,t" ~
'CATEGORY 1 ~
REGULAT Y INFORMATION DISTRIBUTION SYSTEM (RIDS)
ACCESSION NBR:9801200'042 DOC.DATE: 98/01/12 NOTARIZED: NO DOCKET FACIL:50-335 St. Lucie Plant, Unit 1, Florida Power
& Light Co.
05000335 50-389 St. Lucie Plant, Unit 2, Florida Power 5: Light Co.
05000389 AUTH.NAME AUTHOR AFFILIATION STALL,J.A.
Florida Power 8 Light Co.
RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)
SUBJECT:
Forwards Rev 0 to ADM-29.01, "IST Program for Pumps E Valves for St Lucie,Units 1
R 2.Attachment 1 summary of relief
- related, IST programs.
H A DISTRIBUTION CODE:
A047D COPIES RECEIVED:LTR j
ENCL l
SIZE: f 2ZQ TITLE: OR Submittal: Inservice/Testing/Relief from ASME Code - GL-89-04 NOTES:
E RECIPIENT ID CODE/NAME PD2-3 LA WIENS,L.
COPIES RECIPIENT LTTR ENCL'D CODE/NAME 1
1 PD2-3 PD 1
1 COPIES LTTR ENCL 1
1 0
INTERNAL FILE C RES/DET/EIB 1
1 1
1 1
1 1
1 AEOD/SPD/RAB NRR/DE/EMEB OGC/HDS3 RES/DET/EMMEB 1
1 1
1 1
0 1
1 EXTERNAL: LITCO ANDERSON NRC PDR 1
1 1
1 NOAC 1
1 D
U M
E NOTE TO ALL <<RZDS<<
RECIPZENTS PLEASE HELP US TO REDUCE WASTE. TO HAVE YOUR NAME OR ORGANIZATION REMOVED FROM DISTRIBUTION LISTS OR REDUCE THE NUMBER OF COPIES RECEIVED BY YOU OR YOUR ORGANIZATION, CONTACT THE DOCUMENT CONTROL DESK (DCD)
ON EXTENSION 415-2083 TOTAL NUMBER OF COPIES REQUIRED:
LTTR 14 ENCL 13
I I
I
Florida Power 5 Light Company,6351 S. Ocean Orive, Jensen Beach, FL34957 January 12, 1998 L-98-5 10 CFR 50.4 10 CFR 50.55a U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C. 20555 RE:
St. Lucie Units 1 and 2 Docket Nos. 50-335 and 50-389 Third Ten-Year Interval In-Service-Test Pro ram - Revision 0 The third ten-year in-service-test (IST) interval for St. Lucie Unit 1 begins on February 12, 1998, and ends on February 11, 2008.
Pursuant to 10 CFR 50.55a(f)(4)(ii) and 10 CFR 50.55a(b)(2)(viii), the enclosed program outlines the IST plans for St. Lucie'Units 1 and 2 based on the requirements of Section XIof the ASME Boiler and Pressure Vessel Code (ASME Code),
1989 Edition and the applicable requirements set forth in ASME/ANSI OM-1987, Operation and Maintenance of Nuclear Power Plants, including ASME/ANSI OMa-1988 Addenda.
This submittal combines the Unit 1 and Unit 2 IST Programs into a single program and plant administrative procedure updating both programs to the later, Code requirements.
Pursuant'to 10 CFR 50.55a(f)(4)(iv), the St..Lucie Unit 2 IST Program for.the second ten-year IST interval is being voluntarily upgraded from the r'equirements of the ASME Code,Section XI, 1986 Edition to the ASME Code,Section XI, 1989 Edition and the applicable requirements set forth in ASME/ANSI OM-1987, Operation and Maintenance of Nuclear Power Plants, including ASME/ANSI OMa-1988 Addenda by this revision.
Incorporated in this submittal, for your review and approval, are relief requests associated with the Unit 1 third ten-year IST interval and'the relief requests associated with the upgrade of the Unit 2 IST Program.
Attachment 1 is a summary of the relief requests related the IST Programs. is the implementation plan for the combined IST Program.
For St. Lucie Unit 1, the first refueling outage for the new IST interval and new outage-related program requirements or testing willbe the Fall 1999 refueling outage (SL1-16). For St. Lucie Unit 2 the first refueling outage for the new outage-related program requirements or testing is planned to be the Fall 1998
,=', refueling outage (SL2-11).
