ML17227A333

From kanterella
Jump to navigation Jump to search
Monthly Operating Repts for Feb 1992 for St Lucie Units 1 & 2.W/920309 Ltr
ML17227A333
Person / Time
Site: Saint Lucie  NextEra Energy icon.png
Issue date: 02/29/1992
From: Breen J, Sager D
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
L-92-61, NUDOCS 9203160288
Download: ML17227A333 (15)


Text

ACCELERATED DISTjUBUTION. DEMONSTI&.TION SYSTEM REGULATORINFORMATION DISTRIBUTION +1'EM (RIDE)

ACCiESS ION NBR: 9203160288 DOC DATE:

~ -%~~

FA6II. 5()-335 St. Lucie Plant, Unit 1, Florida Power & Light Co.

NOTARIZED: NO DOCKET 05000335 50-389 St. Lucie Plant, Unit 2, Florida Power & Light Co. 05000389 AUTH. NAME AUTHOR AFFILIATION BREEN,J.J. Florida Power & Light Co.

SAGER,D.A. Florida Power & Light Co.

RECIP.NAME RECIPIENT AFFILIATION

SUBJECT:

Monthl rating repts for Feb 1992 for St Lucie Units 1 &

2. 9 0309 tr.

DISTRIBUTION CODE: ZE24D COPIES RECEIVED:LTR TITLE: Monthly Operating Report (per Tech Specs)

I ENCL J BISE:

NOTES:

RECIPIENT COPIES RECIPIENT COPIES ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD2-2 LA 3 3 PD2-2 PD 1 1 NORRISFJ 1 1 INTERNAL: ACRS 10 10 AEOD/DOA 1 1 AEOD/DSP/TPAB 1 1 NRR/DLPQ/LPgB10 1 1 NRR/DOEA/OEAB 1 1 R G,FILE~ 0+1 I I RGN2 1 1 EXTERNAL EG & G BRYCE I J ~ H 1 1 NRC PDR 1 1 NSIC 1 1 NOTE TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE> CONTACT THE DOCUMENT CONTROL DESK, ROOM P 1-37 (EXT. 20079) TO ELIMINATEYOUR NAME FROM DISTRIBUTION LISIS FOR DOCUMENTS YOU DON'T NEED!

TOTAL NUMBER OF COPIES REQUIRED: LTTR 24 ENCL 24

P.o. Box 12, Ft. Prerce, FL 34954-0128

%PI March 9, 1992 L-92-61 10 CFR 50.36 U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555 Gentlemen:

Re: St. Lucie Units 1 and 2 Docket Nos. 50-335 and 50-389 Monthl 0 eratin Re ort Attached are the February, 1992 Operating Status and Summary of Operating Experience Reports for St. Lucie Units 1 and 2.

Should you have any questions on this information, please contact us ~

Very truly yours, D. A. ger Vice esident St. ie Plant DAS:JJB:kw cc: Stewart D. Ebneter, Regional Administrator, Region Senior Resident Inspector, USNRC, St. Lucie Plant II, USNRC Attachments DAS/PSL N641-92 9 203160288 92O>

PDR ADOCK 05000335 PDR R

6 FPL Group company p~P

0 I 4

~ >

AVERAGE DAILY UNIT POWER LEVEL DOCKET N0% 50 335 UNIT St. Lucia 1 DATE COMPLETED BY Z.Z. Breen MONTH FEBRUARY 1992 DAY AVERAGE DAILY POWER LEVEL (MWe-,Net) 2/ 1/92 866 2/ 2/92 868 2/ 3/92 868 2/ 4/92 869 2/ 5/92 866 2/ 6/9Z 867 2/ r/92 866 2/ 8/92 868 2/ 9/9Z 868 2/10/92 869 2/11/92 869 2/12/92 870 2/13/92 871 2/14/92 871 2/15/92 871 2/16/'92 869 2/17/92 868 2/18/92 866 2/19/92 867 2/20/92 867 2/21/92 864

'7/29/92 866 2/Z3/92 866 2/24/92 866 2/25/92 866 2/Z6/92 867 2/27/92 867 2/28/92 866 2/29/92 866

OF'ERATING DATA REF'QR~

DOCi:ET 'fO 50 335 MAR 09 1SS2 COMF'LETED E-:Y J tJ t I REEN TELEF'I.IONE 487/468/4248 OPF RATING STAi TUS UNIT NAME: ST. LUCIE IJNXT 1

