| Person / Time | |
|---|---|
| Site: | Ginna |
| Issue date: | 12/15/1978 |
| From: | Galen Smith NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | White L ROCHESTER GAS & ELECTRIC CORP. |
| Shared Package | |
| ML17244A319 | List: |
| References | |
| NUDOCS 7901190222 | |
| Download: ML17244A318 (4) | |
See also: IR 05000244/1978025
Text
~S REOy~
4
~o
'P~
ClO
(
4 Cr
Cy
~O
+**++
Docket No. 50-244
I
UNITED STATES
NUCLEAR REGULATORY COMMISSION
REGION I
631 PARK AVENUE
KING OF PRUSSIAe PENNSYLVANIA I'9406
DEC i 5
197S
C
Rochester
Gas
and. Electric Corporation
ATTN:
Mr. Leon
D. White, Jr.
Vice President
Electric and Steam Production
89 East Avenue
Rochester,
14649
Gentlemen:
Subiect:
Inspection
78-25
This refers to the inspection
conducted
by Mr.
G. P.
Yuhas
and Mr. J.
R.
White of this office on November
29 through
December,
1,
1978 of activities
authorized
by NRC License
No.
DPR-18 and to the discussions
of our
findings held by Hr. Yuhas with yourself and other members. of your staff
at the conclusion of the inspection.
Areas. examined during this inspection
are described in the Office of
Inspection
and Enforcement Inspection
Report which is enclosed with this
letter.
Within these areas,
the inspection consisted of selective
examinations of procedures
and representative
records,
interviews with
personnel,
measurements
made
by. the inspector,
and observations
by the
inspector.
Our inspector also verified the steps
you have taken to correct several
items of noncompliance
brought to your attention in a .letter
dated
May
1, 1978.
We have
no further questions
regarding your action with respect
to these
items at this time.
Within the scope of this inspection,
no items of noncompliance
were
observed.
i
7 S01 190~~
Rochester
Gas
and Electric Corporation
In accordance
with Section 2.790 of the
NRC's "Rules of Practice," Part
2,,Title 10,, Code of Federal
Regulations,
a copy of, this letter and the
enclosed
inspection report will be placed in the NRC's Public Document
Room. If this report contains
any information that you (or your con-
tractor) believe to be, propnietary, it is necessary
that you make
a
written application within 20 days.to this office to withhold such
information from public disclosure.
Any such application must be accom-
panied
by. an affidavit executed
by the owner of the information, which
identifies the document or part sought to be withheld, and which con-
tains
a statement of reasons
which addresses
with specificity the items
which will be considered
by the Commission
as listed, in subparagraph
(b)
(4} of Section 2.790.
The .information sought to be, withheld shall
be
incorporated
as: fai
as possible
into. a separate
part of the affidavit.
If we do not hear from you in this. regard within the specified period,
the report wi,ll be placed in the Public Document
Room.
No reply to this letter- is required;
however,
should you have
any
questions
concerning this inspection,
we will be pleased
to discuss
them
with you.
Sincerely,
Fuel Facility and Materials
S fety
Branch
Enclosure:
Office of Inspection
and Enforcement Inspection
Report Number 50-244/78-25
cc w/encl:
B. A. Snow, Plant Superintendent
S. Bullock, gC Engineer
Lex K. Larson,