Category:Letter
MONTHYEARL-24-002, Late LLRW Shipment Investigation Report Pursuant to 10 CFR 20, Appendix G2024-02-0202 February 2024 Late LLRW Shipment Investigation Report Pursuant to 10 CFR 20, Appendix G ML23342A1182024-01-0909 January 2024 Independent Spent Fuel Storage Installation Security Inspection Plan L-23-019, Proof of Financial Protection 10 CFR 140.152023-12-18018 December 2023 Proof of Financial Protection 10 CFR 140.15 ML23334A1822023-11-30030 November 2023 Biennial Report for the Defueled Safety Analysis Report Update, Technical Specification Bases Changes, 10 CFR 50.59 Evaluation Summary, and Regulatory Commitment Change Summary November 2021 Through October 2023 L-23-012, Master Decommissioning Trust Agreement Changes for Indian Point Nuclear Generating Units 1, 2 and 3, Pilgrim Nuclear Power Station, Palisades Nuclear Plant and the Non-Qualified Trust for Big Rock Point2023-11-13013 November 2023 Master Decommissioning Trust Agreement Changes for Indian Point Nuclear Generating Units 1, 2 and 3, Pilgrim Nuclear Power Station, Palisades Nuclear Plant and the Non-Qualified Trust for Big Rock Point ML23306A0992023-11-0202 November 2023 and Indian Point Energy Center, Notification of Changes in Schedule in Accordance with 10 CFR 50.82(a)(7) L-23-011, 10 CFR 72.48 Biennial Change Summary Report2023-10-27027 October 2023 10 CFR 72.48 Biennial Change Summary Report IR 05000293/20234012023-08-31031 August 2023 NRC Inspection Report No. 05000293/2023401 & 2023001 (Cover Letter Only) IR 05000293/20230022023-08-0404 August 2023 NRC Inspection Report No. 05000293/2023002 L-23-008, Correction to Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations Holtec Decommissioning International, LLC (HDI)2023-05-23023 May 2023 Correction to Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations Holtec Decommissioning International, LLC (HDI) ML23136A7792023-05-15015 May 2023 Annual Radiological Environmental Operating Report, January 1 Through December 31, 2022 ML23135A2152023-05-15015 May 2023 Annual Radioactive Effluent Release Report, January 1 Through December 31, 2022 L-23-004, HDI Annual Occupational Radiation Exposure Data Reports - 20222023-04-24024 April 2023 HDI Annual Occupational Radiation Exposure Data Reports - 2022 L-23-003, Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations2023-03-31031 March 2023 Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations ML23088A0382023-03-29029 March 2023 Stations 1, 2, & 3, Palisades Nuclear Plant, and Big Rock Point - Nuclear Onsite Property Damage Insurance ML23069A2782023-03-13013 March 2023 Request for Scoping Comments Concerning the Environmental Review of Monticello Nuclear Generating Plant, Unit 1 Subsequent License Renewal Application ML22361A1022023-02-24024 February 2023 Reactor Decommissioning Branch Project Management Changes for Some Decommissioning Facilities and Establishment of Backup Project Manager for All Decommissioning Facilities IR 05000293/20220042023-02-15015 February 2023 NRC Inspection Report No. 05000293/2022004 ML22356A0712023-01-31031 January 2023 Issuance of Exemption for Pilgrim Nuclear Power Station ISFSI Regarding Annual Radioactive Effluent Release Report - Cover Letter ML22347A2782022-12-21021 December 2022 Independent Spent Fuel Storage Installation Security Inspection Plan Dated December 21, 2022 L-22-042, Oyster, Pilgrim, Indian Point, Palisades and Big Rock Point - Proof of Financial Protection 10 CFR 140.152022-12-14014 December 2022 Oyster, Pilgrim, Indian Point, Palisades and Big Rock Point - Proof of Financial Protection 10 CFR 140.15 L-22-041, Supplemental Information to Enhance Exemption Request Detail for Pilgrim ISFSI Annual Radioactive Effluent Release Report Due Date Extension2022-12-0909 December 2022 Supplemental Information to Enhance Exemption Request Detail for Pilgrim ISFSI Annual Radioactive Effluent Release Report Due Date Extension IR 05000293/20220032022-11-18018 November 2022 NRC Inspection Report No. 05000293/2022003 L-22-036, Decommissioning Trust Fund Agreement2022-11-0808 November 2022 Decommissioning