Text
APR 28 1992
Docket Nos.
50-335,
50-389
License
Nos.
Florida Power
& Light Company
ATTN:
J.
H. Goldberg
President - Nuclear Division
P. 0.
Box 14000
Juno Beach, Florida
33408-0420
Gentlemen:
SUBJECT:
(NRC
INSPECTION
REPORT
NOS. 50-335/92-05
AND 50-389/92-05)
This refers
to the inspection
conducted
by
S.
A. Elrod of this office on
February
25 - March 23,
1992.
The inspection
included
a review of activities
authorized for your St. Lucie facility.
At the conclusion of the inspection,
the findings were discussed
with those
members
of your staff identified in the
enclosed
report.
Areas
examined
during the inspection
are identified in the report.
Within
these
areas,
the inspection consisted
of selective
examinations
of procedures
and
representative
records,
interviews with personnel,
and
observation
of
activities in progress.
Based
on the results
of this inspection,
certain of your activities
appeared
to be in violation of
NRC requirements,
as specified in the enclosed
Notice of
Violation (Notice).
The violations are of concern
because
lack of adherence
to the approved
Inservice Testing
Program
and failure to fully test equipment
response
to
a
loss
of offsite
power
both
reduce
assurance
of
system
operability.
In addition, the enclosed
Inspection
Report identifies activities
that violated
NRC requirements
that will not
be subject to enforcement action
because
the licensee's
efforts in identifying and/or correcting
the violation
meet the criteria specified in Section VII.B of the Enforcement Policy; there-
fore,
no response
with respect
to these
matters
is required.
The enclosed
Inspection
Report
also identifies activities that
appeared
to deviate
from
written
commitments
to the
NRC that will not require
a response
because
the
licensee's
efforts
in identifying
and/or
correcting
the
deviation
were
appropriate.
Your attention is .invited to an unresolved
item identified in the inspection
report.
This matter will be pursued
during future inspections.
You are required
to respond
to this letter
and should follow the instructions
specified
in the
enclosed
Notice
when
preparing
your response.
In your
response,
you should
doc'ument
the specific actions
taken
and
any additional
actions
you plan to prevent recurrence.
After reviewing your response
to this
Notice, including your pr'oposed
corrective actions
and the results
of future
9205120070
920422
ADOCK 05000335
8
QfOl
Florida Power
5 Light Company
APR
P, 2 ]992
inspections,
the
NRC will determine
whether further
NRC enforcement
action is
necessary
to ensure
compliance with NRC regulatory requirements.
In accordance
with 10 CFR 2.790 of the
NRC's "Rules of Practice,"
a copy of
this letter, its enclosure,
and
any reply will be placed in the
NRC Public
Document
Room.
'he
responses
directed
by this letter
and the enclosed
Notice are not subject
to the clearance
procedures
of the Office of Management
and Budget as required
by the Paperwork
Reduction act of 1980,
Pub.
L. No. 96.511.
Should you have
any questions
concerning this letter, please
contact us.
Sincerely,
Enclosures:
2.
NRC Inspection Report
cc w/encl:
D. A. Sager
Site Vice President
St. Lucie Nuclear Plant
P.'0.
Box 128
Ft. Pierce,
FL
34954-,0128
R.
E. Grazio, Director
Nuclear Licensing
Florida Power
and Light Co.
P. 0.
Box 14000
Juno
Beach,
FL
33408-0420
G. J. Boissy
Plant General
Manager
St. Lucie Nuclear Plant
P. 0.
Box 128
Ft. Pierce,
FL
34954-0128
Harold F. Reis,
Esq.
Newman
& Holtzinger
1615
L Street,
NW
D.
C.
20036
cc w/encls:
(See
page
2)
ORtClHAi, SICH'V
>~;<<VS,'S V. SlWULE
Marvin V. Sinkule, Chief
Reactor Projects
Branch
2
Division of Reactor Projects
Florida Power
& Light Company
APR 28 1992
cc'w/encls cont'd:
John T. Butler,
Esq.
Steel,
Hector
and Davis
400 Southeast
Financial
Center
Niami,
FL
33131-2398
Jacob
Daniel
Nash
Office of Radiation Control
Department of Health
and
Rehabilitative Services
1317 Winewood Boulevard
Tallahassee,
FL
32399-0700
Administrator
Department of Environmental'egulation
Power Plant Siting Section
State of Florida
2600 Blair Stone
Road
Tallahassee,
FL
32301
Jack
Shreve
Public Counsel
Office of the Public Counsel
c/o The Florida Legislature
ill West Hadision Ave.,
Room 812
Tallahassee,
FL
32399-1400
Robert
G. Nave, Director
Emergency
Management
Department of Community Affairs
2740 Centerview Drive
Tallahassee,
FL
32399-2100
James
V. Chisholm
County Administrator
St. Lucie County
2300 Virginia Avenue,
Fort Pierce,
FL
34982
Charles
B. Brinkman
Washington Nuclear Operations
ABB Combustion Engineering,
Inc.
12300 Twinbrook Parkway, Suite
330
Rockville,
ND
20852
State of Florida
bcc w/encl:
J. Johnson,
RII
K. Landis, RII
J. Norris,
Document Control
Desk
NRC Resident
Inspector
U.S. Nuclear Regulatory
Commission
7585 South
HIghway A1A
Jensen
Beach,
FL
33457
RI I 'DRP
R
n
04/) Lp/92
RII:
KLa di
04/~/92