A1AR 26
1991
Docket Nos.
50-335,
50-389
License
Nos.
Florida Power and Light Company
ATTN: =Mr. J.
H. Goldberg
President - Nuclear
P.
0.
Box 14000
Juno
Beach,
FL
33408-0420
Gentlemen:
SUBJECT:
NRC INSPECTION
REPORT
NOS.
50-335/91-05
AND 50-389/91"05
This refers to the Nuclear Regulatory
Commission's
(NRC) inspection of your
Fitness
For
Duty
Program,
required
by
10
CFR Part'6,
conducted
by
William Tobin,
Region II, on February 26-28,
1991.
At the co'nclusion of the
inspection,
the results
were discussed
at an exit me'eting with those
members of
your staff identified in the enclosed
inspection report.
The inspection
consisted
of selective
examination of your Drug and Alcohol
Abuse, Policy, corporate
and site
implementation
procedures,
chemical testing
program,
interviews
with
employees
and contractors,
observation
of your
Collection and Medical
Fa'ci lities and review of .pertinent records
and reports.
Within the
scope
of the
inspection,
violations
or deviations
were
not
identified.
As described
in the enclosed
Report,
we are pleased
to note several
strengths
in your Fitness
For Duty (FFD) Program;
more stringent cutoff levels for some
dr ugs,
the professionalism
of your
FFD Corporate
and Site staff,
FFD training,
and the availability of a full-time Medical
Review Officer.,
One Inspector
Followup Item is worthy of your attention.
Your FFD staff has
identified
one
issue
relative to the infrequency of conducting
random
drug
testing
on weekends.
Based
upon
comments
at the Exit Meeting
we understand
that you will be testing
more frequently
on weekends
such that employees
and
contractors will be eligible for unannounced
random testing at any time.
In accordance
with 10 CFR 2.790 of the
NRC's "Rule of Practice",
a copy of
this letter and its enclosure will be placed in the
NRC Public Document
Room.
Pi04li02i4 910326
Por'DOCt;
0.-;.000=-'-
9
r g-O/
I
l3
Fl ori da
Power
and Light Company
MAR 26 Ss)
Should you have. any questions
concerning this letter, please
contact us.
Sincerely,
Enclosure:
NRC Inspection
Report
William E. Cline, Chief
Nuclear Materials Safety
and
Safeguards
Branch
Division of Radiation Safety
and Safeguards
cc w/encl:
D. A. Sager,
Vice President
St. Lucie Nuclear Plant
P. 0.
Box '128
-0128
Ft. Pierce,
FL
34954
G. J. Boissy, Plant Manager
St. Lucie Nuclear Plant
P. 0.
Box 128
Ft. Pierce,
FL
34954-0128
Harold F. Reis,
Esq.
Newman
& Holtzinger
1615
L Street,
NW
D.
C.
20036
John T. Butler, Esq.
Steel,
Hector and Davis
,
400 Southeast
Financial
Center
Niami,
FL
33131-2398
Jacob
Daniel
Nash
Office of Radiation Control
Department of Health
and'ehabilitative
Services
1317 Winewood Boulevard
~
Tallahassee,
FL
. 32399-0
00
(cc w/encl cont'd - See
page
3)
Florida Power and Light Company
MAR 88 ~~
(cc w/encl cont'd)
Administrator
Department of Environmental
Regulation
Power Plant Siting Section
State of Florida
Twin Towers
2600 Blair Stone
Road
Tallahssee,
FL
32301
Jack
Shreve
Office of the Public Counsel
Room 4, Holland Building
Tallahassee,
FL
32304
State
Planning
and Development
Clearinghouse
'ffice
of Planning
and Budget
Executive Office of the Governor
The Capitol Building
Tallahassee,
FL
32301
James
V. Chisholm
County Administrator
St. Lucie County
2300 Virginia Avenue,
Room $04
Fort Pierce,
FL
34982
Charles
B. Brinkman
Nuclear Operations
Combustion Engineering,
Inc.
12300 Twinbrook Parkway, Suite
3300
Rockville,
YiD
20852
State of Florida
bcc w/encl:
J. Crlenjak, RII
J. Norris,
Document Control
Desk
NRC Resident
Inspector
DRP Section Chief
RII: DRSS 'II: DRSS
- DThompson:ser
. *WTobin
03/
/91
03/
/91
'DRSS
- Dt1cGuire
03+3 /91
RII: DRP
- RCr 1enjak
03/
/91
- SEE
PREVIOUS
PAGE
FOR
CONCURRENCES
Florida Power and Light Company
!SAR 26 lggl
(cc w/Inspection
Summary cont'd)
Administrator
Department of Environmental
Regulation
Power Plant Si'ting Section
State of Florida
Twin Towers
2600 Blair Stone
Road
Tallahssee,
FL
32301
Jack Shreve
Office of the Public Counsel
Room 4, Holland Building
Tallahassee,
FL
32304
State Planning
and Development
Clearinghouse
Office of Planning
and Budget
Executive Office of the Governor
The Capitol Building
Tallahassee,
FL
32301
James
V. Chisholm
County Administrator
St.
Lucie County
2300 Virginia Avenue,
Room 104
Fort Pierce,
FL
34982
Charles
B. Brinkman
Mashington Nuclear Operati
ns
Combustion Engineering, inc.
12300 Twinbrook Parkway Suite 3300
Rockville,
20852
.
State of Florida
bcc w/encl:
NRR/OR IS/SB
bcc w/Insp
tion Summary:
J.
Crlen
k, RII
J. Norr',
Docu
nt Control
Desk (RIDS IE04), 016
N
Resident
Inspector
P Section Chief
RII:DRSS
g7yit
DThompson:
er
.
03/A/91
RII:DRSS
03/gP/91
R
D
're
03/ZO/91
RI
D
03/gy'91
1