ML17223A294
| ML17223A294 | |
| Person / Time | |
|---|---|
| Site: | Saint Lucie |
| Issue date: | 08/17/1989 |
| From: | Sinkule M NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Woody C FLORIDA POWER & LIGHT CO. |
| Shared Package | |
| ML17223A295 | List: |
| References | |
| NUDOCS 8908250204 | |
| Download: ML17223A294 (3) | |
See also: IR 05000335/1989016
Text
'
gc Cp~RA7ED
D3!)~BUTION
DEMONSTRATION
SYSTEM
REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
ESSION NBR:8908250204
DOC.DATE: 89/08/17
NOTARIZED:
NO
CIL:50-335 St. Lucie Plant, Unit 1, Florida Power
& Light Co.
50-389 St. Lucie Plant, Unit 2, Florida Power
& Light Co.
AUTH.NAME
AUTHOR AFFILIATION
SINKULE,M.V.
Region 2, Ofc of the Director
RECIP.NAME
RECIPIENT AFFILIATION
WOODY,C.O.
Florida Power
& Light Co.
DOCKET
05000335
05000389
SUBJECT:
Forwards Insp Repts
50-335/89
16 &'0-389/89-16
on 890410-
0612
DISTRIBUTION CODE:
IE01D
COPIES
RECEIVED:LTR
ENCL
SIZE:
w
/
I
TITLE: General
(50 Dkt)-Insp Rept/Notice of Vio ation Response
NOTES:
RECIPIENT
ID CODE/NAME
PD2-2
INTERNAL: ACRS
AEOD/DEIIB
DEDRO
NRR SHANKMAN,S
NRR/DLPQ/PEB
NRR/DREP/EPB
10
NRR/PMAS/ILRB12
OE LIEBERMA~NJ
GN2
FILE
01
EXTERNAL: LPDR
COPIES
LTTR ENCL
1
1
2
2
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
RECIPIENT
ID CODE/NAME
NORRIS,J
AEOD/TPAD
LOIS,ERASMIA
NRR/DEST DIR
NRR/DOEA DIR 11
NRR/DREP/RPB
10
NUDOCS-ABSTRACT
OGC/HDS2
'RES MORISSEAU,D
NRC
COPIES
LTTR ENCL
1
1
1
1
1
1
1
1
1
1
,.1
1
2
2
1
1
1
1
1
1
1
1
h
h
TOTAL NUMBER OF COPIES
REQUIRED:
LTTR
26
ENCL
26
Qi
Docket Nos.
50-335,
50-389
License
Nos.
Florida Power
and Light Company
ATTN:
Hr. C. 0.
Woody, Acting
Senior Vice President - Nuclear
P. 0.
Box 14000
Juno
Beach,
FL
33408-0420
Gentlemen:
SUBJECT:
(NRC
INSPECTION
REPORT
NOS. 50-335/89-16
AND 50-389/89-16)
This refers
to the Nuclear Regulatory
Commission
(NRC) inspection
conducted
by
S.
A. Elrod
and
N.
A. Scott
on April
10 - June
12,
1989.
The inspection
included
a review of activities authorized for your St. Lucie facility.
At the
conclusion of the inspection,
the findings were discussed
with those
members of
your staff identified in the enclosed
inspection report.
Areas
examined
during the inspection
are identified in the report.
Within
these
areas,
the inspection consisted
of selective
examinations
of procedures
and
representative
records,
interviews
with personnel,
and observation
of
activities in progress.
The inspection
findings indicate that certain activities
appeared
to violate
NRC requirements.
The violation, references
to pertinent
requirements,
and
elements
to be included in your response
are described
in the enclosed
Notice
of Violation.
In accordance
with Section
2.790 of the
NRC's
"Rules of Practice",
Part 2,
Title
10,
Code
of
Federal
Regulations,
a
copy of this letter
and its
enclosure(s) will be placed in the
NRC Public Document
Room.
The responses
directed
by this letter and its enclosures
are not subject to the
clearance
procedures
of the Office of Management
and Budget
as required
by the
Paperwork
Reduction Act of 1980,
PL 96-511.
Should you have
any questions
concerning this letter, please',contact
us.
Sincerely,
Enclosures:
(See
page
2)
Narvin V. Sinkule, Chief
Reactor Projects
Branch
2
Division of Reactor Projects
8908250204
8@08g7
ADOCK 0500033'5
9
Enclosures:
1.
2.
NRC Inspection
Report
cc w/encls:
O. A. Sager,
Vice President
St. Lucie Nuclear Plant
G. J. Boissy, Plant Manager
J.
B. Harper, Site
gA Superintendent
State of Florida
bcc w/encls:
NRC Resident
Inspector
NRC Section Chief
NRC Project Engineer
Document Control
Desk
RI
PM dion
08$$ /89
RI
P
RC
pnjak
l
08/( /89