ML17228A376
| ML17228A376 | |
| Person / Time | |
|---|---|
| Site: | Saint Lucie |
| Issue date: | 11/22/1993 |
| From: | Sinkule M NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Goldberg J FLORIDA POWER & LIGHT CO. |
| Shared Package | |
| ML17228A377 | List: |
| References | |
| NUDOCS 9312140043 | |
| Download: ML17228A376 (7) | |
See also: IR 05000335/1993022
Text
EOKD 1
M1
REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
ACCESSION
NBR: 9312140043
DOC. DATE: 93/11/22
NOTARIZED:
NO
ACIL:50-335 St.
Lucie Plant
Unit li Florida Poeer
5 Light Co.
50-389 St.
Luci'e Plant~
Unit 2i Florida Poeer
h Light Co.
AUTH. NAME
AUTHOR AFFILIATION
SINKULEiM. V.
Region
2 (Post
820201)
REC IP. NAME
RECIPIENT AFFILIATION
GOLDBERG'. H.
Florida Poeer
5 Light Co.
SUBJECT:
Foreards
insp repts
50-335/93-22
8c 50-389/'93-22
on
93092b-1023
5 noti c e
of vio lation.
DISTRIBUTION CODE:
IE01D
COPIES
RECEIVED: LTR
ENCL
SIZE:
TITLE: General
(50 Dkt)-Insp Rept/Notice of Violation Response
NOTES
DOCKET ¹
05000335
05000389
g5
o
RECIPIENT
ID CODE/NAME
PD2-2
INTERNAL: ACRS
AEOD/DSP/ROAB
AEOD/TTC
NRR/DORS/OEAB
NRR/DRIL/RPEB
NRR/PMAS/ILPB1
NUDOCS-ABSTRACT
OQC/HDS3
RES/HFB
COPIES
LTTR ENCL
1
1
2
2
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
REC IP IENT
ID CODE/NAME
NORR ISi J
AEOD/DEIB
AEOD/DSP/TPAB
DEDRO
NRR/DRCH/HHFB
NRR/DRSS/PEPB
NRR/PMAS/ ILPB2
OE~~
REG F L
02
RGN2
FILE
01
COPIES
LTTR ENCL
1
1
1
1
1
1
1
1
1
1
1
D
EXTERNAL:
EGS.G/BRYCEn J. H.
1
1
NRC
1
1
NOTE TO ALL RIDS
RECIPIENTS:
PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK.
ROOh! PI-~7 (EXT. ~0>>-2065) TO ELIMINATEYOUR NAME FROh< DISTRIBUTION
LISTS FOR DOCUh!ENTS YOU DON'T NEED!
TOTAL NUMBER OF COPIES
REQUIRED:
LTTR
24
ENCL
24
w+ ~
NOy 22
L9%
Docket Nos.
50-335,
50-389
License
Nos.
Florida Power
8 Light Company
ATTN:
J.
H. Goldberg
President
Nuclear Division
P. 0.
Box 14000
Juno
Beach,
33408-0420
Gentlemen:
SUBJECT:
(NRC INSPECTION
REPORT
NOS. 50-335/93-22
AND 50-389/93-22)
This refers to the inspection
conducted
by S. A. Elrod of this office on
September
26 - October 23,
1993.
The inspection
included a'eview of
activities authorized for your St.
Lucie facility.
At the conclusion of the
inspection,
the findings were discussed
with those
members of your staff
identified in the enclosed report.
Areas
examined during the inspection
are identified in the report.
Within
these
areas,
the inspection consisted of selective
examinations of procedures
and representative
records,
interviews with personnel,
and observation of
activities in progress.
Based
on the results of this inspection,
certain of your activities appeared
to be in violation of NRC requirements,
as specified in the enclosed
Notice of
Violation (Notice).
You are required to respond to this letter
and should follow the instructions
specified in the enclosed
Notice when preparing your response.
In your
response,
you should
document the specific actions taken
and any additional
actions you plan to prevent recurrence.
After reviewing your response
to this
Notice, including your proposed corrective actions
and the results of future
inspections,
the
NRC will determine
whether further
NRC enforcement
action is
necessary
to ensure
compliance with NRC regulatory requirements.
In accordance
with 10 CFR 2.790 of the NRC's "Rules of Practice,"
a copy of
this letter and its enclosures will be placed in the
NRC Public Document
Room.
The responses
directed
by this letter and the enclosed
Notice are not subject
to the clearance
procedures
of the Office of Management
and Budget
as required
by the Paperwork Reduction Act of 1980,
Pub.
L. No.96-511.
9312140043
931122
ADOCK 05000335
8
Florida Power 5 Light Company
Should you have
any questions
Enclosures:
2.
NRC Inspection
Report
gy 22 $%
2
concerning this letter, please
contact
us.
Sincerely,
QJ/CAAt QGHQ >
~y~g Y. S44(UlE
Marvin V. Sinkule, Chief
Reactor Projects
Branch
2
Division of Reactor Projects
cc w/encls:
D. A. Sager
Vice President
St.
Lucie Nuclear Plant
P. 0.
Box 128
Ft. Pierce,
FL
34954-0128
H. N. Paduano,
Manager
Licensing
and Special
Projects
Florida Power
and Light Company
P. 0.
Box 14000
Juno
Beach,
FL
33408-0420
C.
L. Burton
Plant General
Manager
St. Lucie Nuclear Plant
P. 0.
Box 128
Ft. Pierce,
FL
34954-0128
Harold F. Reis,
Esq.
Newman
& Holtzinger
1615
L Street,
NW
D.
C.
20036
John T. Butler,
Esq.
Steel,
Hector and Davis
400 Southeast
Financial
Center
Miami, FL
33131-2398
Bill Passetti
Office of Radiation Control
Department of Health
and
Rehabilitative Services
1317 Winewood Boulevard
Tallahassee,
FL
32399-0700
cc w/encls cont'd:
(See
page 3)
e
Florida Power
5 Light Company.
cc w/encls cont'd:
Jack Shreve
Public Counsel
Office of the Public Counsel
c/o The Florida Legislature
111 West Hadison Avenue,
Room 812
Tallahassee,
FL
32399-1400
Joe Hyers, Director
Division of Emergency
Preparedness
Department of Community Affairs
2740 Centerview Drive
Tallahassee,
FL
32399-2100
Thomas
R. L. Kindred
County Administrator
St.
Lucie County
2300 Virginia Avenue
Ft. Pierce,
FL
34982
Charles
B. Brinkman
Washington Nuclear Operations
ABB Combustion
Engineering,
Inc.
12300 Twinbrook Parkway,
Suite
3300
Rockville,
ND
20852
bcc w/encls:
K. Landis, RII
J. Norris,
NRC Resident
Inspector
Document Control
Desk
RII:DRP
g,C.L
~~h'L g
llgzx /93
RII'
KLa
s
ll/!PJ /93
0