ML17229A590

From kanterella
Jump to navigation Jump to search

Forwards Procedures ADM-17.11,Rev 0 & QI-5-PSL-1,Rev 4 on Plant Dockets to Be Placed in PDR
ML17229A590
Person / Time
Site: Saint Lucie  NextEra Energy icon.png
Issue date: 01/02/1998
From: Wiens L
NRC (Affiliation Not Assigned)
To:
NRC (Affiliation Not Assigned)
Shared Package
ML17229A591 List:
References
TAC-M97209, TAC-M97210, NUDOCS 9801230051
Download: ML17229A590 (3)


Text

January 2, 1998 MEMORANDUMTO:

FILE FROM:

Len Wiens, Project Manager Project Directorate II-3 Division of Reactor Projects I/II

SUBJECT:

DOCKETING OF PROCEDURES REVIEWED DURING LICENSE AMENDMENTPROCESSING

- ST. LUCIE UNITS 1 AND 2 (TAC NOS. M97209 AND M97210)

The purpose of this memorandum is to place the attached procedures on the plant dockets for St. Lucie Units 1 and 2 and in the Public Document Room. These procedures were reviewed during the evaluation of a license amendment requested by Florida Power and Light Company in a submittal dated October 31, 1996.

Docket Nos. 50-335 and 50-389 Attachments:

1. Procedure ADM 17.11, Revision 0
2. Procedure QI-5-PSL-1, Revision 4 DISTRIBUTION:

Docket File PUBLIC St. Lucie Reading File w/o enclosures L. Wiens w/o enclosures B. Clayton w/o enclosures F. Hebdon w/o enclosures 00CUMENT NAME:

G: 'lSTLUCIEiDCCHEHO To receive a copy of this docwent, indicate in the box:

<<C<< = Copy without attachment/enclosure attachment/enclosure

<<H<< = Ho co

<<E<<

= Copy with OFFICE PDII-3/PH PDII-3/LA HAHE LWiens:mw BCIa ton DATE

/I ~94 12/ '97 OFFICIAL RECORD COPY 12/

/97 04 980i23005i 980i02 PDR ADQCK 05000335 P

PDR Il@RLKCP)~ ~V

~II,QE0y "o

Cy O

Ich O~

~0

++*++

UNITED STATES NUCLEAR REGULATORY COMMISSION WASHINGTON, D.C. 2055&0001 Januazy 2, 1998 MEMORANDUMTO:

FILE Len Wiens, Project Manager Project Directorate II-3 Division of Reactor Projects I/II

SUBJECT:

DOCKETING OF PROCEDURES REVIEWED DURING LICENSE AMENDMENTPROCESSING

- ST. LUCIE UNITS 1 AND 2 (TAC NOS. M97209 AND M97210)

The purpose of this memorandum is to place the attached procedures on the plant dockets for St. Lucie Units 1 and 2 and in the Public Document Room. These procedures were reviewed during the evaluation of a license amendment requested by Florida Power and Light Company in a submittal dated October 31, 1996.

Docket Nos. 50-335 and 50-389 Attachments:

1. Procedure ADM 17.11, Revision 0
2. Procedure QI-5-PSL-1, Revision 4

I' I

j I