Forwards Insp Repts 50-335/91-27 & 50-389/91-27 on 911223- 920127 & Notice of Violation.Nrc Concerned About Violation Since Formal Control of TS Re Equipment Fundamental to Ensuring Operator Knowledge of Plant Status
ML17227A326
Person / Time
Site: Saint Lucie  
Issue date: 02/25/1992
From: Sinkule M
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Goldberg J
FLORIDA POWER & LIGHT CO.
Shared Package
ML17227A327 List:
References
NUDOCS 9203100066
Download: ML17227A326 (3)


See also: IR 05000335/1991027

Text

Florida Power

5 Light Company

ATTN:

J.

H. Goldberg

President

- Nuclear Division

P. 0.

Box 14000

Juno

Beach,

Florida

33408-0420

Gentlemen:

SUBJECT:

NOTICE OF VIOLATION

(NRC INSPECTION

REPORT

NOS. 50-335/91-27

AND 50-389/91-27)

This refers

to the

inspection

conducted

by S.

A. Elrod of this office on

December

23,

1991 to January

27,

1992.

The inspection

included

a review of

activities authorized

for yo'ur St.

Lucie facility.

At the conclusion of the

inspection,

the

findings

were

discussed

with those

members

of your staff

identified in the enclosed

report.

Areas

examined

during

the inspection

are identified in the report.

Within

these

areas,

the inspection

consisted

of selective

examinations

of procedures

and

representative

records,

interviews

with personnel,

and observation

of

activities in progress.

The enclosed

Inspection

Report identifies activities that appeared

to violate

NRC requirements

that are not cited; therefore,

.a

response

to the non-cited

violations is not required.

While we are naturally concerned

about violations,

these

are

not being

subject

to enforcement

action

because

your efforts in

identifying

and

correcting

two violations

met the criteria of enforcement

policy section

V.G.

and similar efforts, in correcting

one

NRC identified

violation met the criteria of enforcement policy section V.A.

Based

on the results

of this inspection,

certain of your activities

appeared

to be in violation of

NRC requirements,

as specified in the enclosed

Notice of

Violation (Notice).

We are

concerned

about

the violation because

formal

control

of technical

specification

related

equipment

is

fundamental

to

ensuring

operator

knowledge of plant conditions

and

expected

behavior

under

accident situations.

You are required to respond

to this letter

and should follow the instructions

specified

in the

enclosed

Notice

when

preparing

your response.

In your

response,

you should

document

the specific actions

taken

and

any additional

actions

you plan to prevent recurrence.

After reviewing your response

to this

Notice, including your proposed

corrective actions

and

the results

of future

inspections,

the

NRC will determine

whether further

NRC enforcement

action is

necessary

to ensure

compliance with

NRC regulatory requirements.

In accordance

with

10

CFR 2.790 of the

NRC's

"Rules of Practice,"

a copy of

this letter and its enclosures will be placed in the

NRC Public Document

Room.

9203i00066

920225

PDR

ADOCK 05000335

~Q

PDR

Florida Power

& Light Company

FE9 ~~ 1992

The responses

directed

by this letter

and the enclosed

Notice are not subject

to the clearance

procedures

of the Office of Management

and Budget

as required

by the Paperwork

Reduction act of 1980,

Pub.

L. No. 96.511.

Should you have

any questions

concerning this letter,

please

contact us.

Sincerely,

Original signed

by

Paul

E. Fr~drgc)soo

Ifo~)

Reactor Projects

Branch

2

Division of Reactor Projects

Enclosures:

1. Notice of Violation

2.

NRC Inspection

Report

cc w/encls:

D. A. Sager,

Vice President

St. Lucie Nuclear Plant

P. 0.

Box 128

Ft. Pierce,

FL

34954-0128

R.

E. Grazio, Director

Nuclear Licensing

Florida Power

and Light Co.

P. 0.

Box 14000

Juno

Beach,

FL

33408-0420

G. J. Boissy, Plant Manager

St. Lucie Nuclear Plant

P. 0.

Box 128

Ft. Pierce,

FL

34954-0128

Harold F. Reis,

Esq.

Newman

& Holtzinger

1615

L Street,

NW

Washington,

D. C.

20036

John T. Butler, Esq.

Steel,

Hector and Davis

400 Southeast

Financial

Center

Miami,

FL

33131-2398

Jacob

Daniel

Nash

Office of Radiation Control

Department of Health

and

Rehabilitative Services

1317 Winewood Boulevard

Tallahassee,

FL

32399-0700

cc w/encls cont'd:

See

page

3

Florida Power

8 Light Company

FEe 2~ 199

cc w/encls cont'd:

Administrator

Department of Environmental

Regulation

Power Plant Siting Section

State of Florida

2600 Blair Stone

Road

Tallahassee,

FL

32301

Jack Shreve

.

Public Counsel

Office of the Public Counsel

c/o The Florida Legislature

111 West Madision Ave.,

Room 812

Tallahassee,

FL

32399-1400

Robert

G. Nave, Director

Emergency

Management

Department of Community Affairs

2740 Centerview Drive

Tallahassee,

FL

32399-2100

James

V. Chisholm

County Administrator

St. Lucie County

2300 Virginia Avenue,

Fort Pierce,

FL

34982

Charles

B. Brinkman

Washington Nuclear Operations

ABB Combustion Engineering,

Inc.

12300 Twinbrook Parkway, Suite

330

Rockville,

MD

20852

State of Florida

bcc w/encl:

J.

Johnson,

RII

K. Landis, RII

J. Norris,

NRR

Document Control

Desk

NRC Resident

Inspector

U.S.

Nuclear Regulatory

Commission

7585 South

Highway A1A

Jensen

Beach,

FL

33457

RII:DRP

COqle

02j>>/92

RII:

P

KLa

is

02/5, /92