June
21,
1990
Docket Nos.
50-335,
50-389
License
Nos.
Florida Power
and Light Company
ATTN:
Mr. J.
H. Goldberg
President - Nuclear
P.
O.
Box 14000
Juno
Beach,
FL
33408-0420
Gentlemen:
SUBJECT:
(NRC INSPECTION
REPORT
NOS. 50-335/90-09
AND 50-389/90-09)
This refers to the Nuclear Regulatory
Commission
(NRC) inspection
conducted
by
B. Breslau
on April 23 - May 11,
1990.
The inspection
included
a review of
activities authorized
for your St.
Lucie facility.
At the conclusion
of the
inspection,
the
findings
were
discussed
with those
members
of your staff
identified in the enclosed
Inspection
Report.
The Operational
Safety
Team Inspection
(OSTI) evaluated
your current level of
performance
in the
area
of plant operations.
The
inspection
included
an
assessment
of Operations
and the effectiveness
of support provided to Operations
by various plant groups including Surveillance/IST/Calibration,
Administrative
Controls
and Engineering
Support.
Management
awareness
of, involvement in, and
support of plant safety
was also evaluated.
The OSTI was
a performance
based
team assessment
which focused
on identifying significant operational
strengths
and weaknesses
which may exist at your facility.
These
strengths
and weaknesses
are
summarized
in the results
section of the report
on page
2.
The weaknesses
noted in the areas
of control
room tagging,
operator'response
to annunciators,
housekeeping,
control of transient
combustibles,
conduct of surveillances
and
access
to the area
around the control boards warrant your attention.
t
During the course of the inspection,
certain activities were noted which appeared
to violate
NRC requirements.
The violation, references
to pertinent requirements,
and
elements
to
be included
in your response
are
described
in <he
enclosed
Notice
of Violation.
Unresolved
items
were
also
identified
during
the
inspection
which will be pursued during future inspections.
In accordance
with Section
2.790
of the
NRC's
"Rule's of Practice,"
Part 2,
Title 10,
Code of Federal
Regulations,
a copy of this leter and its enclosures
will be placed in the
NRC Public Document
Room.
The response
directed
by this letter
and its enclosures
are not subject to the
clearance
procedures
of the Office of Management
and Budget
as required
by the
Paperwork Reduction Act of 1980,
Pub.
L. No.96-511.
Florida'ower
and Light Company
June
21,
1990
Should you have
any questions
concerning this letter, 'please
contact
us.
Sincerely,
(ORIGINAL SIGNED BY E.
MERSCHOFF)
Enclosures:
1.
2.
NRC Inspection
Report
cc w/encls:
D. A. Sager,
Vice President
St.
Lucie Nuclear Plant
P.
O.
Box 128
,Ft. Pierce,
FL
34954-0128
G. J. Boissy, Plant Manager
St.
Lucie Nuclear Plant
P.
O.
Box 128
Ft. Pierce,
FL
34954-0128
Harold F. Reis,
Esq.
Newman
8 Holtzinger
1615
L Street,
NW
D.
C.
20036
John
T. Butler,
Esq.
Steel,
Hector and Davis
400 Southeast
Financial
Center
Miami, FL
33131-2398
Jacob'Daniel
Nash
Office of Radiation Control
Department of Health
and
Rehabilitative Services
1317 Winewood Boulevard
Tallahassee,
FL
32399-0700
Administrator
Department of Environmental
Regulation
Power Plant Siting Section
State of Florida
Twin Towers
2600 Blair Stone
Road
Tallahassee,
FL
32301
(cc w/encls cont'd - See
page
2)
El li s
W. Mer'scho ff, Acting Director
Division of Reactor Safety
Florida Power
and Light Company
June
21,
1990
(cc w/encls cont'd)
Jack Shreve
Office of the Public Counsel
Room 4, Holland Building
Tallahassee,
FL
32304
State
Planning
and Development
Clearinghouse
Office of Planning
and Budget
Executive Office of the Governor
The Capitol'Building
Tallahassee,
FL
32301
James
V. Chisholm
County Administrator
St.
Lucie County
2300 Virginia Avenue,
Room
104
Fort Pierce,
FL
34982
Charles
B. Brinkman
Nuclear
Operations
Combustion Engineering,
Inc.
12300 Twinbrook Parkway,
Suite
330
Rockville,
20852
K.
E. Perkins,
NRR/LOLB
State of Florida
bcc
/encls:
cument Control
Desk
.NRC Resident
Inspector
U.S..Nuclear
Regulatory
Commission
7585 South Highway AlA
Jensen
Beach,
FL
33457
RI I": DRS
BBreslau
06//1/90
06/~g/90
RII: DRS
LNdllen
06//$ /90
RII:DRP
06/if /90
RIII
RII:
06//p'9g
06/j / /90
RII:DRP
RCyg:enj/k
06/
/90
RII:DRP
iiwVS
MSi nkul e
06@ /90
RII: EICS
.I
GJ
ki'ns
0 /
/90
R
RS
rschoff
06~//90
r
('