Text
gp,R At'Cy
~C Wp i'w 0
C O
UNITEDSTATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D. C. 20555
++*++
ROCHESTER GAS AND ELECTRIC CORPORATION DOCKET NO. 50-244 R. E.'INNA NUCLEAR POWER PLANT AMENDMENT TO PROVISIONAL OPERATING LICENSE Amendment No.
30 License No.
DPR-18 1.
The Nuclear Regulatory Commission (the COIImIission) has found that:
A.
B.
C.
D.
E.
The application for amendment by Rochester Gas and Electric Corporation (the licensee) dated November 14,
'I979 (trans-mitted by letter dated November 19, 1979), complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regu-lations set forth in 10 CFR Chapter I; The facility will operate in conformity with the application, the provisions of the act, and the rules and regulations of the COIImIission; There is reasonable assurance (i) that the activities autho-rized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activ-ities will be conducted in compliance with the ConmIission's regulations; The issuance of this amendment will not be inimical to the colon defense and security or to the health and safety of the public; and The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.
I 8'0081 go 2.
Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment and paragraph 2.C(2) of Provisional Operating License No.
DPR-18 is hereby amended to read as follows:
II (2)
Technical S ecifications The Technical Specifications contained in Appendix A, as revised through Amendment No. 30, are her'eby incorporated in the license.
The licensee shall operate the facility in accordance with the Technical Specifications.
3.
This license amendment is effective as of the date of its issuance.
Attachment:
Changes to the Technical Specifications FOR THE NUCLEAR )EGULATORY COMMISSION Dennis L. Zieman Chief Operating Reactors Branch b'2 Division of Operating Reactors Date of Issuance:
January 23, ]980
r
ATTACHt1ENT TO LICENSE AMENDMENT NO.
30" PROVISIONAL OPERATING LICENSE NO.
DPR-18 DOCKET NO. 50-244 Revise Appendix A Technical Soecifications by r'emoving the page identi-fied below and insertinq the enclosed page.
The revised page contains the captioned amendment number and a vertical line indicating the area of change.
Paqe 6.'2-1
c.
At least two licensed Operators shall be present in the control room during reactor start-up, scheduled P
reactor shutdown and during recovery from reactor grips caused by transients or emergencies d.
All core altqrations shall be directly suoervised by either a licensed Senior Reactor Operator or Senior
'eactor Operator Limited,to Fuel Handling who has no other concurrent responsibilities during this opera-tion.
e.
An individual qualified in radiation protection pro-cedures shall be on site when fuel is in the reactor.
f.
A Fire Brigade of 5 members shall be maintained on site at all times".
This excludes the two members of the minimum shift crew necessary for safe shutdown.
- Fire Brigade comoosition may be less than the mini-mum requirements for a period of time not to exceed 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> to accomnodate unexpected absence of Fire Brigade members provided irrmediate action is taken to restore the Fire Brigade to the minimum require-ments'~
6.2-1 Amendment No. W, 30