(PNPS) Owners Activity Report (OAR-1) for Cycle 21
ML17249A122
Person / Time
Site: Pilgrim
Issue date: 08/22/2017
From: Perkins E
Entergy Nuclear Operations
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
2.17.063
Download: ML17249A122 (6)


Text

  • ~Entergx Entergy Nuclear Operations, Inc.

Pilgrim Nuclear Power Station 600 Rocky Hill Road Plymouth, MA 02360 August22,2017 U.S. Nuclear Regulatory Commission Att11: Document Control Desk Washington, DC 20555-0001

SUBJECT:

Pilgrim Nuclear Power Station (PNPS) Owners Activity Report (OAR-1) for Cycle 21 Entergy Nuclear Operations, Inc.

Pilgrim Nuclear Power Station Docket No. 50-293 Renewed License No. DPR-35 LETTER NUMBER: 2.17.063

Dear Sir or Madam:

By this letter Entergy submits to the Nuclear Regulatory Commission (NRC) the attached Pilgrim Nuclear Power Station (PNPS) Owners Activity Report (OAR-1) for Cycle 21.

This report has been prepared in accordance with the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code,Section XI 2007 with 2008 addenda and NRC approved Code Case N-532-5. The report has been certified by the Authorized Nuclear lnservice Inspector (ANll) attesting that all code-required examinations and repair/re'placement activities at PNPS during Cycle 21 were performed in accordance with the requirements of the ASME Section XI.

If you have any questions regarding the information contained in this letter, please contact me at (508) 830-8323.

There are no regulatory commitments contained in this letter.

Sincerely,

~~lL:.~

Evere~t P. (Chip) Perkins, Jr:

Regulatory Assurance Manager EPP/sc

Attachment:

Engineering 'Report No. PNPS-RPT-17-00002, Rev. 0 "PNPS Owners Activity Report (OAR-1) for Cycle 21" (3 pages)

Letter Number: 2.17.063 Page 2 of 2 cc: Mr. Daniel H. Dorman Regional Administrator, Region I U.S. Nuclear Regulatory Commission 2100 Renaissance Blvd., Suite 100 King of Prussia, PA 19406-1415 Mr. John G. Lamb, Project Manager Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Mail Stop: 0-881-A Washington, DC 20555-0001 NRC Senior Resident Inspector Pilgrim Nuclear Power Station J

Attachment To PNPS Letter 2.17.063 Engineering Report No. PNPS-RPT-17-00002, Rev. 0 "PNPS Owners Activity Report (OAR-1) for Cycle 21" (3 pages)

FIFTH INTERVAL PNPS-RPT-17-00002 FIRST PERIOD REFUEL OUTAGE 21 ATTACHMENT 9.1 ENGINEERING REPORT COVER SHEET & INSTRUCTIONS Engineering Report No. PNPS-RJ>T - l 7-00002 Re\' 0 Page I of _.3.___-4

~!

~Entergy ENTERGY NUCLEAR Engineering Report Co\*cr Sheet Engineering Report

Title:

PNPS OWNERS ACTIVITY REPORT (OAR-I} FOR CYCLE 21

/

Engineering Reeort Type:

New ~ Revision 0 Cancelled 0 Superseded 0 Superseded by:

AppliCPble Site(s)

JP! 0 IP2 D IP3 0 JAF D PNPS VY 0 WPO 0 ANOI D AN02 D ECH D GGNS 0 RBS WF3 D PLP 0 EC No. .!S{A Report Origin: [8] Entergy 0 Vendor Vendor Documenl No.:,_,,N""'/~A'--------

QuaJity-Relnted: l8J Yes D No Prepared by: -------~.;...'W..;.;.ill;;;.ia;;;.m;.;..C ....a;..;rr.;..;o;;;.11;...t_.~~~ix=-;"""""-..'-.~--=-=...;;=-Date:

Respon.o;ible Engineer (Print Name:Sign) 6~hu.D o.i,. .t i. ,~" 'f,L; . ;~=-

Reviewed by: _ _ _ _ _ _..,....;;K.;;;;'a;.;.;ti.;.e.; ; B.;.; ie. ;.;.nv.;. .e; ;.n; ;.ue;;. ;',. * ....-"".ha..<... Date:

Reviewer (Print NameiSign) page 1 of 3 EN-DC-147 Rev.6

FIFTH INTERVAL PNPS-RPT-17-00002 FIRST PERIOD REFUEL OUTAGE 21 FORM OAR-I OWNERS ACTIVITY REPORT Report Number PNPS-RPT-17*00002 Plant PILGRIM NUCLEAR POWER STATION. 600 Rocky Hill Road. Plymouth, MA 02360 (Name and Address of Plant)

Plant Unit_~- Commercial Service Date __J=u,,,_n=e-=8...._.,19=-7-=2=-------- Refueling Outage Number 21

  • Current Inspection lntervar (1st, 2nd, 3rd, 4th, Other)

Curren! Inspection Period (1st, 2nd, 3rd)

Edllion and Addenda of Section XI applicable to the Inspection Plan . 2007 Edition, 2008 Addenda - - - - -

Dale and Revision of Inspection Plan: ENES ISi Program Plan. No, SEP-ISl-PNPS*002 Rev.4 Edition and Addenda, of ASME Section XI applicable to Repairs and Replacements. if different than

!he lnspeclion Plan .2001 Edition. 2003 Addenda .