Trust Fund Agreement ML22276A1762022-10-24024 October 2022 Decommissioning International Proposed Revisions to the Quality Assurance Program Approval Forms for Radioactive Material Packages ML22266A1922022-09-23023 September 2022 and Pilgrim Nuclear Power Station - Request to Withdraw Prior Submissions from NRC Consideration ML22272A0352022-09-22022 September 2022 S. Lynch-Benttinen Letter Regarding U.S. Citizen Intent to Sue U.S. Fish and Wildlife and NOAA Fisheries Representing the Endangered Species (Na Right Whale) Which Will Be Adversely Affected by Holtec International Potential Actions ML22269A4202022-09-22022 September 2022 Citizen Lawsuit ML22241A1122022-08-29029 August 2022 Request for Exemption from 10 CFR 72.212(a)(2), (b)(2), (b)(3), (b)(4), (B)(5)(i), (b)(11), and 72.214 for Pilgrim ISFSI Annual Radioactive Effluent Release Report IR 05000293/20220022022-08-12012 August 2022 NRC Inspection Report No. 05000293/2022002 ML22215A1772022-08-0303 August 2022 Decommissioning International (HDI) Proposed Revisions to the Quality Assurance Program Approval Forms for Radioactive Material Packages ML22206A1512022-08-0101 August 2022 NRC Office of Investigations Case Nos. 1-2022-002 & 1-2022-006 ML22221A2592022-08-0101 August 2022 LTR-22-0217-1-NMSS - Town of Duxbury Letter Opposing the Irradiated Water Release from Pilgrim (Docket No. 05000293) ML22193A1662022-07-28028 July 2022 LTR-22-0154-1 - Heather Govern, VP, Clean Air and Water Program, Et Al., Letter Regarding Radioactive Wastewater Disposal from the Pilgrim Nuclear Power Station (Docket No. 05000293) ML22175A1732022-07-28028 July 2022 LTR-22-0153-1 - Response Letter to D. Turco, Cape Downwinders, from A. Roberts, NRC, Regarding Holtec-Pilgrim Plans to Dump One Million Gallons of Radioactive Waste Into Cape Cod Bay ML22154A4882022-06-0101 June 2022 Letter from Conservation Law Foundation Regarding Irradiated Water Release from Pilgrim ML22154A1622022-05-26026 May 2022 Letter and Email from Save Our Bay/Diane Turco Regarding Irradiated Water Release from Pilgrim ML22136A2602022-05-16016 May 2022 Submittal of Annual Radiological Environmental Operating Report for January 1 Through December 31, 2021 ML22136A2572022-05-16016 May 2022 Submittal of Annual Radioactive Effluent Release Report for January 1 Through December 31, 2021 ML22102A0932022-05-12012 May 2022 LTR-22-0067 Response to Matthew P. Levesque, President, Barnstable Town Council Regarding Irradiated Water Release from Pilgrim IR 05000293/20220012022-05-11011 May 2022 NRC Inspection Report No. 05000293/2022001 ML22104A0542022-04-30030 April 2022 LTR-22-0093 Response to Sheila Lynch-Benttinen, Regarding Irradiated Water Release from Pilgrim L-22-026, Occupational Radiation Exposure Data Report - 20212022-04-29029 April 2022 Occupational Radiation Exposure Data Report - 2021 ML22152A2592022-04-25025 April 2022 Zaccagnini Letter Dated 04/25/22 ML22152A2642022-04-19019 April 2022 Flynn Letter Dated 04/19/22 ML22091A1062022-04-0101 April 2022 Nuclear Onsite Property Damage Insurance (10 CFR 50.54(w)(3)) L-22-022, and Indian Point Nuclear Generating Stations 1, 2, & 3 - Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations - Holtec.2022-03-25025 March 2022 and Indian Point Nuclear Generating Stations 1, 2, & 3 - Report on Status of Decommissioning Funding for Reactors and Independent Spent Fuel Storage Installations - Holtec. ML22130A6762022-03-14014 March 2022 Decola Ltr Dtd 03/14/22 Re Potential Discharge of Radioactive Water from Pilgrim Nuclear Power Station ML22041B0762022-03-0707 March 2022 03-07-22 - Letter to the Honorable William R. Keating, Responds to Letter Regarding Proposed Release of Irradiated Water at Pilgrim Nuclear Power Station Into Cape Cod Bay ML22054A2962022-02-23023 February 2022 Annual ISFSI Radioactive Effluent Release Report for 2021 2024-02-02
[Table view] Category:Routine Status Report (Recurring Weekly/Monthly)
MONTHYEARML17249A1222017-08-22022 August 2017 (PNPS) Owners Activity Report (OAR-1) for Cycle 21 2017-08-22
[Table view] |
Text
- ~Entergx Entergy Nuclear Operations, Inc.
