Forwards Insp Repts 50-335/95-15 & 50-389/95-15 on 950730-0916.Violations of Concern Because They Identify Problems of Procedural Inadequacy & Lack of Procedural Compliance
ML17228B321
Person / Time
Site: Saint Lucie  NextEra Energy icon.png
Issue date: 10/16/1995
From: Landis K
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Goldberg J
FLORIDA POWER & LIGHT CO.
Shared Package
ML17228B322 List:
References
NUDOCS 9511140306
Download: ML17228B321 (6)


See also: IR 05000335/1995015

Text

'a

October

16,

1995

Florida Power and Light Company

ATTN:

Mr. J.

H. Goldberg

President

- Nuclear Division

P. 0.

Box 14000

Juno

Beach,

FL

33408-0420

SUBJECT:

NRC

INSPECTION

REPORT

NOS. 50-335/95-15

AND 50-389/95-15

AND

NOTICE OF VIOLATION

Gentlemen:

This refers to the inspection

conducted

on July 30 through September

16,

1995,

at the St.

Lucie facility.

The purpose of the inspection

was to determine

whether activities authorized

by the license

were conducted safely

and in

accordance

with NRC requirements.

At the conclusion of the inspection,

the

findings were discussed

with those

members of your staff identified in the

enclosed report.

~

~

~

~

~

~

~

~

~

Areas

examined during the inspection

are identified in the report.

Within

these

areas,

the inspection consisted of selective

examinations of procedures

and representative

records,

interviews with personnel,

and observation of

activities in progress.

Based

on the results of this inspection,

the

NRC has determined that

violations of NRC requirements

occurred.

These violations are cited in the

enclosed

Notice of Violation (Notice)

and the circumstances

surrounding

them

are described

in detail in the subject inspection report.

The violations are

of concern

because

they identify problems of procedural

inadequacy,

the lack

of procedural

compliance,

personnel

performance

and equipment reliability and

reflect

on your ability to identify and correct deficiencies

before they

adversely

impact plant operations.

You are required to respond to this letter and should follow the instructions

specified in the enclosed

Notice when preparing your response.

In your

response,

you should

document

the specific actions

taken

and any additional

actions

you plan to prevent recurrence.

Your response

may reference

or

include previous docketed

correspondence, if the correspondence

adequately

.

addresses

the required response.

After reviewing your response

to this

Notice, including your proposed corrective actions

and the results of future

inspections,

the

NRC will determine

whether further

NRC enforce'ment

action, is

necessary

to ensure

compliance with NRC'regulatory requirements.

OFFICIAL COPY

95ii140306 95iOi6

PDR

ADQCK 05000335

8

PDR

FP&L

In accordance

with 10 CFR 2.790 of the NRC's "Rules of Practice,"

a copy of

this letter and its enclosures will be placed in the

NRC Public Document

Room.

Should you have

any questions

concerning this letter,

please

contact us.

Sincerely,

Orig signed

by Kerry D. Landis

Docket Nos.

50-335,

50-389

License

Nos.

DPR-67,

NPF-16

Enclosures:

1. Notice of Violation

2.

NRC Inspection

Report

cc w/encls:

D. A. Sager

Vice President

St.

Lucie Nuclear Plant

P. 0.

Box 128

Ft. Pierce,

FL

34954-0128

H.

N. Paduano,

Manager

Licensing

and Special

Programs

Florida Power

and Light Company

P. 0.

Box 14000

Juno

Beach,

FL

33408-0420

J. Scarola

Plant General

Manager

St.

Lucie Nuclear Plant

P. 0.

Box 128

Ft. Pierce,

FL

34954-0128

Robert

E.

Dawson

Plant Licensing Manager

St. Lucie Nuclear Plant

P. 0.

Box 128

Ft. Pierce,

FL

34954-0218

J.

R.

Newman,

Esq.

Morgan,

Lewis

& Bockius

1800

M Street,

NW

Washington,

D.

C.

20036

cc w/encls:

Continued

see

page

3

Kerry D. Landis, Acting Chief

Reactor Projects

Branch

2

Division of Reactor Projects

FP6L

cc w/encls:

Continued

John T. Butler,

Esq.

Steel,

Hector and Davis

4000 Southeast

Financial

Center

Miami, FL

33131-2398

Bill Passetti

Office of Radiation Control

Department of Health

and

Rehabilitative Services

1317 Winewood Boulevard

Tallahassee,

FL

32399-0700

Jack Shreve

Public Counsel

Office of the Public 'Counsel

c/o The Florida Legislature

111 West Madison Avenue,

Room 812

Tallahassee,

FL

32399-1400

Joe Myers, Director

Division of Emergency

Preparedness

Department of Community Affairs

2740 Centerview Drive

Tallahassee,

FL

32399-2100

Thomas

R. L. Kindred

County Administrator

St.

Lucie County

2300 Virginia Avenue

Ft. Pierce,

FL

34982

Charles

B. Brinkman

,

Washington Nuclear Operations

ABB Combustion

Engineering,

Inc.

12300 Twinbrook Parkway,

Suite 3300

Rockville,

MD

20852

0

0

+ ~

FP&L

Distribution w encls:

J. Norris,

NRR

G. Hallstrom, RII

PUBLIC

NRC Resident

Inspector

U.S. Nuclear Regulatory

Comm.

7585 South Highway AIA

Jensen

Beach,

FL

34957-2010

SEND TO PUBLIC DOCUMENT IIOOM?

YES

NO

OFFICE

SIGNATUIIE

NAME

DATE

COPY?

ELee

10 //4 / 95

YES

NO

RPrevette

10 // /85

YES

NO

MMiller

10// /95

YES

NO

AAoillo

10/ 6/95

YES

NO

10/

/95

YES'O

10/

/85

YES

NO

OFFICIAL RECORD

COPY

DOCUMENT NAME:

G: iSL9515.AUG

I'