OPERATING DATA REPORT

. DOCKET NO.

5 24 DATE October ll 197 COMPLETED BY EM Andrew E.

McNam a

OPERATING STATUS TELEPHONE 1-716-546-2700 Ext. 291-205, at Ginna

1. Unit Name:

GINNA STATION UN tt

2. Reporting Period:
3. Licensed Thermal Power (MWt):
4. Nameplate Rating (Gross MWe):

490

5. Design Electrical Rating (Net MWe):
6. Maximum Dependable Capacity (Gross MWe):
7. Maximum Dependable Capacity (Net MWe):

Notes There were no outages in the Report Period.

The Reactor Power Level averaged 100%, with the exceptions noted on Page 4.

8. IfChanges Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:
9. Power Level to Which Restricted, If Any (Net bfWe):
10. Reasons For Restrictions, If Any:

This Month Yr:to-Date Cumulative l

11. Hours In Reporting Period
12. Number of Hours Reactor Was Critical
13. Reactor Reserve Shutdown Hours
14. Hours Generator On-Line
15. Unit Reserve Shutdown Hours
16. Gross Thermal Energy Generated (MWH)
17. Gross Electrical Energy Generated (MWH)
18. Net Electrical Energy Generated (MWH)
19. Unit Service Factor
20. Unit AvailabilityFactor
21. Unit Capacity Factor (Using MDC Net)
22. Unit Capacity Factor (Using DER Net)
23. Unit Forced Outage Rate
24. Shutdowns Scheduled Over Next 6 Months (Type, 720 720 6 551 4 672.65 720 4 598 1,084 848 357 511 340 186 100%

100%

100.53%

100.53%

0%

6 709 848 2 242 242 2 132 345 70.2%

70.2%

69.26%

69.26%

.22%

Date and Duration of Each):

65 875.07 64 176.6 8.5 *

.85 639 762 27 815 482 26 333 383 74.4%

74.4%

67.43%

67.43%

9.62%

Annual Refuelin

& Overhaul tentativel scheduled fo Ma

25. If Shut Dovrn At End Of Report. Period, Estimated Date of Startup:
26. Units In Test Status (Prior to Commercial Operation):

~

.INITIALCRITICALITY INITIALELECTRICITY COMMERCIAL OPERATION

  • Cumulative data commencing January 1,

1975 Forecast Achieved 49 08 (RKYe 1/76)

gC I

l t

I AY GE DAILYUNIT POWER UNIT MONTH September, 1979 DAY AVERAGE DAILYPOWER LEVEL (MWe-N et)

DOCKET NO. - ~

4" UNIT Ill pinna Statio DATE October 1 1, 1979 COMPLETED BY Andrew ED McNamara TELEPHONE 1-716-546-2700 Ext. 291-'205, at Gonna DAY,AVERAGE DAILYPOWER LEVEL (MWe-N et) 10 12 13 14 15 472 474 472 471 471 473 471 472 472 471 473 474 476 475 475 417 17 18 20 21 22 23 24 25 26 27 28 28 30 31 473 475 476 476 475 475 476 476 477 476 476 477 477 477 INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting month.

Compute to the nearest whole megawatt.

49.8T IREV I/76>

0 5 ~

REPORT hlONTII 1979 UNIT SHUTDOWN AND POWER REDUCTIONS DO(:Kl'.T NO.

~o-244 UNII'NAhil: Nl Ginna Station l)A1 >:.

tt~

1~7

(:OhIPLI:.1 E.D IIY Andrew E. HcNamar&

I'ELI.'PIIONE 1-716-546-2700 Ext. 291-205; at Ginna Date C0 Q

~

o ar C0 a

Cl tL 0

c v 0

> tL OlA C 0

Licensee Event Report 0

Ew 0

Vl l70 EA Q 0 lA C

n. o go O

Cause 8 Corrective Action to Prevent Recurrence No outages or significant power reductions to report.

I F:

Forced S:

Scheduled 49 99 tncv, 1/78)

Reason:

A-I'.rluipmcnt I'ailurc (I'.xplain) 13-hie intcnancc or 1 cst C-Rcfucling D-Regulatory Restriction E-Operator Training 8: I.iccnsc Examination F-Administrative G-Operational Error (Explain) ll-Other (Explain) 3 hlcthod:

I-hlanual 2-hlanual Scram.

3-Au toma tie Scram.

4-Other (Explain)

Exhibit G - Instructions for Preparation of Data Entry Sheets for Licensee Event Rcport (LER) File (NUREG-0161)

Exhibit I - Same Source

0 cl

4" NARRATIVE

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO.

0-2 UNIT Ginna Station Unit /!1 DATE October ll 1979 COMPLETED BY Andrew E. McNamara MONTH Se tember 1979 TELEPHONE 1-716-546-2700 Ext. 291-205, at Ginna The Reactor Power Level averaged n 100% for the Report Month.

The only exceptions were some power level reductions of short duration to perform

'he monthly turbine stop valve test and the periodic test of the Auxiliary Feedwater System.

C

GINNA STATZON iMXNTENANCE REPORT FOR SEPTEMBER 1979 During September, normal inspections and minor maintenance was performed.

Major safety related maintenance included:

1.

Replacement of the Vaportec Light oil installed in the Turbine Driven Auxiliary Feedwater Pump per IE Circular 78-02 with the old type oil Mobil DTE797.

The Vaportec Light Oil became gummy, clogging the gover-nor components.

The governor was cleaned and the unit returned to service.

2.

Checkout of the Bus 16 Breaker from the 1B Diesel Generator Feed.

Operations was not able to tie the diesel to this bus during the monthly periodic test.

The cause was attributed to a dirty relay contact.

0

  • MA)>>

i ~