October
16,
1995
Florida Power and Light Company
ATTN:
Mr. J.
H. Goldberg
President
- Nuclear Division
P. 0.
Box 14000
Juno
Beach,
FL
33408-0420
SUBJECT:
NRC
INSPECTION
REPORT
NOS. 50-335/95-15
AND 50-389/95-15
AND
Gentlemen:
This refers to the inspection
conducted
on July 30 through September
16,
1995,
at the St.
Lucie facility.
The purpose of the inspection
was to determine
whether activities authorized
by the license
were conducted safely
and in
accordance
with NRC requirements.
At the conclusion of the inspection,
the
findings were discussed
with those
members of your staff identified in the
enclosed report.
~
~
~
~
~
~
~
~
~
Areas
examined during the inspection
are identified in the report.
Within
these
areas,
the inspection consisted of selective
examinations of procedures
and representative
records,
interviews with personnel,
and observation of
activities in progress.
Based
on the results of this inspection,
the
NRC has determined that
violations of NRC requirements
occurred.
These violations are cited in the
enclosed
Notice of Violation (Notice)
and the circumstances
surrounding
them
are described
in detail in the subject inspection report.
The violations are
of concern
because
they identify problems of procedural
inadequacy,
the lack
of procedural
compliance,
personnel
performance
and equipment reliability and
reflect
on your ability to identify and correct deficiencies
before they
adversely
impact plant operations.
You are required to respond to this letter and should follow the instructions
specified in the enclosed
Notice when preparing your response.
In your
response,
you should
document
the specific actions
taken
and any additional
actions
you plan to prevent recurrence.
Your response
may reference
or
include previous docketed
correspondence, if the correspondence
adequately
.
addresses
the required response.
After reviewing your response
to this
Notice, including your proposed corrective actions
and the results of future
inspections,
the
NRC will determine
whether further
NRC enforce'ment
action, is
necessary
to ensure
compliance with NRC'regulatory requirements.
OFFICIAL COPY
95ii140306 95iOi6
ADQCK 05000335
8
In accordance
with 10 CFR 2.790 of the NRC's "Rules of Practice,"
a copy of
this letter and its enclosures will be placed in the
NRC Public Document
Room.
Should you have
any questions
concerning this letter,
please
contact us.
Sincerely,
Orig signed
by Kerry D. Landis
Docket Nos.
50-335,
50-389
License
Nos.
Enclosures:
2.
NRC Inspection
Report
cc w/encls:
D. A. Sager
Vice President
St.
Lucie Nuclear Plant
P. 0.
Box 128
Ft. Pierce,
FL
34954-0128
H.
N. Paduano,
Manager
Licensing
and Special
Programs
Florida Power
and Light Company
P. 0.
Box 14000
Juno
Beach,
FL
33408-0420
J. Scarola
Plant General
Manager
St.
Lucie Nuclear Plant
P. 0.
Box 128
Ft. Pierce,
FL
34954-0128
Robert
E.
Dawson
Plant Licensing Manager
St. Lucie Nuclear Plant
P. 0.
Box 128
Ft. Pierce,
FL
34954-0218
J.
R.
Newman,
Esq.
Morgan,
Lewis
& Bockius
1800
M Street,
NW
D.
C.
20036
cc w/encls:
Continued
see
page
3
Kerry D. Landis, Acting Chief
Reactor Projects
Branch
2
Division of Reactor Projects
FP6L
cc w/encls:
Continued
John T. Butler,
Esq.
Steel,
Hector and Davis
4000 Southeast
Financial
Center
Miami, FL
33131-2398
Bill Passetti
Office of Radiation Control
Department of Health
and
Rehabilitative Services
1317 Winewood Boulevard
Tallahassee,
FL
32399-0700
Jack Shreve
Public Counsel
Office of the Public 'Counsel
c/o The Florida Legislature
111 West Madison Avenue,
Room 812
Tallahassee,
FL
32399-1400
Joe Myers, Director
Division of Emergency
Preparedness
Department of Community Affairs
2740 Centerview Drive
Tallahassee,
FL
32399-2100
Thomas
R. L. Kindred
County Administrator
St.
Lucie County
2300 Virginia Avenue
Ft. Pierce,
FL
34982
Charles
B. Brinkman
,
Washington Nuclear Operations
ABB Combustion
Engineering,
Inc.
12300 Twinbrook Parkway,
Suite 3300
Rockville,
20852
0
0
+ ~
Distribution w encls:
J. Norris,
G. Hallstrom, RII
PUBLIC
NRC Resident
Inspector
U.S. Nuclear Regulatory
Comm.
7585 South Highway AIA
Jensen
Beach,
FL
34957-2010
SEND TO PUBLIC DOCUMENT IIOOM?
YES
NO
OFFICE
SIGNATUIIE
NAME
DATE
COPY?
ELee
10 //4 / 95
YES
NO
RPrevette
10 // /85
YES
NO
MMiller
10// /95
YES
NO
AAoillo
10/ 6/95
YES
NO
10/
/95
YES'O
10/
/85
YES
NO