Pilgrim Nuclear Power Station 600 Rocky Hill Road Plymouth, MA 02360 August22,2017 U.S. Nuclear Regulatory Commission Att11: Document Control Desk Washington, DC 20555-0001
SUBJECT:
Pilgrim Nuclear Power Station (PNPS) Owners Activity Report (OAR-1) for Cycle 21 Entergy Nuclear Operations, Inc.
Pilgrim Nuclear Power Station Docket No. 50-293 Renewed License No. DPR-35 LETTER NUMBER: 2.17.063
Dear Sir or Madam:
By this letter Entergy submits to the Nuclear Regulatory Commission (NRC) the attached Pilgrim Nuclear Power Station (PNPS) Owners Activity Report (OAR-1) for Cycle 21.
This report has been prepared in accordance with the American Society of Mechanical Engineers (ASME) Boiler and Pressure Vessel Code,Section XI 2007 with 2008 addenda and NRC approved Code Case N-532-5. The report has been certified by the Authorized Nuclear lnservice Inspector (ANll) attesting that all code-required examinations and repair/re'placement activities at PNPS during Cycle 21 were performed in accordance with the requirements of the ASME Section XI.
If you have any questions regarding the information contained in this letter, please contact me at (508) 830-8323.
There are no regulatory commitments contained in this letter.
Sincerely,
~~lL:.~
Evere~t P. (Chip) Perkins, Jr:
Regulatory Assurance Manager EPP/sc
Attachment:
Engineering 'Report No. PNPS-RPT-17-00002, Rev. 0 "PNPS Owners Activity Report (OAR-1) for Cycle 21" (3 pages)
Letter Number: 2.17.063 Page 2 of 2 cc: Mr. Daniel H. Dorman Regional Administrator, Region I U.S. Nuclear Regulatory Commission 2100 Renaissance Blvd., Suite 100 King of Prussia, PA 19406-1415 Mr. John G. Lamb, Project Manager Division of Operating Reactor Licensing Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Mail Stop: 0-881-A Washington, DC 20555-0001 NRC Senior Resident Inspector Pilgrim Nuclear Power Station J
Attachment To PNPS Letter 2.17.063 Engineering Report No. PNPS-RPT-17-00002, Rev. 0 "PNPS Owners Activity Report (OAR-1) for Cycle 21" (3 pages)
FIFTH INTERVAL PNPS-RPT-17-00002 FIRST PERIOD REFUEL OUTAGE 21 ATTACHMENT 9.1 ENGINEERING REPORT COVER SHEET & INSTRUCTIONS Engineering Report No. PNPS-RJ>T - l 7-00002 Re\' 0 Page I of _.3.___-4
~!
~Entergy ENTERGY NUCLEAR Engineering Report Co\*cr Sheet Engineering Report
Title:
PNPS OWNERS ACTIVITY REPORT (OAR-I} FOR CYCLE 21
/
Engineering Reeort Type:
New ~ Revision 0 Cancelled 0 Superseded 0 Superseded by:
AppliCPble Site(s)
JP! 0 IP2 D IP3 0 JAF D PNPS VY 0 WPO 0 ANOI D AN02 D ECH D GGNS 0 RBS WF3 D PLP 0 EC No. .!S{A Report Origin: [8] Entergy 0 Vendor Vendor Documenl No.:,_,,N""'/~A'--------
QuaJity-Relnted: l8J Yes D No Prepared by: -------~.;...'W..;.;.ill;;;.ia;;;.m;.;..C ....a;..;rr.;..;o;;;.11;...t_.~~~ix=-;"""""-..'-.~--=-=...;;=-Date:
Respon.o;ible Engineer (Print Name:Sign) 6~hu.D o.i,. .t i. ,~" 'f,L; . ;~=-
Reviewed by: _ _ _ _ _ _..,....;;K.;;;;'a;.;.;ti.;.e.; ; B.;.; ie. ;.;.nv.;. .e; ;.n; ;.ue;;. ;',. * ....-"".ha..<... Date:
Reviewer (Print NameiSign) page 1 of 3 EN-DC-147 Rev.6
FIFTH INTERVAL PNPS-RPT-17-00002 FIRST PERIOD REFUEL OUTAGE 21 FORM OAR-I OWNERS ACTIVITY REPORT Report Number PNPS-RPT-17*00002 Plant PILGRIM NUCLEAR POWER STATION. 600 Rocky Hill Road. Plymouth, MA 02360 (Name and Address of Plant)
Plant Unit_~- Commercial Service Date __J=u,,,_n=e-=8...._.,19=-7-=2=-------- Refueling Outage Number 21
- Current Inspection lntervar (1st, 2nd, 3rd, 4th, Other)
Curren! Inspection Period (1st, 2nd, 3rd)
Edllion and Addenda of Section XI applicable to the Inspection Plan . 2007 Edition, 2008 Addenda - - - - -
Dale and Revision of Inspection Plan: ENES ISi Program Plan. No, SEP-ISl-PNPS*002 Rev.4 Edition and Addenda, of ASME Section XI applicable to Repairs and Replacements. if different than
!he lnspeclion Plan .2001 Edition. 2003 Addenda .
