ML17249A898

From kanterella
Jump to navigation Jump to search
Monthly Operating Rept for Apr 1980
ML17249A898
Person / Time
Site: Ginna Constellation icon.png
Issue date: 05/08/1980
From: Mcnamara A
ROCHESTER GAS & ELECTRIC CORP.
To:
Shared Package
ML17249A897 List:
References
NUDOCS 8005130379
Download: ML17249A898 (8)


Text

~

~

80 05X 3 Q97V I -

g OPERATlNG DATA REPORT DOCKET NO. 50 244 DATE Ma 8 1980 COMPLETED BY Andrew E. McNamar TELFPIIONE 1-315-524-4446 OPERATliVG STATUS Ext. 293, at Ginna I . Ilnit Name: GiiVNA STATION UN Notes 2 Reporting Pcr;od. ~Aril 1980 Annual Refueling and

,5. I.icenscd Thermal Power (hfWt): Maintenance Shutdown f.

continued.

Namcplatc Rating (Gross MWc):

'i. 1)csign I'.Icctrical Rating (Nct MWe):

6. hfaximum Dcpcndable Capacity (Gross hfWe): 90

. hfaximum Dependable Capacity (Net hfWc):

8. lf Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:

'). Power Level to Which Restricted, If Any (Nct MWc):

It). Reasons For Restrictions, If Any:

This hfonth Yr.-to-Date Cumulative I I. Ilours In Reporting Period 719 2 903 91 415

12. Number of Hours Reactor Was Critical 0 2 114.75 69 794.52 I I Reactor Rescrvc Shutdown Hours 1,621.57
  • I 'i. Ilours Generator On-Line 2 114.50 68 071.13 IS. IInit Rc>>ervc Shutdown Hours 8.5 Yr I 6. Gross Thermal Energy Genera(cd (hfWH) 3 118 656 91 394 458 I'. Gross Electrical Energy Generated (MWkl) 0 1 021 026 29 706 997 III. iVet Flcctrical Energy Generated (hfWH) 970,811 28,132,359 I 9 Unit bcfvlcc Factor po 72.83/ 74.46%

2i). Iinit Availability Factor 00 72.83% 74.47%

2l. Unit Capacity I actor (Using hfDC Net) 0% 71.15% 67.85%

22. Unit Capacity Factor (Using,DER Nct) 0/ 71.15% 67.85%

2.$ . Unit Forced Outage Rate 0% 0% 9. 63%

2 f. Shutdowns Scheduled Over Next 6 hfonths (Type, Date and Duration of Each):

2>. If Shut Down At End Of Report. Period, Estimated Date of Startup: May 17, 1980

26. Units In Test Status (Prtor to Commercial Operation): Forecast Achieved INITIALCRITICALITY INITIALELECTRICITY COhfhfERCIAL OPERATION

"< Cumulative Total Commencing January 1, 1975 49 18 iRKV, I jTii)

~ r

0 AVERAGE DAILY UNIT POWER UNIT DOCKET NQ. -50 244 UNIT O'I pinna Statio May 8, 1980 COMPLETED BY Andrew E. McNamara TELEPHONE 1-315 524-444-6 Ext. 293, at Ginna A ril 1980 REFUELING AND MAINTENANCE SHUTD(NN CONTINUED DAY AVERAGE DAILYPOWER LEVEL DAY, AVERAGE DAlLY POWER LEVEL'M (M We-N et) We-Net) 17 18 19 20 21 22 23 24 25 10 26 21 12 28 13 29 14 30 15 31 16 INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting month, Compute to the nearest whole megawatt.

49 87 (RKV 1/789

V DO(:KI:.T NO.

llNll'NAhlE Nl Ginna Station UNIT SHUTDOWN AND POWER REDUCTIONS DATI'. M

(:OhlPLETI'.D IIY E9 ndrew E. McNamaha tt'~~

1 I'.LI'.P)lONE 1-315 6 Ext. 293, at Ginna P4 01 ~u0 C 0 II1 0 C C Licensee Em C Cause & Corrective 4 0 0 0 No. Date 0 0 0 Event 0 Action to 0

~

0 X.'- 0 0EA C Report II 0 IA (J Eo Prevent Recurrence lJ n0 Annual Refueling and Maintenance Shutdown continued.

I F: Forced Reason: hlethod: Exhibit G - Instructions St Scheduled A-Etluipmcnt Failure (Explain) I -hfanual for Preparation of Data ll-hlaintenancc or 1'cst 2-hlanual Scram. Entry Shccts for Liccnscc C-Refueling 3-Automatic Scram. Event Report (LER) File (NUREG-D-Regulatory Restriction 4-Other (Explain) 0161)

E-Operator Training 8: Liccnsc Examination F-Administrative G-Operational Error (Explain) 49 99 1Ravo 1/791 II-Other (Explain) Exhibit 1 - Same Source

c 5 aa 4-NARRATIVE

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO. 0-2 UNIT Ginna Stat on DATE COMPLETED BY Andrew E. McNamar TELEPHONE I."315-524-4446 Ext. 293, at Ginna MONTH A ril 1980 Annual Refueling and Maintenance Shutdown continued.

49 123 (1/7$ )

~ .r-~