FPL is submitting Revision 0 of the St. Lucie Units 1 and 2 IST Program Plan for Pumps and Valves, ADM-29.01, for your information as required by IWA-1400(c). This revision, when implemented, will replace individual unit specific IST program procedures, AP 1-0010024 and
'P80i200042 980ii2 PDR ADQCK 05000335 P
~g'l IIIIIIIIIIIIIIIIIIIII IIIIIIIIIIIIIIIII
St. Lucie Units 1 and 2 Docket Nos. 50-335 and 50-389 L-98-5 Page 2 AP 2-0010024, with a single administrative procedure.
Since all previous IST Program commitments were reviewed and incorporated, as appropriate, in the updated programs, all previous IST commitments are superseded by this document.
Please contact us ifthere are any questions about this submittal.
Very truly yours, J. A. Stall Vice President St. Lucie Plant JAS/GRM cc:
Regional Administrator, Region II, USNRC Senior Resident Inspector, USNRC, St. Lucie Plant
St. Lucie Units 1 and 2 Docket Nos. 50-335 and 50-389 L-98-5 Attachment 1
Page 1
'":;:.;:IMME9,",',@PWCA'TF:.
'.-,',,.;XI;ARE9::"-:l2+3),i';:
PR-01/1&2 Pump speed measurement instrumentation (AFW&Hydrazine)
PR-2 2-26-92 5-2-94 N/A PR42/1&2 Min-flowtesting AFW pumps PR43/1&2 Min-flowtesting BAMpumps PR44/I &2 Min-flowtesting containment spray pumps PR-05/1&2 Min-flowtesting HPSI pumps PR46/1 &2 Min-flowtesting LPSI pumps PRC PR-5 PR4 PR-9 PR-10 9-27-94 5-2-94 5-2-94 5-2-94 5-2-94 5-2-94 GL 8944, Position 9 GL 89-04, Position 9 GL 89-04, Position 9 GL 8944, Position 9 GL 8944, Position 9 PR47/1 &2 PR-08/2 PR49/2 Reactor coolant charging pumps vibration measurements Hydrazine pumps vibration measurements Hydrazine pumps flowrate measurements PR-12 PR-14 PR-17 8-5-94 8-23-93/5-2-94 8-23-93/5-2-94 8-'23-93/5-2-94 PR-10/1&2 EDG fuel oil pumps testing frequency PR-11/G Generic - evaluation ofpump test data vs.
NO NOTES:
(1)
(2)
(3)
Prior approved relief request is substantially the same as current submittal.
Impractical requirement due to limitations of design, construction, or system configuration as defined by 10CFR50.55a(a)(3)(ii).
The proposed alternate testing may be implemented upon submittal in lieu of applicable Code requirement without further approval unless otherwise directed.
(Ref.- NUREG-1482, Section 6)
Alternate testing of pre-approved relief requests may be implemented upon submittal i'n lieu of applicable Code requirement.
St. Lucie Units 1 and 2 Docket Nos. 50-335 and 50-389 L-98-5 Attachment 1 Page2 VR411/G VR43/G VRM/1&2 VR41S/1&2 VR46/1&2 VRM/1 VR48/1&2 VR49/1 VR-10/1 VR-11/1&2 VR-12/1&2 VR-13/1&2 VR-14/1&2 VR-1S/1 VR-16/1&2 Generic - Safety valve temperature stability during testing Generic - Safety valve temperature nnpcnsanon Generic - Safety valve test accumulator volume requirements Safety hjection system check valve closure tcstmg Safety injection system check valves - altcmatc fcsthlg of nlspcctlon Safety injection system check valves - alternate testing or inspection Main Stcam line check valves - inspection vs.
closure testing Main Stcaln to AFWcheck valves - inspection vs. closure tcstlng Maht Steam to AFWcheck valves - inspection vs. closure testing Main Feedwater supply check vaives-inspection vs. closure testing AFW nuni-flowcheck valves - inspection vs.
open testing Instrument air check valves - series testing EDG fuel oil transfer pump discharge check valves - deferred open test RWT outlet check valves - inspection vs. full-snoke testing Cont. spray eductor check valves - inspection vs. juH-stroke testing Cont. sump check valves - htspcction vs. full-stmke VR-12 VR-13 VR-14 VRAO Vol VR-38 VR-31 VR-17 VR-22 VR-19 VR-13 VR-14 VR-31 VR-27 VR-20 2-26-92 9-27-94 9-27-94 9-17-93 S-2-94 S-594 NG GL89M, Pos 1
NUREG 4.1.2 OL89M, Pos 1&2 NUREG 4.1.2 OL89M, Pos2 OL89M, Pos 2 NUREG App. A GL89M, Pos2 NUREG App. A GL89M, Pos2 NUREG 4.1.1, App2 GL89M, Pos2 NUREG hpp. A OL8%04, Pos 2 NUREG App. A GL8904, Pos2 NUREG A
. h
St. Lucie Units 1 and 2 Docket Nos. 50-335 and 50-389 L-98-5 Attachment 1
Page 3 VR-17/142 VR-18/1tk2 VR-19/1&2 Cont. spray header check valves - inspection vs. full-stroke testing EDG system valves (various) - deferred testing schedule Containment vacuum breaker testing VR-20 5-2-Q GL8%45 ~ Pos 2 NUREG App. A NOTES:
(1)
(2)
(3)
Prior approved relief request is substantially the same as current submittal.
