Partially Withheld Requalification Exam Rept 50-335/OL-90-01 (Ref 10CFR2.790(a)) on 900403 for Both Units.Exam Results: All Candidates Passed Retake Exams
ML17223A650
Person / Time
Site: Saint Lucie  
Issue date: 04/19/1990
From: Casto C, Moorman J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To:
Shared Package
ML17223A649 List:
References
50-335-OL-90-01, 50-335-OL-90-1, NUDOCS 9005170016
Download: ML17223A650 (3)


Text

~p,8 RECT, (4

fp0

'y I

n C

0 0**~0 t

UNITEDSTATES NUCLEAR REGULATORY COMMISSION REGION II 101 MARIETTASTREET, N.W.

ATLANTA,GEORGIA 30323 ENCLOSURE 1

ENMI NATION REPORT 50-335/OL-90-01 Facility License:

Florida Power and Light Company P. 0.

Box 14000 Juno Beach, FL 33408-0420 Facility Docket Nos.:

50-335, 50-389 Facility License Nos.:

DPR-67, NPF-16 Requalification retake examinations were administered at the St. Lucie Plant near Jensen Beach, Florida.

Chief Examiner:

ames

oorman, f,lq. <o ate Signe Approved By:

/7 Charles C

to, Chief Operator Licensing Section 2

o D te Signed Summary:

Examinations were administered on April 3, 1990.

Requalification simulator retake examinations were administered to two Senior Reactor Operators.

All individuals passed these retake examinations.

9v05170016 900419 PDR ADOCK 05000335 V

PEIC

REPORT DETAILS 1.

Facility Employees Attending Exit Meeting:

C. Burton, Operations Supervisor M. Shepherd, Operator Training Supervisor J. Spodick, Licensed Training Coordinator L. Heffelfinger, Licensed Operator Requalification Lead Instructor P. Fincher, Training Superintendent 2.

Examiners:

  • J. H. Moorman, III, Region II L. L. Lawyer, Region II
  • Chief Examiner 3.

Exit Meeting At the conclusion of the site visit the examiners met with representatives of the plant staff to discuss the results of the examination.

Team communication skills were noted as an area for improvement.

The licensee did not identify as proprietary any of the material provided to or reviewed by the examiners.

ENCLOSURE 3 SIMULATION FACILITY FIDELITY REPORT Facility Licensee:

Florida Power and Light Company Facility. Docket Nos.:

50-335 and 50-389 Simulation Facility:

St. Lucie Plant Operating Tests Administered On:

April 3, 1990 This form is used only to report observations.

These observations do not constitute audit or inspection findings and are

not, without further verification and review, indicative of non-compliance with 10 CFR 55.45(b).

These observations do not affect NRC certification or approval to the simulation facility other than to provide information which may be used in future evaluations.

No licensee action is required in response to these observations.

During the conduct of the simulator portion of the operating

tests, the following items were observed:

A scenario involving a

feedline break upstream of the "A" feed line check valve was used.

The affected steam generator level continued to slowly decrease with the steam generator isolated.

Also in this