Forwards Insp Repts 50-335/90-09 & 50-389/90-09 on 900423-0511 & Notice of Violation.Weaknesses Noted in Areas of Control Room Tagging,Operator Response to Annunciators, Housekeeping & Control of Transient Combustibles
ML17223A829
Person / Time
Site: Saint Lucie  NextEra Energy icon.png
Issue date: 06/21/1990
From: Merschoff E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Goldberg J
FLORIDA POWER & LIGHT CO.
Shared Package
ML17223A830 List:
References
NUDOCS 9006290008
Download: ML17223A829 (5)


See also: IR 05000335/1990009

Text

June

21,

1990

Docket Nos.

50-335,

50-389

License

Nos.

DPR-67,

NPF-16

Florida Power

and Light Company

ATTN:

Mr. J.

H. Goldberg

President - Nuclear

P.

O.

Box 14000

Juno

Beach,

FL

33408-0420

Gentlemen:

SUBJECT:

NOTICE OF VIOLATION

(NRC INSPECTION

REPORT

NOS. 50-335/90-09

AND 50-389/90-09)

This refers to the Nuclear Regulatory

Commission

(NRC) inspection

conducted

by

B. Breslau

on April 23 - May 11,

1990.

The inspection

included

a review of

activities authorized

for your St.

Lucie facility.

At the conclusion

of the

inspection,

the

findings

were

discussed

with those

members

of your staff

identified in the enclosed

Inspection

Report.

The Operational

Safety

Team Inspection

(OSTI) evaluated

your current level of

performance

in the

area

of plant operations.

The

inspection

included

an

assessment

of Operations

and the effectiveness

of support provided to Operations

by various plant groups including Surveillance/IST/Calibration,

Administrative

Controls

and Engineering

Support.

Management

awareness

of, involvement in, and

support of plant safety

was also evaluated.

The OSTI was

a performance

based

team assessment

which focused

on identifying significant operational

strengths

and weaknesses

which may exist at your facility.

These

strengths

and weaknesses

are

summarized

in the results

section of the report

on page

2.

The weaknesses

noted in the areas

of control

room tagging,

operator'response

to annunciators,

housekeeping,

control of transient

combustibles,

conduct of surveillances

and

access

to the area

around the control boards warrant your attention.

t

During the course of the inspection,

certain activities were noted which appeared

to violate

NRC requirements.

The violation, references

to pertinent requirements,

and

elements

to

be included

in your response

are

described

in <he

enclosed

Notice

of Violation.

Unresolved

items

were

also

identified

during

the

inspection

which will be pursued during future inspections.

In accordance

with Section

2.790

of the

NRC's

"Rule's of Practice,"

Part 2,

Title 10,

Code of Federal

Regulations,

a copy of this leter and its enclosures

will be placed in the

NRC Public Document

Room.

The response

directed

by this letter

and its enclosures

are not subject to the

clearance

procedures

of the Office of Management

and Budget

as required

by the

Paperwork Reduction Act of 1980,

Pub.

L. No.96-511.

Florida'ower

and Light Company

June

21,

1990

Should you have

any questions

concerning this letter, 'please

contact

us.

Sincerely,

(ORIGINAL SIGNED BY E.

MERSCHOFF)

Enclosures:

1.

Notice of Violation

2.

NRC Inspection

Report

cc w/encls:

D. A. Sager,

Vice President

St.

Lucie Nuclear Plant

P.

O.

Box 128

,Ft. Pierce,

FL

34954-0128

G. J. Boissy, Plant Manager

St.

Lucie Nuclear Plant

P.

O.

Box 128

Ft. Pierce,

FL

34954-0128

Harold F. Reis,

Esq.

Newman

8 Holtzinger

1615

L Street,

NW

Washington,

D.

C.

20036

John

T. Butler,

Esq.

Steel,

Hector and Davis

400 Southeast

Financial

Center

Miami, FL

33131-2398

Jacob'Daniel

Nash

Office of Radiation Control

Department of Health

and

Rehabilitative Services

1317 Winewood Boulevard

Tallahassee,

FL

32399-0700

Administrator

Department of Environmental

Regulation

Power Plant Siting Section

State of Florida

Twin Towers

2600 Blair Stone

Road

Tallahassee,

FL

32301

(cc w/encls cont'd - See

page

2)

El li s

W. Mer'scho ff, Acting Director

Division of Reactor Safety

Florida Power

and Light Company

June

21,

1990

(cc w/encls cont'd)

Jack Shreve

Office of the Public Counsel

Room 4, Holland Building

Tallahassee,

FL

32304

State

Planning

and Development

Clearinghouse

Office of Planning

and Budget

Executive Office of the Governor

The Capitol'Building

Tallahassee,

FL

32301

James

V. Chisholm

County Administrator

St.

Lucie County

2300 Virginia Avenue,

Room

104

Fort Pierce,

FL

34982

Charles

B. Brinkman

Washington

Nuclear

Operations

Combustion Engineering,

Inc.

12300 Twinbrook Parkway,

Suite

330

Rockville,

MD

20852

K.

E. Perkins,

NRR/LOLB

State of Florida

bcc

/encls:

cument Control

Desk

.NRC Resident

Inspector

U.S..Nuclear

Regulatory

Commission

7585 South Highway AlA

Jensen

Beach,

FL

33457

RI I": DRS

BBreslau

06//1/90

06/~g/90

RII: DRS

LNdllen

06//$ /90

RII:DRP

06/if /90

RIII

RII:

06//p'9g

06/j / /90

RII:DRP

RCyg:enj/k

06/

/90

RII:DRP

iiwVS

MSi nkul e

06@ /90

RII: EICS

.I

GJ

ki'ns

0 /

/90

R

RS

rschoff

06~//90

r

('