~ OPERATING STATUS OPERATING DATA REPORT DOCKET NO.

50 244 DATE November 10, 1980 COMPLETED BY Andrew E. McNamara TELEPHONE 1-315-524-44 6

Ext. 205, 293

1. Unit Name:

GINNA STATION U

3. Licensed Thermal Power (MWt):
4. Nameplate Rating (Gross MWe):
5. Design Electrical Rating (Net hlWe):
6. Maximum Dependable Capacity (Gross MWe):
7. Maximum Dependable Capacity (Net MWe):
8. IfChanges Occur in Capacity Ratings (Items 490 470 Notes The Reactor power Level averaged 100% for the report month, with a few minor exceptions to perform periodic tests;
also, a

turbine runback was experienced.

Number 3 Through 7) Since Last Report, Give Reasons:

9. Power Level to Which Restricted, If Any (Net MWe):
10. Reasons For Restrictions, If Any:

This Month Yr.-to-Date Cumulative 745 352 101 ll. Hours In Reporting Period

12. Number of Hours Reactor Was Critical 745
13. Reactor Reserve Shutdown Hours 0
14. Hours Generator On-Line 745
15. Unit Reserve Shutdown Hours
16. Gross Thermal Energy Generated (MWH) 4
17. Gross Electrical Energy Generated (MWH)
18. Net Electrical Energy Generated (hIWH)

]

0/

19. Unit Service Factor

]

0/

20. Unit AvailabilityFactor 100 e5'1.

Unit Capacity Factor (Using hlDC Net)

~ M

/o

22. Unit Capacity Factor (Using,DER Net) 100.55%
23. Unit Forced Outage Rate 0'I
24. Shutdowns Scheduled Over Next 6 Months (Type, Date and Duration December 1

1980 7 320 6 019.25 5

80. 25 8 890 776 2 911 829 2 768 385 81.69%

81.69%

80.46%

80.

46'f Each):

95 832 73 699.02

~97166 5 8 31 597 620 2

92 83 75.06%

75.07%

75.07%

25. If Shut Down At End Of Report. Period, Estimated. Date of Startup:
26. Units In Test Status (Prior to Commercial Operation):

~

INITIALCRITICALITY INITIALELECTRICITY COMhlERCIAL OPERATION

>> Eastern Daylight Savings Time to Eastern Standard Time

>>>> Cumulative da'ta commencing January 1,

1975 Forecast Achieved 49 dd (Rave I/76) sozzlso~94

~

1 I

II ~

P gA

I t

AVERAGE DAILYUNIT POWER LEVEL DOCKET-NO. '

UNIT Nl pinna Station November 10, 1980 COMPLETED BY Andrew E McNama a

MONTH

October, 1980 DAY AVERAGE DAILYPOWER LEVEL (MWe-N et)

TELEPHONE Ext.

205, 293 DAY AVERAGE DAILYPOWER LEVEL (MWe-Net) 10 12 13 14 15 16 473 473 472 472 472 472 473 474 475 473 473 474 474 475 475 474 17 18 1S 20 21 22 23 24 25 26 27 28 29 30 31 475 474 475 475 474 474 474 475 475 476 475 475 475 476 INSTRUCTIONS On this format, list the average daily unit power level in MWe-iNet for each day in the reporting month.

Compute to the nearest whole megawatt.

40 $7 RdV

$/$0

a

DOCK)'.T Np.

~o.244 UN)1'NAh)l:

II1 Ginna St UNIT SHUTDOWN AND POWER REDUCTIONS Cph)P L)'.'I'I'.D BY Andrew E.

cNamaba REppRT I)ONTI) October 1980 q ELEP))pNE 1-315-524-4446 Ext. 205, 293 Date C0 ag 0

~

o BX:

C0 o

Cl 0

r u 0

0 I/7 C

0 Licensee Event Report If Em

~

0 0

vl oo I/7 co Ln C0 Q

O E

0 O

.Cause L Corrective Action to Prevent Recurrence No shutdowns or significant power reductions to report.

F:

Forced S:

Scheduled 80-80 lncv, t/78)

Reason:

A-Equipmcnt Failure (Explain) l3-h)aintcnancc or Test C-Rcfucling D-Regulatory Restriction E-Operator Training 8: I.iccnse Examination F-Administrative G-Operational Error (Explain)

Il-Other (Explain)

I 3

hlcthod I-hlanual 2-hfanua) Scram.

3-Automatic Scram.

4-.Other (Explain)

Exhibit G - Instructions for Preparation of Data Entry Sheets for Licensee Event Rcport (LER) File (NUREG-0161)

Exhibit I - Same Source

~

h i

0

4>>

NARRATIVE

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO.

0-2 UNIT Ginna Station Unit 1

DATE November 10 1980 COMPLETED BY Andrew E.

McNamar TELEPHONE 1-315 "524-4446 MONTH October 1980 The reactor power level averaged 100% for the majority of the report month.

Exceptions were three small power reductions, the lowest to the 95% level, to perform periodic tests on the Auxiliary Feedwater System.

Also, a turbine runback to approximately 83% power level occurred on 10/31, due to an erratic delta T channel resulting in an overpower delta T runback.