ML17244A418

From kanterella
Jump to navigation Jump to search
Furnishes Schedule for Submitting Addl Info in Response to NRC 790214 Ltr Transmitting Modified Tech Specs & Fire Protection SER
ML17244A418
Person / Time
Site: Ginna Constellation icon.png
Issue date: 03/19/1979
From: White L
ROCHESTER GAS & ELECTRIC CORP.
To: Ziemann D
Office of Nuclear Reactor Regulation
References
NUDOCS 7903270462
Download: ML17244A418 (6)


Text

"REGULA ORY INFORMATION DISTRI4UTI~M,SYSTEM (RIDS)

ACCESSION NBR ~ 7903270462 DOC ~ OATEN'9/03/19 N ARIZED! NO DOCKET FAC Ik s 50~244 ROBERT EMMET G INNA NUClEAR PLANT g UNIT 1'g ROCHESTER G 05000244 AUTH INANE AUTHOR AFFILIATION NHITKE L ~ D ~ ROCHESTER GAS & KLECTRIC IP', NAME CORP'KC RECIPIENT AFFII IATION ZIEMANNg D ~ OPERATING. REACTORS BRANCH 2 SUBJECTS FURNISHES SCHEDULE> FOR SUBMITTING ADDL INFO IN RESPONSE TO NRC 790214 LTR TRANSMITTING MOD TECH SPECS & FIRE PROTECTION SAFETY EVALUATION REPT'e OISTRISUTION COOE5 AOOSS COPIES RECEIVES:LTR g ENCL SIZEi 2 TITlE! F IRK PROTECTION INFORMATION (AFTER ISSUANCE OF OP;LIC,)

NOTES' .: + Il<S ~CW~8f'E II 'k A R $ ~ ~ ~ ~

f 11, I ~, ~ % I ~ t0 I I IPIENT COPIES REC IP COP.1ES ACTION) 05 BC COOK/NAME

&/28~

LTTR EN 4

l ID CODE/NAME IKNT'D LTTR ENCL!

INTERNAL: 0 REG F ILE 1 02 NRC PDR 1 0 2 11 TA/KDO '1 12 AUX Il 19 NAMBACH SYS BR 2.

,1 14 PLANT SYS BR 20 MURANAKAgR 5

1 21 AD SYS/PROJ 1 OELD EXTKRNALe 03 LPDR 1 04 NSIC 22 ACRS 16 MAR Bo tS7Q TOTAL NUMBER OF COPIES REQUIRED'TTR 38 ENCL

, 0 'L

~ e ~

0 I

V

)(

4'l I'

R 1

///////////////// ///////////////

E ROCHESTER GAS AND ELECTRIC CORPORATION o 89 EAST AVENUE, ROCHESTER, N.Y. 14649 LEON D. WHITE. JR. TEI.E PHONE VICE PRESIDENT AREA CODE TI6 546-2700 March 19, 1979 Director of Nuclear Reactor Regulation Attention: Mr. D. Ziemann, Chief Operating Reactors Branch g2 Division of Operating Reactors U.S. Nuclear Regulatory Commission Washington, DC 20555 Re: Fire Protection at R.E. Ginna Nuclear Power Plant Docket No. 50-244

Dear Mr. Ziemann:

In response to your letter of February 14, 1979 transmitting modified Technical Specifications, the Fire Protection Safety Evaluation Report, and a request to furnish a schedule for sub-mitting certain additional information, we submit the following schedule:

Submit tal Item Date 3.1.2 Water Suppression Systems and Equipment 9/79 3.1.11 Battery Room Ventilation 5/79 3.1.21 Control Room Separation 9/79 3.1.24 Piping and Duct Penetrations 4/79 3.1.25 Construction Joints 4/79 3.1.39 RCP Lube Oil Collection System 12/79 3.1.43 Detector Testing 4/79 3.1.46 Auxiliary Boiler 12/79 3.1.48 Hydrogen Piping 9/79 Please note that. item 3.1.46, Auxiliary Boiler, is essentially an investigation and report. The information submittal date is based on notifying you concerning any proposed modifications they are found to be necessary.

if With the exception of item 3.1.21, Control Room Separation, submittal data will be input, type items only (e.g. design criteria).

Final design, construction specifications and drawings, or similar data will not be submitted. Item 3.1.21 documents will be the design documents.,

s I

tl t

I(

ROCHESTER GAS AND ELEC CORP. SHEET NO.

DATE March 19, 1979 To Mr. D. Ziemann, Chief The time schedule allows for a 30 day response time period by the NRC staff. Any delay in this response will directly affect the scheduled completion date of these projects by an equivalent time per10d.

Very truly yours, L. D. Whi , Jr.