Impractical requirement due to limitations of design, construction, or system configuration as defined by 10CFR50.55a(a)(3)(ii).
The proposed alternate testing may be implemented upon submittal in lieu of applicable Code requirement without further approval unless otherwise directed.
(Ref. NUREG-1482, Section 6)
Alternate testing of pre-approved relief requests may be implemented upon submittal in lieu of applicable Code requirement.
St. Lucie Units 1 and 2 Docket Nos." 50-335 and 50-389 L-98-5 Attachment2 Page1 IMPLEMENTATIONPLAN Generic Letter 89-04, Supplement 1, Guidance on Developing Acceptable IST Programs, dated April 4, 1995, granted "Commission approval" pursuant to 10 CFR 50.55a(f)(4)(iv) to allow implementation of specific portions of the 1989 Edition of the ASME Code incorporated in 10 CFR 50.55a(b) provided the implementation is consistent with NUREG-1482, Guidelines for IST at 1Vuclear Power Plants, dated April 1995.
The current Technical Specifications require that the IST Program "...be performed in accordance with Section XIof ASME B&PV Code and applicable Addenda as required by 10 CFR 50.55a(g)
[since changed to 10 CFR 50.55a(t)], except where specific written relief has been granted by the Commission..."
Therefore, FPL is prohibited from implementing any portion of the 1989 Edition of the ASME Code for a valve or pump where specific relief from a Code requirement is needed.
Unlike the current Technical Specifications, the Improved Standard Technical Specifications (ISTS), NUREG 1432, do not require preapproval of relief requests.
FPL submitted a Proposed License Amendment (PLA) by FPL Letter L-97-215 dated August 22, 1997, to adopt the ISTS wording.
Consequently, after this PLA is approved, FPL will be able to implement relief requests as allowed by 10 CFR 50.55a.
Specifically, 10 CFR 50.55a(f)(5)(iv) allows up to one full year following implementation of each relief request to demonstrate that a Code requirement is impractical.
Where relief is required, the updated IST Program requirements will not be fully implemented and the old requirements willnot be deleted until one of the following actions is completed by the NRC:
The Proposed License Amendment, Pump and Valve IST Program, submitted by FPL Letter L-97-215 dated August 22, 1997, is approved.
Relief requests for specified testing in the combined St. Lucie Unit 1 and Unit 2 IST Program are approved.
Unit 1 Implementation Assuming either the Proposed License Amendment, Pump and Valve IST Program, submitted by FPL Letter L-97-215 dated August 22, 1997, or the specific relief requests are approved no later than the starting date for the third ten-year interval (February 12, 1998), all Unit 1
implementing surveillance test procedures and the IST administrative procedures will be implemented prior to August 11, 1998 and any testing performed subsequent to August 11, 1998 willbe performed in accordance with the new Code requirements.
St. Lucie Units 1 and 2 Docket Nos. 50-335 and 50-389 L-98-5 Attachment 2 Page 2 Testing performed during cold shutdown periods and refueling outages after August 11, 1998, willbe conducted in accordance with the new Code requirements.
Completion of any new testing performed during cold shutdown will be completed during first the cold shutdown following August 11, 1998 that time and circumstances permit.
Any Unit 1 IST testing requirements identified in this revision of the program for newly added components that can only be performed during refueling or cold shutdown periods have been performed during the Fall 1997 refueling/steam generator replacement outage (SL1-15).
Unit 2 Implementation Assuming either the Proposed License Amendment, Pump and Valve IST Program, submitted by FPL letter L-97-215 dated August 22, 1997, or the specific relief requests are approved no later than February 12, 1998, all IST surveillance test procedures implementing the new ASME Code requirements will be revised as required and implemented prior to the end of the next refueling outage (SL2-11) currently scheduled for the Fall 1998.
Any new Unit 2 IST Program tests that can only be performed during a cold shutdown or refueling outage willbe performed during the Fall 1998 Unit 2 refueling outage (SL2-11).