Discusses Insp Rept 50-389/88-06 on 880305-0409 & Forwards Notice of Violation.Violation Classified as Severity Level III Violation,But No Civil Penalty Will Be Proposed Due to Prompt Corrective Actions Performed
ML17222A349
Person / Time
Site: Saint Lucie NextEra Energy icon.png
Issue date: 06/29/1988
From: Grace J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Conway W
FLORIDA POWER & LIGHT CO.
Shared Package
ML17222A350 List:
References
EA-88-117, NUDOCS 8807220112
Download: ML17222A349 (5)


See also: IR 05000389/1988006

Text

ACCE&RATED

DISTKBUTION

DEMONSTRATION

SYSTEM

I

j.

REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ESSION NBR:8807220112

DOC.DATE: 88/06/29

NOTARIZED: NO

CIL:50-389 St. Lucie Plant, Unit 2, Florida Power

& Light Co.

AUTH.NAME

AUTHOR AFFILIATION

GRACE,J.N.

Region 2, Ofc of the Director

RECIP.NAME

RECIPIENT AFFILIATION

CONWAY,W.F.

Florida Power

& Light Co.

SUBJECT: Discusses

Insp Rept 50-389/88-06

on 880305-0409

& forwards

notice of violation.

DISTRIBUTION CODE:

IE01D

COPIES RECEIVED:LTR g ENCL +

SIZE:

TITLE: General

(50 Dkt)-Insp Rept/Notice of Vi lation Response

NOTES:,

DOCKET

g

05000389

R

I'S

RECIPIENT

ID CODE/NAME

PD2-2

PD

INTERNAL: ACRS

DEDRO

NRR/DLPQ/PEB 11

NRR/DOEA DIR ll

NRR/DREP/RPB

10

NRR/PMAS/ILRB12

OE LIEBERMAN,J

~72

02

~RUN2

F~LE

01

RNAL: LPDR

NSIC

COPIES

LTTR ENCL

1

1

2

2

1

1

1

1

1

1

2

2

1

1

1

1

1

1

1

1

1

1

1

1

RECIPIENT

ID CODE/NAME

TOURIGNY,E

AEOD

NRR MORISSEAU,D

NRR/DLPQ/QAB 10

NRR/DREP/EPB

10

NRR/DRIS DIR 9A

NUDOCS-ABSTRACT

OGC 15-B-18

RES/DSIR

DEPY

NRC PDR

COPIES

LTTR ENCL

2

2

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

1

D

S

h

TOTAL NUMBER OF COPIES

REQUIRED:

LTTR

25

ENCL

25

Docket No.

50-389

License

No.

NPF-16

EA 88-117

Florida Power and Light Company

PITN:

Nr. M. F.

Conway

Senior

Vice President - Nuclear

Post Office Box 14000

Juno

Beach, Florida

33408-0420

Gentlemen:

SUBJECT:

NOTICE OF VIOLATION

(NRC

INSPECTION

REPORT

NO. 50-389/88-06)

This refers to the Nuclear Regulatory

Commission

(NRC) inspection

conducted

at

the St. Lucie facility on March

5 to April 9, 1988.

The inspection

included

a

review of the circumstances

associated

with the March

13 to April 6, 1988,

blocking of the safety injection actuation

and containment isolation signals to

the letdown isolation valve.

The report documenting this inspection

was sent

to you by letter dated

May 18,

1988.

As

a result of this inspection,

a sig-

nificant failure to comply with NRC regulatory requirements

was identified,

and

accordingly,

NRC concerns relating to the inspection findings were discussed

in

an Enforcement

Conference

held on May 26,

1988.

The violation described

in the enclosed

Notice of Violation (Notice) involved

the improper positioning of a switch which caused

the bypassing of letdown

isolation actuation

and safety injection actuation signals to

a containment

isolation valve, which would have precluded its automatic closure.

This was

caused

by control

room personnel

inappropriately relying on piping and

instrumentation

drawings

(PAID) and performing only cursory reviews of control

wiring diagrams

(CWD) to reach technical

conclusions

pertaining to electrical

control circuits.

Further, control

room personnel

demonstrated

a lack of

understanding

of the functions of a "normal/isolate switch" on an electrical

circuit panel in the cable spreading

room, normally designated

to be used only

under abnormal

conditions associated

With remote

shutdown capabilities,

which

is indicative of the need for enhanced training in the use of P&IDs and

CMDs

by plant operators.

In this case,

the switch was

used

as

an electrical

jumper

without detailed review as to the possible technical

implications of this action

on plant operations.

Finally, there is the concern that this problem remained

undetected

through the rotation of five control

room shifts over

a 24-day period.,

In accordance

with the "General

Statement of Policy and Procedure for NRC

Enforcement Actions," 10 CFR Part 2, Appendix

C (1988), the violation described

in the enclosed

Notice has

been classified

as

a Severity Level III violation.

Normally,

a civil penalty is considered for a Severity Level III violation.

However, after consultation with the Director, Office of Enforcement,

and the

Deputy Executive Director for Regional

Operations,

I have decided that

a civil

3307220112

330629

PDR

ADOCK 05000339'

PDC

Florida Power

and Light Company

- 2-

JUN 29 1988

penalty will not be proposed

in this case

because

corrective actions to prevent

recurrence

were prompt and extensive;

your past performance

in this area

has

been

good;

and

we wish to encourage

the continued inquiring attitudes

by your

operators,

such

as that demonstrated

by the Reactor Operator

trainee

who

discovered

and pursued this problem.

You are required to respond

to this letter and should follow the instructions

specified in the enclosed

Notice when preparing your response.

In your

response,

you should

document the specific actions

taken

and any additional

actions

you plan to prevent recurrence.

After reviewing your response

to this

Notice, including your proposed corrective actions

and the results of future

inspections,

the

NRC will determine

whether fur ther

NRC enforcement action is

necessary

to ensure

compliance with NRC regulatory requirements.

In accordance

with Section 2.790 of the NRC's "Rules of Practice,"

Part 2,

Title 10,

Code of Federal

Regulations,

a copy of this- letter and its enclosure

will be placed in the

NRC Public Document

Room.

The responses

directed

by this letter and its enclosure

are not subject to the

clearance

procedures

of the Office of Management

and Budget

as required

by the

Paperwork

Reduction Act of 1980,

Pub.

L; No.96-511.

Should you have

any questions

concerning this letter, please

contact us.

Sincerely,

>y'ls;nalM>'60<cL ~ ~

L,A. '.Ream

Enclosure:

Notice of Violation

J.

Nelson Grace

Regional Administrator

c~ w/encl:

LrK. N. Harris, Vice President

St. Lucie Nuclear Plant

C4. J. Boissy, Plant Manager

lA'. B. Harper, Site

gA Superintendent

Florida Power and Light Company

bcc w/encl:

PC Resident Inspector

DRS, Technical Assistant

Document Control

Desk

State of Florida

DISTRIBUTION:

PDR

SECY

taylor,

DEDO

Hlfartin, DEDRO

~eberman,

OE

~handler,

OGC

JNGrace,

RII

JStefano,

OE

Enfyvdement Cy6rdibdto&

RI, RII, RIII, RIV,

RV

LHngram,

PA

fPR yes,

OI

onnelly, OIA

Kdordan,

AEOD

EA File

Day FIle

DCS

JUN 29 )gag

RI

ey

s

/p$/88

Er l

~/4 &e

FGibson

~ 6/z.S'/88

J nkins

6/ Ql88

RII

MLErnst

6/

/88

~,

'l

Pc-

OGC

RA;art

W

nM

C

~t ~l k