NOVEMBER 1 980 DAY AVERAGE DAILYPOWER LEVEL (MWe-N et) 10 ll 12 13 14 15 16 DOCKET NQ.

50 244 UNIT II1 @irma Statio DATE 12 11 80 COMPLETED BY Andrew E. McNamara TELEPHONE 1 315 524"4446 Ext. 205,i 293 at Ginna DAY.AVERAGE DAILYPOWER LEVEL (MWe-Net) 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting month.

Compute to the nearest whole megawatt.

40i67 RLV, d/60

1 H

~

=,

H g4 I

'H H ~

H

~

H)HC H H~

~

~

4 NARRATIVE

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO.

Ginna Station, Unit Nl DATE 12 11 80 COMPLETED BY Andrew E. McNamar

@ONTH NOVEMBER~ 1980 TELEPHONE 1 315 524-4446 Ext. 205, 293 at Ginna The unit was shutdown on ll/1/80 I 0015 for Steam Generators inspection, and remained shutdown at the end of the report period.

~

4

- 5 GINNA STATION MAINTENANCE REPORT NOVEMBER, 1980 During November the unit was in a shutdown condition.

Normal maintenance support was given to complete the ISI inspection of the steam generators.

In addition, a motor and seal inspection was completed on the 1B Reactor Coolant Pump.

Other safety related maintenance included:

Replacement of an amplifier for the delta T feeding a reactor protection channel.

2.

Repair of one of the PORV block valves.

3.

Minor weld repair on pinhole leak of a thermowell on the RHR System.

4.

Retaining screws were loctited on over 50 OT2 switches.

~

V

DOCKET NO.

SO-244 Nl Ginna Station UNIT SHUTDOWN AND POWER REDUCTIONS DATE 1 80 COMPLETED BY REPORT MONTHNOVIMBER 1980 q~:.LEPHONE 1 315 524-4446 Ext. 205, 293 at Ginna Dote 0

I 0

~

0 C0 0

Cl Pl L

S <<0 E v 0 <<

0 <<

o n 0 0

CL Licensee Event Report ll Em

~

0 0

Ul 0 IA (J 00 ill C00 E

0 Cause 8L Corrective Action to Prevent Recurrence 801101 S

719.75 B

CC Ht. Exch.

Steam Generators Inspection F: Forced S:

Scheduled 48.88 (REV, t/78)

Reason:

A-Equipment Failure (Explain)

B4faintcnancc or Test C-Refueling D-Regulatory Restriction E-Operator Training & License Examination F-Administrative G-Operational Error (Explain)

H-Other (Explain) 3 hfcthod:

I-hfanual 2-hfanual Scram.

g-Automatic Scram.

4-Other (Explain)

Exhibit G - Instructions for Preparation of Data Entry Sheets for Licensee Event Report (LER) File (NUREG-0161)

Exhibit 1 - Same Source

< Unit remained shutdown at the end of the report period.

II, t \\

I

< "I I