Code Cases used for inspection and evaluation: N-716 1\:,1-795 1r======"'-========================================================================n i!
j
/ CERTIFICATE OF CONFORMANCE l
j I certify that (a) the statements made in this report are correct; (b) the examinations and tests meet the Inspection Plan as l equlred by the ASME Code,Section XI; and (c) the repair/replacement activities and evaluations supporting the completion of I F020 conform to the requirements of Section XI.
ISigned,_ _,.!..!,!!:!!S!.J~~..L.2!w=!.!~1.!i!!....-.Ql~~~...:?-::.._-:.-==~,J"D:!!a~te _
.. __.rl,;.:.,tµx..hu-..:1..:..,- - - - -
1 CERTIFICATE OF INSERVICE INSPECTION I, the undersigned, holding a valid commission issued by the National Board of Boiler and Pressure Vessel Inspectors and employed by TheJ:lartford.Steam Boiler Inspection and Insurance Company have inspected the components described in this Owners Activity Report, and state that, to
!the best of my knowledge and belief, the Owner has performed all the activities represented by this report in accordance with the requirements of Section XL
, By signing this certificate neither the Inspector nor his employer makes any warranty, expressed pr implied, concerning the repair/replacement activities and evaluation described !n this report.
Furthermore, neither the Inspector nor his employer shall be liable in any manner for any personal injury or property damage or loss of any kind arising from or connected with this inspection.
Commissions Date de 14 * 'i2e1if J page 2 of 3 EN-DC-147 Rev.6
FIFTH INTERVAL PNPS-RPT-17-00002 _:.FIRST PERIOD REFUEL OUTAGE 21 TABLE 1 ITEMS WITH FLAWS OR RELEVANT CONDmONS THAT REQUIRED EVALUATION FOR CONTINUED SERVICE Examination Category and Item Number Item Description Evaluation Description NONE TABLE 2 ABSTRACT OF REPAIR/REPLACEMENT ACTIVITIES REQUIRED FOR CONTINUED SERVICE Code Item Description Date Repair/Replacement Class DescriDtion
- Of Work Completed Plan Number 3 Replacement Overhaul SSW P-208A IAW 3.M.4-14.2 11/24/15 334804 3 Replacement 29-H0-3815 degraded bolting needs to be replaced 1/21/16 371143
(
3 Replacement Replace H29-1-1063 Suooort IAW EC64688 5/26/16 445791 3 Replacement Replace H29-1-1065 due to corrosion 6/17/16 445125 3 Replacement Replace Support H29-1-1062 IAW EC64713 6/17/16 445794 3 Replacement EC64673* Replace support H29-1-1064 - P-208E 6/17/16 445634 1 Replacement Install Standard non-uoaraded 2 stage pilot for RV-203-38 (leaking) 9/21/16 455538 3 Replacement Clean inspect and repair base plates on H-29-1-36 11/7/16 352595 1 Replacement **EC68754** seal weld bonnet A0-203-20 to correct leakage
- 12/19/16 463518 3 Replacement Clean inspect and repair base plates on H-29-1-37 1/16/17 452151 2 Replacement Heat exchanger uooer head lower flange leak iniected studs 2/23/17 51533968 3 Replacement Replace H29-1-9SG - due to corrosion 3/28/16 427705 1 Replacement Contingency rebuild MSIV A0-203-1 C 4/1/17 51536403 3 Repair Repair H29-1-11 SG - due to corrosion 4/7/16 428288 1 Replacement {1 R} Perform tPRM Exchanges 4/15/17 52642270 1 Repair Perform internal valve repairs A0-203-10 4/17/17 472778 1 Replacement Replace 0-rings in CRD-38-35 to correct leakage 4/19/17 472816 1 Replacement Rebuild MSIV A0-203-2C replace stem 4/21/17 464820 2 Replacement Perform valve overhaul to correct valve leak by M0-1400-4A 4/~2/17 434935 3 Replacement Replace valve for M0-3801 4/22/17 310498 3 Replacement Replace 29-H0-3828 4/22/17 310497 1 Replacement Replace Head vent bolting - at bulkhead flange 5/7/17 52642239 MC Replacement Replace Torus Hatch Bolting PER EC72003 5/10/17 - 52653307 3 Repair Repair HPCI Turbine Exhaust 23-CK-2301-45 5/16/17 51551682 page 3 of 3 EN-DC-147 Rev.6