ML17222A698

From kanterella
Jump to navigation Jump to search
Advises That Util Detailed Engineering Schedule Supports ATWS Mod Implementation During 1990,approved by NRC 870917 & s.Util Will Meet W/Nrc on 890301 to Discuss Design Details
ML17222A698
Person / Time
Site: Saint Lucie  NextEra Energy icon.png
Issue date: 02/27/1989
From: Conway W
FLORIDA POWER & LIGHT CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
L-89-76, NUDOCS 8903060039
Download: ML17222A698 (5)


Text

~pc'CE~~TED DI~BU'HOA'EMONSTR+lOA'Y)TER REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR:8903060039 DOC.DATE: 89/02/27 NOTARIZED: NO FACIL:50-335 St. Lucie Plant, Unit 1, Florida Power

& Light. Co.

50-389 St. Lucie Plant, Unit 2, Florida Power

& Light Co.

AUTH.NAME AUTHOR AFFILIATION CONWAY,W.F.

Florida Power

& Light Co.

RECIP.NAME RECIPIENT AFFILIATION Document Control Branch (Document Control Desk)

SUBJECT:

Informs that util will meet,w/NRC to discuss design details re ATWS.

DISTRIBUTION CODE:

A055D COPIES RECEIVED:LTR ENCL g SIZE:

TITLE: OR/Licensing Submittal:

Salem ATWS Events GL-, 83-28 NOTES:

DOCKET 05000335 05000389 RECIPIENT ID CODE/NAME PD2-2 LA NORRIS,J INTERNAL: ACRS NRR

'LASHER,D NRR/DEST/ICSB 7

NRR/DLPQ/QAB 10 NUDOC TRACT G~

Ol EXTERNAL: LPDR NSIC COPIES LTTR ~EL 1

0 1

6 1

1 1

1 1

P'ECIPIENT ID CODE/NAME PD2-2 PD ARM/DAF/LFMB NRR/DEST/ESB 8D NRR/DEST/PSB 8D NRR/DOEA/GCB 11 OGC/HDS2 RES/DSIR/EIB NRC PDR COPIES LTTR ENCL 3

1 1

1 1

R I

NOTE 'IO ALL "RIDS" RECIPIENTS'LEASE HELP US K) REXXJCE HASTE CGPZACZ 'XHE DtXUMENZ CXÃIRDL DESKI RXM Pl-37 (EXT. 20079) m XZZM32QTE YOUR NME FKM DISTRZKITIGN LISTS FOR DOCE6ÃZS YOU DOlN'T NEEDf TOTAL NUMBER OF COPIES REQUIRED:

LTTR 25 ENCL

P ll II

'V ~

P.O. Box14000, Juno Beach, FL 33408-0420 FEBRUARY 2 7 1SGS L-89-76 10 CFR 50.62 U.

S. Nuclear Regulatory Commission Attn:

Document Control Desk Washington, D.

C.

20555 Gentlemen:

Re:

St. Lucie Units 1 and 2

Docket Nos.

50-335 and 50-389 Antici ated Transient Without Scram ATWS 10 CFR 50.62 By letters dated September 17,, 1987 (E. G. Tourigny to C. 0. Woody) and April 22, 1988 (E.

G.

Tourigny to W.

F.

Conway),

the NRC approved ATWS modification implementation dates for St. Lucie Units 1

and 2, respectively.

These letters approved a February 1990 implementation for St. Lucie Unit 1'(the fourth outage after July 24, 1984) and Fall 1990 implementation for St. Lucie Unit 2 (the fifth outage after July 24, 1984).

Florida Power

& Light Company's (FPL) detailed engineering schedule supports modification implementation during these outages.

FPL will be meeting with the Staff on March 1, 1989, to discuss design details.

Xf there should be any questions, please contact 'us.

Very truly yours, W. F.

nway Senic ice President Nuclear WFC/EJW/cm cc:

Malcolm L. Ernst, Acting Regional Administrator, Region ZZ, USNRC Senior Resident Xnspector, USNRC, St. Lucie Plant EJWATWS o<~

g 8903060039 S90227 PDR ADOCK 05000335 P

PDC

DOCKET NO(S). 50-335/389 Nr. H. F.

Conway Senior Vice President - Nuc1ear Nuclear Energy Department Florida Power and Light Company Post Office Box 14000 Juno Beach, Florida 33408-0420

SUBJECT:

ST.

LUCIE January 25, 1989 DISTRIBUTION

<Docket i'i.le PD22 Rdg Dliil1 er JNorris The following documents concerning our review of the subject facility are transmitted for your information.

Notice of Receipt of Application, dated Draft/Final Environmental Statement, dated Notice of Availability of Draft/Final Environmental Statement, dated Safety Evaluation Report, or Supplement No.

dated Environmental Assessment and Finding of No Significant Impact, dated Notice of Consideration of Issuance of Facility Operating License or Amendment to Facility Operating License, dated ting Bi-Meekly Notice; Applications and Amendments to Operating Licenses Involving No Eigifi

  • i C

id i

dllQll89 I

(Pl Exemption, dated Construction Permit No.

CPPR-

, Amendment No.

dated Facility Operating License No.,

Amendment No.

dated Order Extending Construction Completion Date, dated monthly Operating Report for transmitted by letter dated

+ Annual/Semi-Annual Report-transmitted by letter dated

Enclosures:

As stated Division of Reactor Projects I/II Office of Nuclear Reactor Regulation cc: See next page OFFICE SURNAME)

DATE)

DZ2'.l%

~

~

~ ~

~

~ ~ ~ ~ ~ ~

~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~

NRC FORM 318 l10/801 HRCM 0210 OFFICIAL RECORD COPY

DISTRIBUTION

)Docket-File, w/o -encl g PD22 Rdg. w/o encl.

DMiller w/encl.

JNorris w/encl.

January 12, 1989 DOCKET NO(S). 60-335/389 Mr. M. F.

Conway Senior Vice President-Nuclear Nuclear Energy Department Florida Power and Light Company P. 0. Box NOOO Juno Beach, FL 33408-0420

SUBJECT:

ST. LUCIE UNITS 1 AND 2 The following documents concerning our review of the subject facility are transmitted for your informati on.

Notice of Receipt of Application, dated Draft/Final Environmental Statement, dated Notice of Availability of Draft/Final Environmental Statement, dated Safety Evaluation Report, or Supplement No.

dated Environmental Assessment and Finding of No Significant Impact, dated Q Notice of Consideration of Issuance of Facility Operating License or Amendment to Faci1 ity Operating

License, dated

[}Q Hi-Meekly Notice; Applications and Amendments to Operating Licenses Involving No

=

Significant Hazards Considerations, dated 12/30/88

[see page(a)]

Exemption, dated Construction Permit No.

CPPR-Amendment No.

dated Facility Operating License No.

, Amendment No.

dated Order Extending Construction Completion Date, dated Monthly Operating Report for transmitted by letter dated Annual/Semi-Annual Report-transmitted by letter dated I

En cl osures:

As stated Division of Reactor Projects I/II I.'ffice of Nuclear Reactor Regulation cc:

See next page OFFICE SURNAME)

OATK)

LA,D. -2 Db:

d 01/PW9

~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~

~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~

0 ~

~ ~ ~ ~ ~ ~ ~

~

~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~

'I FIRC FORM 3I8 lloiBOINRCM 0240 OFFICIAL RECORD COPY