February 20, 1990 Docket Nos. 50-335, 50-389 License Nos.
DPR-67, NPF-16 Florida Power and Light Company ATTN:
Mr. J.
H. Goldberg Executive Vice President-Nuclear P. 0.
Box 14000 Juno
- Beach, FL 33408-0420 Gentlemen:
SUBJECT:
SUMMARY
OF MEETING HELD WITH FLORIDA POWER AND LIGHT (FP8IL)
TO DISCUSS FINDINGS DURING LICENSED OPERATOR REQUALIFICATION EXAMINATIONS A meeting was held at the NRC Region II office on December 22,
- 1989, to discuss the results of the recent licensed operator requalification examination.
Results of this examination are documented in NRC Examination Report No.
50-335/OL-89-02 dated January 24,, 1990.
The licensee described corrective actions taken and planned to correct deficiencies revealed by the examination.
A copy of slides used by the licensee is provided as Enclo'sure 1
and an attendance list is provided as Enclosure 2.
The licensee confirmed commitments made during the meeting in a letter from D. A. Sager to the NRC dated December 22, 1989.
Implementation of these commitments will be monitored during future inspections and licensed operator requalification examinations.
Sincerely, (Original signed by J. L. Milhoan for)
Stewart D. Ebneter Regional, Administrator
Enclosures:
1.
Copy of FP8L Slides 2.
Attendance List cc w/encls:
=
D. A. Sager, Vice President St. Lucie Nuclear Plant P. 0.
Box 128 Ft. Pierce, FL 33454 cc cont'd:
(See page 2) y003080375'033~
pDR ADGCK 050 V
Florida Power and Light Company February 20, 1990 (cc continued)
G. J. Boissy, Plant Manager St. Lucie Nuclear Plant P. 0.
Box 128 Ft. Pierce, FL 33454 J.
B. Harper Site gA Superintendent St. Lucie Nuclear Plant P. 0.
Box 128 Ft. Pierce, FL 33454 Harold F. Reis, Esq.
Newman 8 Holtzinger 1615 L Street, NW Washington, D. C.
20036 John T. Butler, Esq.
- Steel, Hector and Davis 400 Southeast Financial Center
- Miami, FL 33131-2398 Jacob Daniel Nash Office of Radiation Control Department of Health and Rehabilitative Services 1317 Winewood Boulevard Tallahassee, FL 32399-0700 Administrator Department of Environmental Regulation Power Plant Siting Section
- State of Florida Twin Towers 2600 Blair Stone Road Tallahassee, FL 32301 Jack Shreve Office of the Public Counsel Room 4, Holland Building Tallahassee, FL 32304 State Planning and Development Clearinghouse Office of Planning and Budget Executive Office of'he Governor The Capitol Buildling Tallahassee, FL 32301
Florida Power and Light Company February 20, 1990 Weldon B. Lewis County Administrator St. Lucie County 2300 Virginia Avenue, Room'04 Fort Pierce, FL 33450 Charles B. Brinkman Washington Nuclear Operations Combustion Engineering, Inc.
12300 Twinbrook Parkway, Suite 330 Rockville, MD 20852 State of Florida bcc w/encl:
Document Control Desk NRC Resident Inspector U.S. Nuclear Regulatory Commission 7585 South Highway AIA Jensen
- Beach, FL 33457 l
- SEE PREVIOUS CONCURRENCES
.*RII
- RII
- RII
- RII RI I JMoorman:sd 2/
/90 CCasto RCrlenjak TPeebles 2/
/90 2/
/90 2/
/90 AGibson 2/
/90 JMilhoan 2/g g/90
Florida Power and Light Company February 20, 1990 Weldon B. Lewis County Administrator St. Lucie C'ty 2300 Virginia Avenue, Room 104 Fort Pierce, F
33450 Charles B. Brinkm Washington Nuclear erations Combustion Engineeri
, Inc.
12300 Twinbrook Parkwa Suite 330 Rockville, ND 20852 State of Florida bcc w/encl".
Document Control Desk NRC Resident Inspector U.S. Nuclear Regulatory Commission 7585 South Highway A1A Jensen
- Beach, FL 33457
- SEE PREVIOUS CONCURRENCES
- RII
- RII.
- RII
- RII RII Jtloorman:sd CCasto 2/
/90 2/
/90 RCrl enjak TPeebl es 2/
/90 2/
/90 2/($
90 JMilhoan 2/
/90
Florida Power and Light Company
=(cc continued)
Charles B. Brinkman Washington Nuclear Operations Combustion Engineering, Inc.
