ML17223A560

From kanterella
Jump to navigation Jump to search
Forwards Requalification Exam Rept 50-335/OL-89-02 on 891113-27.Requalification Program Satisfactory
ML17223A560
Person / Time
Site: Saint Lucie  
Issue date: 01/24/1990
From: Peebles T
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Woody C
FLORIDA POWER & LIGHT CO.
Shared Package
ML17223A561 List:
References
NUDOCS 9003200304
Download: ML17223A560 (4)


Text

January 24, 1990 Florida Power and Light Company ATTN:

Mr. C. 0.

Moody Senior Vice President - Nuclear P. 0.

Box 1400 Juno

Beach, FL 33408 Gentlemen:

SUBJECT:

ST.

LUCIE REQUALIFICATION EXAMINATION REPORT 335/OL-89-02 The NRC administered examinations during the weeks of November 13 - 27, 1989, to employees of your company who currently hold licenses to operate the St.

Lucie facility.

At the conclusion of the site visit, preliminary findings were discussed with those members of your staff identified in the Examination

Report, Enclosure 1.

A table summarizing the examination results for each examined individual is provided in Enclosure 2.

Comments made by your training staff concerning the validity of some questions in the written examinations are contained in Enclosure 3.

Copies of the written examinations and answer keys are included in this report as Enclosure 4.

A requalification program evaluation report is included as Enclosure 5.

This evaluation repot t finds that the St.

Lucie requalification program remains satisfactory.

Your attention is invited to information in the examination and evaluation reports which describe our concern over operator performance and exam administration.

These concerns were discussed at a management meeting held at the NRC Region II Office on December 22, 1989.

A Simulator Fidelity Report is provided in this report as Enclosure 6.

In accordance with 10 CFR 2.790(a),

a copy of this letter and Enclosures 1, 3, 4, 5, and 6 will be placed in the NRC's Public Document Room.

Enclosure 2 is exempt from public disclosure pursuant to 10 CFR 2.790(a) and will not be sent to the Public Document Room.

0" Should you have any questions concerning this letter, please contact us.

Sincer ely, (original signed by T. A. Peebles)

Thomas 'A. Peebles, Chief Operations Branch Division of Reactor Safety I

Enclosures:

(See page 2)

P'0032Q( l >()4 gQ( )g m4

@DOCK 0:(~age~>

r-Di."

0'

Florida Power and Light Company January 24, 1990

Enclosures:

1.

Examination Report No. 50-335/OL-89-02 2.

Requalification Results Summary Sheet (Official Use Only - Privacy Act Information) 3.

Facility Comments on Written Exam guestions 4.

RO/SRO WRitten Examinations and Answer Keys 5.

Requalification Program Evaluation 6.

Simulation Facility Fidelity Report cc w/encls 1, 2, 5, and 6:

P. McCullough, Corporate Training Manager G. Boissy, Plant Manager cc w/encls 1, 2, 3, 4, 5, and 6:

P. Fincher, Training Yianager cc w/encl 1:

State of Florida bcc w/encls 1, 3, 5, and 6:

J. Norris, NRR R. Crlenjak, DRP S. Elrod, St. Lucie Senior Resident Inspector J.

Moorman, DRS C. Casto, DRS bcc w/encls 1, 5, and 6:

Operator Licensing Branch, NRR bcc w/encls 1, 3, 4, 5, and 6:

~oeument<Contro T."..D6'j4-"'X

~ar mVA4~<ea A~

RII 1//3/90 RII RCrlenjak 1/

/90 RI

/

eebl es 1/gf/90