2. REPORTING PERIOD: FEBRUARY 1992 3 t LICENSED THERMAL F'OHER (MHT): ~788 NAMEPLATE RAT1NG (GROSS MHE) 7 858 5t DESIGN ELECTRICAL RATING (NET MHE): 838 6 t MAXIMUM DFPENDABLE CAF'ACXTY (GROSS MHE) t 872 7 ~ MAXIMUM DEF'E:NDABLE CAF'ACITY (NET MHE): . 839 8, IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NIJMBER 3 THROUGH 7)

SINCE LAST REF'ORT i GIVE REASONS:

9t POWER LEVEL TO WHICH RESTRICTED'F ANY (NET MHE)

10. REASONS FOR RESTRICTIONS IF ANY l MONTHLY - YTD- CUMULATIVE
11. HOURS IN REF'ORT F'ERIOD t 696 1440 133176t0
12. NUMBER OF HOURS REACTOR HAS CRITICAL 696.0 1440.0 101549 6 ~

13 REACTOR RESERVE SHUTDOWN HOURS OtO 0.0 205t3 14t I-IOURS GENERATOR ON-LXNE 696tO 1440.0 100635.9

15. UNIT RESERVE SHUTDOHN HOURS 8tO OtO 39.3
16. GROSS THERMAL ENERGY GENERATED (MWH) 1879532 3888540 ~5961 79~

l7t GROSS ELECTRICAL ENERGY GENERATED (MHH) 634660 1312610 85645430 l8. NET ELECTRICAL ENERGY GENERATED (MHH) 603698 1248494 80932190 19 t UN1T SERVICE FACTOR 100.0 100.0 75t6

20. UNIT A VAXLABILITYFACTOR 100tO 180t0 7&t6
21. CAF'ACITY FACTOR (USING MDC NET) 103.4 103.3 7iJ t
22. CAPACITY FACTOR (USING DER. NET ) 184t5 104.5 P7
23. UNIT FORCED OUTAGE RATE 0.0 0.0 4 ~ 1
24. SHUTDOWNS SCI-IEDULED OVER NEXT 6 MONTHS

'25. IF SHUT DOWN AT END OF REPORT F'ERXOD ESTIMATED DATE OF STARTUF'

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO. 50-335 UNIT NAME T L CIE NIT I DATE Q COMPLETED BY J. J. BREEN PHLHPHDH8 2440468424 REPORT MONTH FEBRUARY I 2 No. Date Type Duration (Hours)

Reason~ Method of Shutting Reactor'icensee Event Report System Code'omponent Code'ause & Corrective Action to Down ¹ Prevent Recurrence The average daily power for Unit 1 for the month of February was 100%.

F Forced Reason Method Exhibit G - Instructions for S Schalulcd A - Equipmcnt failure (explain) 1 - Manual preparation of Data Entry B - Maintcnancc or Test 2 - Manual Scram Sheets Licenscc Event Report C - Refueling 3 - Automatic Scram (LER) File (NUREG4161)

D - Regulatory restriction 4 - Continual E - Operator Training dc License Examination 5 - Load Reduction F - Administrative 9 - Other (Explain) Exhibit 1 - Same Source G - Operational Error (Expalin)

H - Other (Explain) tel san FPL

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO+ 50-335 UNIT St. Lucie 1 DATE COMPLETED BY J'. . Breen TELEPHONE 407 468 4248 REPORT MONTH FEBRUARY 1992 For the month of February the average daily power for Unit 1 was 1004'.

In accordance with the requirements of Technical Specification 6.9.1.6, there were no challenges to the PORVs or safety valves during the report period.

AVERAGE DAILY UNIT POSER LEVEL DOCKET NO. 50-389 UNIT St. Lucie 2 DATE COMPLETED BY J.J. Breen TELEPHONE 407 468 4248 MONTH BRUARY 1992 DAY AVERAGE DAILY POSER LEVEL (Mve-Net) 2/ 1/92 870

~/oe 871 2/ 3/92 871 2/ 4/92 870 2/ 5/92 866 2/ 6/92 865 2/ i /92 366 2/ 8/92 867 2/ 9/92 867 2/10/92 868 2/li/92 868 2/12/92 841 2/13/92 728 2/14/92 856 2/15/92 871 2/16/92 869 2/17/92 866 2/18/92 865 2/19/92 865 2/20/92 864 2/21/92 863 6/'72/9'7 863 2/23/92 862 2/24/92 838 2/25/92 712 2/26/92 770 2/27/92 866 2/28/92 867 2/29/92 866

a.