12300 Twinbrwok Parkway, Suite 330 Rockville, MD 20852 State of= Florida ~,
bcc w/encl:
Document Control Desk NRC Resident Inspector U.S. Nuclear Regulatory Co ssion 7585 South Highway A1A Jensen
- Beach, FL 33457 RII RI I J
o rman:sd CChsto 61/~ /90 MP//90 R yglnj~ak RII
/
T eebles
ENCLOSURE AGENDA J.H. Goldberg Executive Vice President.... ~..... Opening Remarks G.J. Boissy St. Lucie Plant Manager...........
Introductions
M.D. Shepherd Operations Training Supervisor....
Problem Analysis and Countermeasures G.J. Boissy............. ~........ Summary
REQUALIFICATION EXAMINATION STATIC SIMULATOR OTHER EOP'S Wp Og EOP-15 OPEN REFERENCE JOB PERFORMANCE MEASURE
~ INCONSISTENT IMPLEMENTATION STRATEGY RECOVERY ACTIONS
~ EXPECTATIONS NRC FPL
~ PRIOR CORRECTIVE ACTION DID NOT ACHIEVE DESIRED RESULTS
10 12 COMMANDAND CONTROL COMMANDAND CONTROL PROCEDURE USE COMMANDAND CONTROL COMMANDAND CONTROL COMMANDAND CONTROL COMMANDAND CONTROL COMMANDAND CONTROL PROCEDURE USE PROCEDURE USE BOARD MANIPULATION PROCEDURE USE BOARD MANIPULATION OPERATOR TASK PROCEDURE EOP-6 EOP-15 EOP-15 EOP-15 EOP-15
, EOP-3 EOP-4 EOP-4 EOP-15 EOP-15 PROBLEM ANALYSISBY TASK PROBLEM ANALYSISBY PROCEDURE
PERFORMANCE ANALYSIS TASK Ul LU G:
0Klll GlE X
Ul LU CL 0
CC:
LLI m
z b
~bC XZ I-QQZ 0
0 o
UlK DbLU b~
LUUl IE~
OD 0
0 PL.
CC Gl-G X
LU O2!
0 G:
Gl PROCEDURE 1
't I
1 IA 1
CL0 Lll C9 G.0 LU CL0 LU CI T
G.0 Lll
ROOT CAUSE ANALYSIS EOP-15 EOP-4 EOP EOP-5 EOP-6 EOP-.10 II II I
I PROBLEMS ACROSS MOST TASKS ROOT CAUSE
~
OPERATORS HAD NOT SEEN MULTI-EVENT ENTRY PRIOR TO EXAM
~
PROCEDURE STILL NEEDS IMPROVEMENT IN HUMANFACTORS 2!
Q.
dl tLl Ul N
OK LUKK O.
O O
Z 0
0o hl 0I-O CL Q
X ClK 0m MINOR PROBLEMS ROOT CAUSE
~ CHANGED EVALUATIONTECHNIQUE
A
COUNTERMEASURES EOP-15
- 1. Operator Tailboard sessions
- 2. Training and evaluation on multi-event scenarios
- 3. Improve procedure human factors
- 4. Independent Evaluation Tailboards ProcedUre Revision Training & Evaluation Dec Jan Feb Mar Apr 1989 1990
SUMMARY
~ MUCH WORK SINCE 1988
~ MANYCHANGES PROCEDURES
> SIMULATOR EXAMINATIONMETHODS
~ PAST AND CURRENT OVERALLPERFORMANCE SATISFACTORY
~ OPPORTUNITIES STILL EXIST
~ WE ARE COMMITTEDTO RESOLVE ALLCONCERNS AND TO HAVE PROPERLY TRAINEDAND COMPETENT OPERATORS
V PSL EMERGENCY OPERATING PROCEDuRES EOP 1...........
STANDARD POST TRIP ACTIONS EOP 1...........
REACTOR TRIP RECOVERY EOP 3...........
LOSS OF COOLANTACCIDENT EOP 4...........
STEAM GENERATOR TUBE RUPTURE EOP 5.
~.
~..
~
~
~.. EXCESS STEAM DEMAND EOP 6........... TOTAl LOSS OF FEEDWATER EOP 9...........
LOSS OF OFFSITE POWER EOP 10......;... STATION BLACKOUT EOP 15..........
FUNCTIONALRECOVERY
ENCLOSURE 2
ATTENDEES FLORIDA POWER AND LIGHT J. Goldberg, Executive Vice President G. Boissy, Plant Manager, St. Lucie P. Fincher, Training Superintendent P. McCullough, Manager-Nuclear.Training C. Burton, Operations Supervisor C. Madden, Principal Engineer M. Shepherd, Operations Training Supervisor J. Spodick, Licensed Operator Training Coordinator NUCLEAR REGULATORY COMMISSION S. Ebneter, Regional Administrator J. Milhoan, Deputy Regional Administrator C. Hehl, Deputy Director, Division of Reactor Projects (DRP)
E. Merschoff, Deputy Director, Division of Reactor Safety (DRS)
T. Peebles, Chief, Operations