Responds to NRC Bulletin 89-003 Re Potential Loss of Required Shutdown Margin During Refueling Operations.Reactor Staff Which Assists in Overseeing Refueling Operation Trained on Requirements of Fuel Loading Procedures
ML17223A475
Person / Time
Site: Saint Lucie  NextEra Energy icon.png
Issue date: 01/23/1990
From: Goldberg J
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
IEB-89-003, IEB-89-3, L-90-27, NUDOCS 9001300450
Download: ML17223A475 (4)


Text

ACCELERATEK) D UTION DEMONSIR44ON SYSTEM REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR:9001300450 DOC.DATE: 90/01/23 NOTARIZED: YES DOCKET FACIL:50-335 St. Lucie Plant, Unit 1, Florida Power & Light Co. 05000335 50-389 St. Lucie Plant, Unit 2, Florida Power & Light Co. 05000389 AUTH. NAME AUTHOR AFFILIATION GOLDBERG,J.H. Florida Power & Light Co.

RECIP. NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)

SUBJECT:

Responds to NRC Bulletin 89-003 re potential loss of required shutdown margin during refueling operations.

DISTRIBUTION CODE: IEZSD TITLE: Bulletin 89-03,Potential COPIES RECEIVED: LTR Loss of Requirec[

( ENCL i SIZE:

Shutdown Margin During Refu S NOTES:

RECIPIENT COPIES RECIPIENT COPIES A ID CODE/NAME LTTR ENCL ID CODE/NAME LTTR ENCL PD2-2 LA 1 0 PD2-2 PD 1 1 NORRIS,J 1 1 INTERNAL: AEOD/DOA 1 1 AEOD/DS P/TPAB 1 1 D

KOPP,LARRY 1 1 LABARGE, DAVE 1 1 NRR/DET/ECMB 9H 2 2 NRR/DET/EMEB9H3 1 1 NRR/DOEA/OEAB11 1 1 NRR/DOEA/OGCB11 1 1 NRR/DREP/PEPB9 D 1 1 NRR/DST 8E2 1 1 NRR/HERMAN /B 1 1 NRR/MCLELLAN,T 1 1 NRR/PMAS/I LRB12 1 1 NRR/ROOD,H 1 1 NRR/SELLERS, D '1 1 NUDOCS-ABSTRACT 1 1

~RE G-FX~~~ 1 1 RES/DSIR/EIB 1 1 RGN2 FILE 01 1 1 EXTERNAL: LPDR 1 1 NRC PDR 1 1 NSIC 1 1 R

D A

D D

NOIR TO ALL "RIDS" RECIPIENTS:

PLEASE HELP US TO REDUCE WASTE! CONTACT THE DOCUMENI'OWIROLDESK, ROOM Pl-37 (EXT. 20079) TO ELIMINA'IEYOUR NAME FROM DlSHUBIJIION LISIS FOR DOCUMENTS YOU DORT NEED!

TOTAL NUMBER OF COPIES REQUIRED: LTTR 26 ENCL 25

?.0. Box l4000. Juno B caen. il. 33408.0420 APL JANUARX 2 >

'-90-27 10 CFR 50-54(f)

U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.C. 20555 Gentlemen:

Re: St. Lucie Unit Nos. 1 and 2 Docket Nos. 50-335 and 50-389 NRC Bulletin 89-03 Potential Loss of Required Shutdown Mar in Durin Refuelin 0 erations On November 21, 1989, NRC issued Bulletin 89-03, "Potential Loss of Required Shutdown Margin During Refueling Operations", to alert licensees to the potential loss of required shutdown margin during movement and placement of highly reactive fuel during refueling operations.

In addition, the bulletin requested all licensees to review procedures and training to assure adequate shutdown margin is maintained during all refueling operations.

Florida Power & Light Company has completed the requested review for St. Lucie Units 1 and 2 and provides the attached.

Should there be any questions, please contact us.

Very truly yours, J.H. Goldberg Executive Vice President JHG/MSD/vmg Attachment cc: Stewart D. Ebneter, Regional Administrator, Region Senior Resident Inspector, USNRC, St. Lucie Plant II, USNRC 5'p ps p pp45p capp)2i pDR ADQCy p~~ppp~,

PGC 2EPW an FPl. Group company

'/i

ATTACHMENT ST. LUCIE UNITS 1 AND 2 RESPONSE TO BULLETIN 89-03 REQUESTED ACTION: 1.

Assure that any intermediate fuel assembl'y configuration (including control rods) intended to be used during refueling is identified and evaluated to maintain sufficient refueling boron concentration to result in a minimum shutdown margin of approximately 5%.

FPL RESPONSE Refueling boron concentration is maintained to result in a minimum shutdown margin of 5% for intermediate fuel or control element assembly (CEA) configurations. This is accomplished by the use of a Fuel Assembly Storage Table. This table is supplied on a cycle specific basis by the fuel vendor and assures that allowed intermediate locations are less reactive than the final core configuration.

REQUESTED ACTION: 2o Assure that fuel loading procedures only allow those intermediate fuel assembly configurations that do not violate the allowable shutdown margin and that these procedures are strictly adhered to.

FPL RESPONSE:

Compliance with operating procedures assures use of the Fuel Assembly Storage Table so that sufficient shutdown margin is maintained for intermediate fuel assembly configurations.

REQUESTED ACTION: 3 ~

Assure that the staff responsible for refueling operations is trained in the procedure recommended in Item 2 above and understands the potential consequences of violating these procedures. This training should include the fundamental aspects of criticality control with higher enriched fuel assemblies.

The St. Lucie Reactor Engineering Staff which assists in overseeing the refueling operation has received training on the requirements of fuel loading procedures which assure sufficient shutdown margin is maintained, and are aware of the consequences of violations to this procedure. In addition, criticality control with higher enriched fuel assemblies was discussed during this training.

STATE OF FLORIDA )

) ss.

COUNTY OF PALM BEACH )

J. H. Goldber being first duly sworn, deposes and says:

That he is Executive Vice President, of Florida Power and Light Company, the Licensee herein; That he has executed the foregoing document; that the statements made in this document are true and correct to the best of his knowledge, information and belief, and that he is authorized to execute the document on behalf of said Licensee.

J. H. Gold day of '~,

Subscribed and sworn to before me. this 199+.

NOTARY PUBLIC, in and for e County of Palm Reach, State of Florida Notary Putrli(, State cf Roriria Ny Commission Expires June 1, 1%3 My Commission expires soogog rsPJ rt0$ fkh'IIIIUtkhco rhc,