~ OPERATING STATUS OPERATING DATA REPORT DOCKET NO.

50 244 DATE October 5, 1978 COMPLETED BY Andrew E. McNamara, Operations ide TELEPHONE 1-716-546-2700 xt.

,at Ginna

l. Unit Name'.

GINNA STATION U

2. Reporting Periodt Se tember 1978
3. Licensed Thermal Power (MWt):
4. Nameplate Rating (Gross hfWe):
5. Design Electrical Rating (Net hIWe):
7. hfaximum Dependable Capacity (Net MWe):

Notes The Reactor Power Level averaged 100% in the Reporting Period.

The exceptions are detailed on Page 4 in the Summary of Operating Experience.

8. IfChanges Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report, Give Reasons:

i

9. Power Level to Which Restricted, If Any (Net hIWe):
10. Reasons For Restrictions, IfAny:

This hlonth Yr:to-Date Cumulative 720 6,551 4 976.18 4

42 4 883 7 227 264 2,228,114 2 173 855 75%

75%

71%

71%

5%

11. Hours In Reporting Period
12. Number of Hours Reactor Was Critical
13. Reactor Reserve Shutdown Hours
14. Hours Generator On-Line
15. Unit Reserve Shutdown Hours
16. Gross Thermal Energy Generated (MWH)
17. Gross Electrical Energy Generated (hfWH)
18. Net Electrical Energy Generated (hfWH) 342 437 100/
19. Unit Service Factor ln0e
20. Unit AvailabilityFactor Ol

'2.

Unit Capacity Factor (Using.DRR Net) 101/

23. Untt Forced Outage Rate
24. Shutdowns Scheduled Over Next 6 Months (Type, Date and Duration of Each):

Type:

Refueling Date:.2/10/79 - Duration:,44 da s

77,543 59 014.80 57 401.38 75 664 306 24,475,974 23,156,149 74%

74%

66%

66%

11%

25. IfShut Down At End Of Report. Period, Estimated Date of Startup:
26. Units In Test Status (Prior to Commercial Operation):

Forecast Achieved INITIALCRITICALITY INITIALELECTRICITY 7 I'(Jig Q2.(l COhh ERChIIAL OPERATI RO

  • Cumulative Total Commencing January 1, 1975
    • Incorrectly reported in August '78 Operating Data Report as 68%.

The correct figure should have been 66%.

AO EE (Rave 1/TE)

fl

ej AVERAGE DAILYUNIT POWER UNIT hIONTH Se tember, 1978 DAY AVERAGE DAILYPOWER LEVEL (MWe-Net)

DOCKET NO.

UNIT tII @irma Stati DATE COMPLETED BY Andrew E. McNamara, Operations Aide TELEPHONE 1-716-546-2700 Ext. 291-205, at Ginna DAY AVERAGE DAILYPOWER LEVEL (MWe-Net) 6

.'t 10 ll 12 13 14 15 16 478 478 479 476 476 475 476 476 478 477 481 383 481 11 18 20 21 22 23 24 25 26 27 28 2S 30 31 482 480 482 483 484 481 48 480 480 479 481 479 479 48 INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting month..

Compute to the nearest whole megawatt.

49.d7

{REVo 1/78)

DOCKET NO.

SO 244 UNIg NAMI. Ill Ginna Station UNIT SHUTDOWN AND POWER REDUCTIONS COMPLETED BY C~~

Andrew E. McNamara, Operations Aide REPORT hlONTH

'l:.LEPIIONE 1-716-546-2700 Ext. 291-205, at Ginna No.

Date c0 vs 0

e 0

or n ~

reI c0 00 OI >>0 0 c M

o>>> CE O Ien C

0n Licensee Event Report 0

Ew ~

0 Vl 0 lA (J cO ICI c

4 00 U

Cause gI Corrective Action to Prevent Recurrence No outages or significant power reductions to report.

F:

Forced S:

Scheduled 40.80 (Rave I/7S)

Reason:

A-Equipmcnt Failure (Explain)

B-hlaintcnancc or Test C-Refueling D-Regulatory Restriction E-Operator Training 8t License Examination F-Administrative G-Operational Error (Explain) ll-Other (Explain) hlcthod:

I-hlanual 2-hlanual Scram.

3-Automatic Scram.

4-Other (Explain)

Fxhibit G - Instructions for Preparation of Data Entry Sheets for Licensee Event Report (LER) File (NUREG-0161)

Exhibit 1 - Same Source

I

~

i~

~ C!'

NARRATIVE

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO.

0-2 UNIT Ginna Station Unit f!1 DATE October 5

1978 COMPLETED BY Andrew E. McNamara, Operations Aide TELEPHONE 1-716-546-2700 Ext. 291-205 at Ginna MONTH e

e The Reactor Power Level averaged 100% in the Report Period, with the following load reductions of short duration:

On 9/15, a load reduction to ~48% Reactor Power Level to repair a Condenser Tube Leak.

On 9/22, a load reduction 'to ~ 98% Reactor Power Level to perform a periodic test on the Auxiliary Feedwater System.

On 9/26, a load reduction to I 95% Reactor Power Level to perform a periodic surveillance test on air operated valves.

49 l23 u/78)

~

~

~

GINNA STATION MAINTENANCE REPORT FOR SEPTEMBER 1978 During September, normal inspection and minor maintenance was performed.

Major safety related maintenance included:

1.

Sampling material from the containment recirculation fan splices.

2.

Replacement of all four containment recirculation fan power splices inside containment with splices made with LOCA approved Raychem brand heat shrink tubing.

3.

Replacement of splices inside containment for Valve 852A and B with splices made with LOCA approved Raychem brand heat shrink tubing.