Forwards Insp Repts 50-335/92-02 & 50-389/92-02 on 920127-31.No Violations Noted
ML17227A334
Person / Time
Site: Saint Lucie  NextEra Energy icon.png
Issue date: 03/04/1992
From: Cline W
NRC Office of Inspection & Enforcement (IE Region II)
To: Goldberg J
Florida Power & Light Co
Shared Package
ML17227A335 List:
References
NUDOCS 9203180021
Download: ML17227A334 (3)


See also: IR 05000335/1992002

Text

Docket Nos. 50-335,

50-389

License

Nos.

DPR-67,

NPF-16

Florida Power and Light Company

ATTN:

Yir. J.

H. Goldberg

President

- Nuclear

P. 0.

Box 14000

Juno

Beach,

FL

33408-0420

Gentlemen:

SUBJECT:

NRC INSPECTION

REPORT

NOS. 50-335/92-02

AND 50-389/92-02

This refers

to the inspection

conducted

by

R.

P.

Carrion of this offi'ce on

January

27-31,

1992.

The inspection

included

a review of activities authorized

for y'our St. Lucie facility,

At the conclusion of the inspection,

the findings

were discussed

with those

members of your staff identified in the report.

Areas

examined

during the inspection

are identified in the report;

kithin

~

~

~

~

.these

areas,

the inspection

consisted of selective

examinations

of procedures

and

representative

records,

interviews with personnel,

.and observation'f

activities in progress.

The enclosed

Inspection

Report identifies activities that appeared

to violate

NRC requirements

that are not cited; therefore,

a response

is not required.

In accordance

with 10 CFR 2.790(a),

a

copy of this letter

and its enclosure

will be placed in the

NRC Public Document

Room.

Should you have any questions

concerning this letter, please

contact

us.

Sincerely,

Enclosure:

NRC Inspection

Report

cc w/encl;

,(See

page

3)

Radiological Protection

and

Emergency

Preparedness

Branch

Division of Radiation Safety

and Safeguards

92031S0021

920304

PDR

ADOCK 05000335

8

PDR

Florida Power and Light Company

cc w/encl:

D. A. Sager,

Vice President

St. Lucie Nuclear Plant

P. 0.

Box 128

Ft. Pierce,

FL

34954-0128

R.

E. Grazio, Director

Nuclear Licensing

Florida Power

and Light Co.

P. 0.

Box 14000

Juno

Beach,

FL

33408-0420

G. 'J. Boissy, Plant Manager

St. Lucie Nuclear Plant

P. 0.

Box 128

Ft. Pierce,

FL

34954-0128

Harold F. Reis,

Esq.

Newman

8, Holtzinger

1615

L Street,

NW

Washington,

D.

C.

20036

John T. Butler, Esq.

Steel,

Hector and Davis

400 Southeast

Financial

Center

'iami,

FL

33131-2398

Jacob

Daniel

Nash

Office of Radiation Control

Department of Health and

Rehabilitative Services

1317 Winewood Boulevard

Tallahassee,

FL

32399-0700

Administrator

Department of Environmental

Regulation

Power Plant Siting Section

State of Florida

2600 Blair Stone

Road

Tallahassee,

FL

32301

Jack Shreve

Public Counsel

Office of the Public Counsel

c/o The Florida Legislature

111 West Madision Ave.,

Room 812

Tallahassee,

FL

32399-1400

cc w/encl:

(cont'd

on page

3)

Florida Power and Light Company

(cc w/encl:

cont'd)

Robert

G. Have, Director

Emergency

Nan'agement

Department of Community Affairs

2740 Centerview Drive

Tallahassee,

FL

32399-2100

James

V. Chisholm

County Administrator

St. Lucie County

2300 Virginia Avenue,

Fort Pierce,

FL

34982

Charles

B. Brinkman

Mashington Nuclear Operations

ABB Combustion

Engineering,

Inc.

12300 Twinbrook Parkway, Suite

330

Rockville,

YiD

20852

State of Florida

bcc w/encl:.

J.

Johnson,

RII

K. Landis, RII

J. Norris,

NRR

Document Control

Desk

NRC Resident

Inspector

U.S. Nuclear Regulatory

Commission

7585 South Highicay A1A

Jensen

Beach,

FL

= 33457

R II; DRSS

RII: DRSS

RI I: DRP

RCarr

n

TDecker

KLandis

y /</

2

5/z/92

3 /) /92