QF'ERATIHG DATA REPORT DOC I(ET N Q 5e 3$ 9 DA'1E MAR 0 9 >992 COMPLETED BY J ~ Ji E:REEH TELEPI-IQNE 467/468/4248 OPERATING STATUS UHIT NAME i ST i LUCIE UHXT 2 2 ~ Rl:.F'ORTIHG PERIOD: FEBRUARY 1992 3 ~ L:I:CEHSED THI='RMAL F'OWEli (MAT): 2706 4, NAMEPLATE RATING (GrOS. MWE): 856 5i DESIGN ELECTRICAL RATIHG (NET MME): . 830 6, MAXIMUM DEPEHDABLE CAF'ACITY < GROSS MHE); 882 '"

7 ~ MAXIMUM DEPE:NDABLE CAF'ACITY (HET MME) l 839 8 Il= CHAHGES QCCUb: lH CAPACITY I 'ATXiHGS < ITEMS HUMBEI THI 'QUGI-I 7)

SIHCE LA T REF'Ql 'T GIVE REA, QNS t 9 ~ P(3HER LEVEL TQ WHICI-I I 'ESTRICTED IF ANY (NET MME >

ie, REA.oH, r-oR r.E Tr'ICTIONs IF ANY:

MONTHLY -YTD- CUMULATXVE 1 ~ HOURS XH RLPQRT PERIOD o 696 1440 75673.0

L2 ~ HUMBER QF I-IOURS REACTOR HAS CRITICAL 696.0 1440.0 65060.3 13+ REACTOR RE~EliVI='HUTDOWN HOURS 0.0 6+6 0.0 14i HOURS GENERATOR QH-LINE 696.0 1446 i 6 64844.3 15 i UNIT RESERVE SHUTDOWN HOURS 6+6 0.0 eio 16 ~ GROS)S THERMAL I='HERGY GENERATED (MHH> 1849176 38:L2136 167924742

. 17. GROSS ELECTRICAL ENERGY GENERATED (MHH) 624189 1284269 568J.6089 le HET ELECTRlCAL ENERGY GENERATED (MMH) 592303 1218180 52981027 19 uHIT SERVICE FACTor ieeie 100iO 85i3

' UNIT AVAILABILITYFACTOR

'0 ieeie 166+6 85.3 7 ] CAF'ACITY FACTOR < USING MDC NFT ) 161+4 106 i 8 8bt5

22. CAF'ACITY FACTOR < USING DER NET ) 102.5 IOii9 85.7 23 UNIT FORCED OUTAGE RATE 0.0 0.0 5'

'4+

SHUTDQHNS SCI-IEDULED OVER NEXT 6 MONTI-Is NEXT SCHEDULE ED SHUTDOWN 4/26/92 ForEFUEI..ING

25. XF SHUT DOHN A'I EHD OF REPORT I='ERIOD ) ESTIMATED DATE OF STARTUF':

UNIT SHU'H3OWNS AND POWER REDUCTIONS DOOKEP NO. ~3D3 UNIT NAME ST LU IE T2 DATE >99R COMPLETED BY J. J. BREEN PEDEPNONE 6440 468A2 8 REPORT MONTH FEBR ARY 1 2 No. Date Type'uration Reasons Method of Licensee System Code'omponent Cause Sc Corrective (Hours) Shutting Event Report Codes Action to Down ¹ Prevent Recurrence Reactor 920212 0.0 B N/A Unit 2 held at approximately 85% power for waterbox cleaning.

920224 0.0 N/A HF XXXXXX Unit 2 held at approximately 85Fo power for waterbox cleaning.

F Forced Reason Method Exhibit G - Instructions for S Scheduled A - Equipment failure (explain) 1 - Manual Preparation of Data Entry B - Maintenance or Test 2 - Manual Scram Sheets Licensee Event Report C - Refueling 3 - Automatic Scram (LER) File (NUREG4161)

D - Regulatory restriction 4 - Continued E - Operator Training ds Liccnsc Examination 5 - Load Reduction F - Administrative 9 - Other (Explain) Exhibit 1 - Same Source G - Operational Error (Expalin)

H - Other (Explain)

SUMMARY

OF OPERATING EXPERIENCE DOCKET NO. 50-389 UNIT St. Lueie 2 DATE COMPLETED BY J.J. Breen TELEPHONE 407 468-4248 REPORT MONTH FEBRUARY 1992 Unit 2 reduced power from February 12, 1992, to February 14, 1992, and from February 24, 1992, to February 26, 1992, for waterbox cleaning. Unit 2's average daily power for the rest of the month was 100 percent.

In accordance with the requirements of Technical Specification 6.9.1.6, there were no challenges to the PORVs or safety valves during the report period.

t L"

k I

g7 E E 4'