ML17250A505

From kanterella
Jump to navigation Jump to search
Forwards IE Bulletin 80-20, Failures of Westinghouse Type W-2 Spring Return to Neutral Control Switches. Requests Info Re Estimate of Manpower Associated W/Corrective Actions Needed After Identifying Problem
ML17250A505
Person / Time
Site: Ginna Constellation icon.png
Issue date: 07/31/1980
From: Grier B
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: White L
ROCHESTER GAS & ELECTRIC CORP.
References
NUDOCS 8008140543
Download: ML17250A505 (2)


Text

f r

<p,R REOy.

~C P0 1

~c

+**++

Docket No. 50-244 UNITED STATES NUCLEAR REGULATORY COMMISSION REGION I 631 PARK AVENUE KING OF PRUSSIA, PENNSYLVANIA19406 July 31, 1980 Rochester Gas and Electric Corporation ATTN:

Mr.

Leon D. White, Jr..

Vice President Electric and Steam Production 89 East Avenue Rochester, New York 14649 Gentlemen:

Enclosed is IE Bulletin No. 80-20 which requires action by you with respect to your nuclear power facility(ies).

In order to assist the NRC in evaluating the value/impact of each Bulletin on licensees, it would be helpful if you would provide an estimate of the manpower expended in conduct of the review and preparation of the report(s) required by the Bulletin. Please estimate separately the manpower associated with corrective actions necessary following identification of problems through the Bulletin.

Should you have any questions regarding the Bulletin or actions required by you, please contact this office.

Sincerely, B y e H. Grier Director

Enclosures:

1.

IE Bulletin No. 80-20 with Enclosure 2.

List of Recently Issued IE Bulletins CONTACT:

E.

G.

Greenman (215-337-5267) cc w/encls:

B.

A. Snow, Plant Superintendent T.

R. Schuler, gC Engineer Harry H. Voigt, Esquire J.

T. St.,Martin, Technical Assistant, Operations Engineer 8 0 0 8 1 405/3 g

~

+I