Ack Receipt of Re Piping Seismic Analysis.Design Criteria Will Be Submitted by 800715 & Stress Analysis Repts for A-RHR & B Main Steam Lines Inside Containment Will Be Submitted by 800915.Mod Schedule Will Be Based on Analyses
ML17250A305
Person / Time
Site: Ginna Constellation icon.png
Issue date: 05/30/1980
From: White L
ROCHESTER GAS & ELECTRIC CORP.
To: Crutchfield D
Office of Nuclear Reactor Regulation
References
NUDOCS 8006040237
Download: ML17250A305 (4)


Text

REGULATORY ORMATION DISTRIBUTION SY' (RODS)

ACCESSION NBR 8006040237 DOC ~ OATEN'0/05/30 NOTARIZED!

NO DOCKET FACIL:50"244 Robert Emmet Ginna Nuclear Plentr Unit ii'ochester G

05000244 AUTH,NAME AUTHOR AFFILIATION NHITEiL>>D~

Rochester Gas 8 Electric Corp, RECIP ~ NAME RECIPIENT AFF ILI'ATION Office of Nuclear Reactor Regulation CRUTCHF IELD E D, Operating Reactors Branch 5

r

SUBJECT:

Ack r'eceipt of 800429 ltr re piping seismic analysis'esign criteria will be submitted by 800715 8 str'ess analysis repts for A-RHR 8

B main steam lines inside containment wj]1 be submitted by 800915,Mod schedule will be based on analyses'ISTRIBUTION CODE:

A02BS COPIES RECEIVED:LTR /

ENCL Q

SIZE: J TITLE: Seismic Review for SEP Plants.

05 BC dR8 +m 5

1 1

6 1

ACTION:

INTERNAL:

0 10 SEP BR "13 GEOSCI BR OELD 02 NRC PDR il I8E 19 ENGR BR N0TEs: 1+: Q>> QLc.lso&L E. ~IrsltJsl9~

RECIPIENT COPIES REC IP IENT ID CODE/NAME LTTR ENCL ID CODE/NAME COPIES LTTR ENCL EXTERNAL: 03 LPDR 20 ACRS 1

16 1

t 04 NSIC i tSSQ TOTAL NUMBER OF COPIES REQUIRED:

LTTR 36 ENCL

0, h

I f

4 1

III

/IIIIIIEIIIS IIIIIIIIII gkst ONIA1 PI

~

(gdjjVI ISIIII ROCHESTER GAS AND ELECTRIC CORPORATION o

89 EAST AVENUE, ROCHESTER, N.Y. 74649 NE ~

I LEON D. WHITE. JR.

VICE PRESIDENT TELEPHONE AREA CODE 7 ld 546 ? 700 May 30, 1980 Director of Nuclear Reactor Regulation Attention:

Dennis M. Crutchfield, Chief Operating Reactors Branch No.

5 Division of Licensing U.S. Nuclear Regulatory Commission Washington, D.C.

20555

Subject:

Ginna Piping Seismic Analysis R.E. Ginna Nuclear Power Plant Docket No. 50-244

Dear Mr. Crutchfield:

We are in receipt of your April 29, 1980 letter regarding Ginna piping seismic analysis.

The schedule for our seismic upgrade program has been reviewed to determine when the informa-tion you requested will be available for use on the Systematic Evaluation Program.

The Design Criteria, including the specific items listed in your letter, will be submitted by July 15, 1980.

The stress analysis reports for the A-RHR and B-Main, Steam lines inside containment will be submitted by September 15, 1980.

The stress analyses for the CVCS and sample field run piping are scheduled for completion in June 1981.

Based on this schedule, the reports for these lines could be submitted by July 15, 1981.

The schedule for completion of potential modifications for the seismic upgrade program will be based on the results of the analyses.

Sincerely yours, LDW:rb L.D. White, Jr.