Nay 18, 1990 Docket Nos.
50-335 and 50-389 Nr. J.
H. Goldberg Executive Vice President Florida Power and Light Company Post Office Box 14000 Juno Beach, Florida 33408-0420
Dear Nr. Goldberg:
SUBJECT:
NRC BULLETIN 88-10; NONCONFORMING MOLDED-CASE CIRCUIT BREAKERS-ST.
LUCIE 1 AND 2 - TAC NOS.
71358 AND 71359 By letters dated April 3, 1989 and Nay 8, 1990, the Florida Power 5 Light Company (FPSL) responded to Bulletin 88-10 for St. Lucie Plant, Units 1 and 2.
In the responses, FPSL confirmed that activities required to address the issue of substandard molded-case circuit breakers discussed in Bulletin 88-10 (with the exception of two items listed on Attachment 1 to the Nay 8, 1990 letter) have been performed.
The remaining two items will be performed in the fall of 1990.
The staff finds this schedule acceptable.
A detailed technical review of the FPSL responses has not been performed;
- however, the issue may be subject to inspection at a later date.
If a subsequent inspection identifies deficiencies in the FP8L actions and responses, this issue will be reopened.-
Presently, we consider this action complete and, accordingly, we are closing TAC Nos.
71358 and 71359.
S incere ly, Original Signed By Jan A. Norris, Sr. Project Manager Project Directorate II-2 Division of Reactor Projects-I/II Office of Nuclear Reactor Regulation cc:
See next page DISTRIBUTION:
- ~k-F-.
NRC 8 Local PDRs PD22 Rdg. File SVarga GLainas DMi1 1 er JNorris ACRS (10)
HBerkow NSinkule, RII OGC EJordan JStone OFC:
A DII-NAME:D
- PM:
- J o
is.
1
- D:P
~
wo
.H erk
~0 WW WW OWWWWWWWWW SOW WWWWWWW I
WWWWO DATE
- 5/
90 5/ II/90
- 5/ C/90 OFFICIAL RECORD COPY Doc>>ment Name:
LETTER45
>00>230183 90Owie PDR ADOCK 05000 3~
p8c~
OI~~
iIo
0
~
~
r I
4 K
4
')4
Mr. J.
H. Goldberg Florida Power 5 Light Company St. Lucie Plant CC:
Mr. Jack Shreve Office of the Public Counsel Room 4, Holland Building Tallahassee, Florida 32304 Senior Resident Inspector St. Lucie Plant U.S. Nuclear Regulatory Commission 7585 S.
Hwy AIA Jensen Beach, Florida 33457 State Planning 5 Development Clearinghouse Office of Planning 5 Budget Executive Office of the Governor The Capitol Bui lding Tallahassee, Florida 32301 Harold F. Reis, Esq.
Newman 5 Holtzinger 1615 L Street, N.W.
Washington, DC 20036 John T. Butler, Esq.
- Steel, Hector and Davis 4000 Southeast Financial Center Miami, Florida 33131-2398 Administrator Department of Environmental Regulation Power Plant Siting Section State of Florida 2600 Blair Stone Road Tallahassee, Florida 32301 Mr. Weldon B. Lewis, County Administrator St. Lucie County 2300 Virginia Avenue, Room 104 Fort Pierce, Florida 33450 Mr. Charles B. Brinkman, Manager Washington Nuclear Operations Combustion Engineering, Inc.
12300 Twinbrook Parkway, Suite 330 Roc kvi 1 1 e, Maryland 20852 Mr. Jacob Daniel Nash Office of Radiation Control Department of Health and Rehabilitative Services 1317 Winewood Blvd.
Tallahassee, Florida 32399-0700 Regional Administrator, Region II U.S. Nuclear Regulatory Commission 101 Marietta Street N.W., Suite 2900 Atlanta, Georgia 30323