ML17227A307
| ML17227A307 | |
| Person / Time | |
|---|---|
| Site: | Saint Lucie |
| Issue date: | 02/21/1992 |
| From: | Sager D FLORIDA POWER & LIGHT CO. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| GL-91-11, TAC-M82460, TAC-M82461, NUDOCS 9202280137 | |
| Download: ML17227A307 (3) | |
Text
ACCELERATED DISTRIBUTION DEMONS TION SYSTEM REGULAT(
INFORMATION DISTRIBUTION YSTEM (RIDS)
ACCESSION"NBR:9202280137 DOC.DATE: 92/02/21 NOTARIZED:
NO FACIL:50-335 St. Lucie Plant, Unit 1, Florida Power 6 Light Co.
50-389 St. Lucie Plant, Unit 2, Florida Power a Light Co.
AUTH.NAME AUTHOR AFFILIATION SAGER,D.A.
Florida Power a Light Co.
RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)
DOCKET 05000335 05000389
SUBJECT:
Informs that procedure changes identified in 920128 response to recommendations in Generic Ltr 91-11 completed.
DISTRIBUTION CODE:
AG27D COPIES RECEIVED:LTR g ENCL ~
SIZE:
TITLE: Generic Ltr 91-11 Resolutions of Generic Issues 48 6
49 NOTES:
RECIPIENT ID CODE/NAME PD2-2 LA NORRIS,J COPIES LTTR ENCL 1
2 RECIPIENT ID CODE/NAME PD2-2 PD COPIES LTTR ENCL INTERNAL: ACRS NRR HOFFMANiS NRR/DOEA/OTSB11 NRR/DST/SELB 7E NRR/DST/SRXB 8E OC+>FSS RR ~
.Ol EXTERNAL: NRC PDR 6
1 1
1 1
1 1
1 NRR CHOPRA,O NRR/DET/ESGB NRR/DST 8E2 NRR/DST/SICB8H7 NUDOCS-ABSTRACT OGC/HDS3 RES/DSIR/EIB NSIC NOTE TO ALL"RIDS" RECIPIENTS:
PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENT CONTROL DESK.
ROOM P 1-37 (EXT. 20079) TO ELIMINATEYOUR NAME FROM DIFIRIBUTION LISTS FOR DOCUMENTS YOU DON'T NEED!
TOTAL NUMBER OF COPIES REQUIRED:
LTTR 25 ENCL
P.O. Box 128, Ft. Pierce, FL 349544128 February 21, 1992 L-92-39 10 CFR 50.4 U.
S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.
C.
20555 Gentlemen:
RE:
St. Lucie Units 1 and 2
Docket Nos.
50-335 and 50-389 NRC TAC NO. M82460
& M82461 Generic Letter 91-11 On January 28, 1992, Florida Power and Light Company (FPL) letter L-92-8 provided a response to Generic Letter 91-11.
The response stated that the procedure changes to implement the recommendations of Generic Letter 91-11 would be completed by March 31,
- 1992, By letter (J. A. Norris to J.
G. Goldberg) dated February 2, 1992, the NRC requested FPL to notify the staff when the procedures were in place.
The purpose of this letter is to inform the NRC that the procedure changes identified in our response of January 28, 1992 have been completed.
Please contact us if there are any questions about this submittal.
Very truly yours, D. A.
ger Vice r sident St Lu ie Plant DAS/GRM/kw cc:
Stewart D. Ebneter, Regional Administrator, Region II, USNRC Senior Resident Inspector, USNRC, St. Lucie Plant DAS/PSL 8626-92 9202280137 92022i PDR, ADOCK 05000335 P
0 C