Text
OPERATING STATUS OPERATING DATA REPORT DOCKET NO.
50-244 DATE A ril 10 1980 COhfPLETED BY F.>
Andrew E. McNamara TELEPHONE 1-315-524-4446 Ext. 293, at Ginna I ~ Unit Name:
GINNA STATION U
- 2. Reporting Period:
March 1980
- 3. Licensed Thermal Power (hlWt):
- 4. Namcplatc Rating (Gross hlWe):
49
~. Design Electrical Rating (Net hfWe):-
- 6. hfaximum Dependable Capacity (Gross hfWc):
- 7. hfaximum Dependable Capacity (Net hfWc):
8 ~ IfChanges Occur in Capacity Ratings (Items 490 Notes The Reactor Power Level averaged 100% until'3/10, when problems with 5B Feedwater Heater necessitated a reduc-tion to ~ 98%.Unit load coast-down commences on 3/17, unit refueling shutdown on 3/29.
Number 3 Through 7) Since Last Report, Give Reasons:
- 9. Power Level to Which Restricted, IfAny (Net hfWe):
- 10. Reasons For Restrictions, IfAny:
This hfonth Yr.-to-Date 2 184 2,114.75 0
2 114 50 0
3 118 656 1 021 206 970 811 96.82%
96.82%
94.58%
94 58%%u 0%
I l. Ilours In Reporting Period 744
- 12. Number of Hours Reactor Was Critical 674.5
- 13. Reactor Reserve Shutdown Hours
- 14. Ilours Generator On-Line 674.5
- 15. Unit Reserve Shutdown Hours
- 16. Gross Thermal Energy Generated (hfWH)
- 17. Gross Electrical Energy Generated (hfWH)
- 18. Nct Electrical Energy Generated (hfWH)
- 19. Unit Service Factor 90.66%
- 20. Unit AvailabilityFactor
- 90. 66%
- 21. Unit Capacity Factor (Using hfDC Net) 81.89%
- 23. Unit Forced Outage Rate 0~
- 24. Shutdowns Scheduled Over Next 6 Months (Type, Date and Duration of Each):
Cumulative 90,696, 69 794.52 1 621.57
- 6 0113 134 58 29 706 997 28 132 359 75.05%
75.06%
68.41%
68 1
9 63%
- 25. If Shut Down At End Of Report. Period, Estimated Date of Startup:
May 10~ 1980
- 26. Units In Test Status (Prior to Commercial Operation):
Forecast INITIALCRITICALITY INITIALELECTRICITY COhfhfERCIAL OPERATION
+ Cumulative total commencing January 1,,1975 Achieved 40 d8 tREVI 0/78) s 0041so 3~
L ~
~ k AVERAGE DAILYUNIT POWER UNIT MONTH March 1980 DAY AVERAGE DAILYPOWER LEVEL (MWe-Net)
DOCKET NO.. 50-244 UNIT ¹1
@irma Start r
10 1 80 COMPLETED BY Andrew E. McNamara TELEPHONE 1"315-524" 4446 Ext. 293, at Ginna DAY, AVERAGE DAILYPOWER LEVEL (MWe-Net) 10 11 12 13 14 15 16 46 472 472 473
. 474 475 476 464 464 464 464 ll 18 20 21 22 23 24 25 26 27 28 29 30 31 463 458 453 432 377 361 355 34 306 285 285 284 36 INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting month.
Compute to the nearest whole megaw'att.
49 87 tRKVe 1/70)
- b. ~
4 UNIT SHUTDOWN AND POWER REDUCTIONS RF PORT MONTIIMarch 1980 DO(:Kl'.T NO.
Nl Ginna Station DATE A ri 10 1980
(:OMPLI'.Tl'.D BY f e QW4rfl~
Andrew E. McNamara TELEPIIONE 1-315" 524-4446 Ext. 293, at Ginna Date C0 e~
4 a
0 oz Cl ~
trt C0 40 tC tn r-0 C
V 0 lb C
0O Licensee Event Report It E w-.
0 Vl 40
%0 C0 Ir1 C
0 E
0 O
Cause ga Corrective Action to Prevent Recurrence 800329 S
69 5*
C Annual Refueling and Maintenance.
- Shutdown hours in month of
'March only..
F:
Forced S:
Scheduled 40 00 (neve 1/7dl Reason:
A-Equipmcnt Failure (Explain)
B-hlaintcnancc or Test C-Refueling D-Regulatory Restriction E-Operator Training & License Examination F-Administrative G-Operational Error (Explain)
II-Other (Explain) hlethod:
1-hlanual 2-hlanual Scram.
3-Automatic Scram.
0-Other (Explain)
Fxhibit G - Instructions for Preparation of Data Entry Sheets for Licensee Event Report (LER) File (NUREG-0161)
Exhibit 1 - Same Source
4 ~
wl
NARRATIVE
SUMMARY
Of OPERATING EXPERIENCE DOCKET NO.
gl, Ginna Station DATE A ril 10 1980 COMPLETED BY Andrew E. McNamar MONTH March 1980 TELEPHONE 1-315 524-4446 Ext.
293 The Reactor Power Level averaged 100%%u until March 10, when the Power Level was reduced to ~98%,
due to problems with the 5B Feedwater Heater.
Tt remained at this level until 3/17 when Unit Load Coastdown commenced.
On 3/21 a further reduction was prompted by further problems with the 5B Feedwater Heater.
Unit Shutdown for annual Refueling and Maintenance commenced on 3/29.
1
4
~
~ GINNA STATION MAINTENANCE REPORT FOR MARCH, 1980 During March, normal inspections and minor maintenance were performed.
Immediate major safety related maintenance was not required and all preventive maintenance was postponed until the Refueling Outage which commenced at the end of March.
~
~