Code Cases used for inspection and evaluation: N-716 1\:,1-795 1r======"'-========================================================================n i!

j

/ CERTIFICATE OF CONFORMANCE l

j I certify that (a) the statements made in this report are correct; (b) the examinations and tests meet the Inspection Plan as l equlred by the ASME Code,Section XI; and (c) the repair/replacement activities and evaluations supporting the completion of I F020 conform to the requirements of Section XI.

ISigned,_ _,.!..!,!!:!!S!.J~~..L.2!w=!.!~1.!i!!....-.Ql~~~...:?-::.._-:.-==~,J"D:!!a~te _

.. __.rl,;.:.,tµx..hu-..:1..:..,- - - - -

1 CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and employed by TheJ:lartford.Steam Boiler Inspection and Insurance Company have inspected the components described in this Owners Activity Report, and state that, to

!the best of my knowledge and belief, the Owner has performed all the activities represented by this report in accordance with the requirements of Section XL

, By signing this certificate neither the Inspector nor his employer makes any warranty, expressed pr implied, concerning the repair/replacement activities and evaluation described !n this report.

Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or loss of any kind arising from or connected with this inspection.

Commissions Date de 14 * 'i2e1if J page 2 of 3 EN-DC-147 Rev.6

FIFTH INTERVAL PNPS-RPT-17-00002 _:.FIRST PERIOD REFUEL OUTAGE 21 TABLE 1 ITEMS WITH FLAWS OR RELEVANT CONDmONS THAT REQUIRED EVALUATION FOR CONTINUED SERVICE Examination Category and Item Number Item Description Evaluation Description NONE TABLE 2 ABSTRACT OF REPAIR/REPLACEMENT ACTIVITIES REQUIRED FOR CONTINUED SERVICE Code Item Description Date Repair/Replacement Class DescriDtion

  • Of Work Completed Plan Number 3 Replacement Overhaul SSW P-208A IAW 3.M.4-14.2 11/24/15 334804 3 Replacement 29-H0-3815 degraded bolting needs to be replaced 1/21/16 371143

(

3 Replacement Replace H29-1-1063 Suooort IAW EC64688 5/26/16 445791 3 Replacement Replace H29-1-1065 due to corrosion 6/17/16 445125 3 Replacement Replace Support H29-1-1062 IAW EC64713 6/17/16 445794 3 Replacement EC64673* Replace support H29-1-1064 - P-208E 6/17/16 445634 1 Replacement Install Standard non-uoaraded 2 stage pilot for RV-203-38 (leaking) 9/21/16 455538 3 Replacement Clean inspect and repair base plates on H-29-1-36 11/7/16 352595 1 Replacement **EC68754** seal weld bonnet A0-203-20 to correct leakage

  • 12/19/16 463518 3 Replacement Clean inspect and repair base plates on H-29-1-37 1/16/17 452151 2 Replacement Heat exchanger uooer head lower flange leak iniected studs 2/23/17 51533968 3 Replacement Replace H29-1-9SG - due to corrosion 3/28/16 427705 1 Replacement Contingency rebuild MSIV A0-203-1 C 4/1/17 51536403 3 Repair Repair H29-1-11 SG - due to corrosion 4/7/16 428288 1 Replacement {1 R} Perform tPRM Exchanges 4/15/17 52642270 1 Repair Perform internal valve repairs A0-203-10 4/17/17 472778 1 Replacement Replace 0-rings in CRD-38-35 to correct leakage 4/19/17 472816 1 Replacement Rebuild MSIV A0-203-2C replace stem 4/21/17 464820 2 Replacement Perform valve overhaul to correct valve leak by M0-1400-4A 4/~2/17 434935 3 Replacement Replace valve for M0-3801 4/22/17 310498 3 Replacement Replace 29-H0-3828 4/22/17 310497 1 Replacement Replace Head vent bolting - at bulkhead flange 5/7/17 52642239 MC Replacement Replace Torus Hatch Bolting PER EC72003 5/10/17 - 52653307 3 Repair Repair HPCI Turbine Exhaust 23-CK-2301-45 5/16/17 51551682 page 3 of 3 EN-DC-147 Rev.6