ML17223A270
| ML17223A270 | |
| Person / Time | |
|---|---|
| Site: | Saint Lucie |
| Issue date: | 07/31/1989 |
| From: | Sinkule M NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Woody C FLORIDA POWER & LIGHT CO. |
| Shared Package | |
| ML17223A271 | List: |
| References | |
| NUDOCS 8908170563 | |
| Download: ML17223A270 (4) | |
See also: IR 05000335/1989018
Text
gCCP~MTED
DlSTRIBUTION
DEMONSTRATION
SYSTEM
REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
I,'ACCESSION NBR;8908170563
DOC.DATE: 89/07/31
NOTARIZED: NO
FAC1L:50-335 St. Lucie Plant, Unit 1, Florida Power
& Light Co.
50-389 St. Lucie Plant, Unit 2, Florida Power
& Light'Co.
AUTH.NAME
AUTHOR AFFILIATION
SINKULE,M.V.
Region
2, Ofc of the Director,
RECIP.NAME
RECIPIENT AFFILIATION
WOODYiC.O.
Florida Power
& Light Co.
SUBJECT:
Forwards Insp Repts
50-335/89-18
& 50-389/89-18
on
890612-0710.No violations or deviations noted.
DISTRIBUTION CODE:
IE01D
COPIES
RECEIVED:LTR
I
ENCL L
SIZE:
TITLE: General
(50 Dkt)-Insp Rept/Notice of Violation Response
NOTES:
DOCKET ¹
05000335
05000389
RECIPIENT
ID CODE/NAME
PD2-2
PD'NTERNAL:
AEOD/DEIIB
DEDRO
NRR/DEST DIR
NRR/DOEA DIR 11
NRR/DREP/RPB
10
NUDOCS-ABSTRACT
OGC/HDS2
RES MORISSEAUiD
EXTERNAL: LPDR
COPIES
LTTR ENCL
1
1
2
2
1
1
1
1
1
1
1
1
2
2
1
1
1
1
1
1
1
1
1
1
RECIPIENT
ID CODE/NAME
NORRIS'iJ
AEOD/TPAD
NRR SHANKMAN,S
NRR/DLPQ/PEB
'RR/DREP/EPB
10
NRR/PMAS/ILRB12
O~L-I=EBB/MANiJ
REZM~MLP
0 2
RGN2
FILE
01
NRC PDR
COPIES
LTTR ENCL
1
1
1
1
1
1'
1
1
1
1
1
1
1
1
1
1
1
1
1
1
1
h
D
D
S
NOXE 'IO ALL RIDS" RECIPIENIS:
PLEASE HELP US 'IO REDUCE HASTE!
COHZACI'IHE DOCUMEN1'CONTROL DESK,
BDCN Pl-37
(EXT. 20079)
KO E1ZHQAXS YOUR NE FKH DISTBIBUTION
ZZSTS FOR DOCUMENIS YOU DOHiT NEED(
I
D
S
A
D
D
S
TOTAL NUMBER OF COPIES
REQUIRED:
LTTR
25
ENCL
25
'
Docket Nos. 50-335,
50-389
License
Nos.
Florida Power
and Light Company
ATTN:
Nr. C. 0. Woody, Acting
Senior. Vice President - Nuclear
P. 0.
Box 14000
Juno
Beach,
FL
33408-0420
Gentlemen:
SUBJECT:
NRC
INSPECTION
REPORT
NOS. 50-335/89-18
AND 50-389/89-18
This refers
to the Nuclear Regulatory
Commission
(NRC) inspection
conducted
by
S.
A. Elrod
and
M. A. Scott
on June
12 - July 10,
1989.
The inspection
included
a
review of activities
authorized
for your St.
Lucie facility.
At the
conclusion
of the
inspection,
the
findings
were
discussed
with
those
members of your staff identified in the enclosed
inspection report.
Areas
examined
during the inspection are=identified
in the report.
Within
these
areas,
the inspection
consisted
of selective
examinations
of procedures
and
representative
records,
interv-iews with personnel,
and observation
of
activities in progress.
Within the
scope
of the
inspection,
no violations
or deviations
were
identified.
Your, attention is invited to the unresolved
items identified in the inspection
report.
This matter will be pursued
during future inspections.
In accordance
with Section
2.790 of the
NRC's
"Rules of Practice",
Part =2,
Title 10,
Code of Federal-Regulations,
a copy of this letter and its enclosure
will be placed in the
NRC Public Document
Room.
Should you have
any questions
concerning this letter,
please
contact us.
Sincerely,
Original signed
by
Enclosure:
NRC Inspection
Report
cc w/encl:
(See
page
2)
Narvin V. Sinkule, Chief
Reactor Projects
Branch
2
Division of Reactor Projects
8908170563
89073>
ADOCK 05000335
G
PNU
zoo I
Florida Power
and Light Company
cc w/encl:
D. A. Sager,
Vice President
St.
Lucie Nuclear
Plant
G. J. Boissy, Plant Nanager
J.
B. Harper,
gA Superintendent
State of Florida
bcc w/encl:
NRC Resident
Inspector
Document Control
Desk
JUL
3 i 1S89
RLIWRP
Plead en:ser
07/ p/89
RCrl
nanak
i)
RII:DRP
MSinkule
07+//89