ML17221A683
| ML17221A683 | |
| Person / Time | |
|---|---|
| Site: | Saint Lucie |
| Issue date: | 03/18/1988 |
| From: | Wilson B NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Conway W FLORIDA POWER & LIGHT CO. |
| Shared Package | |
| ML17221A684 | List: |
| References | |
| NUDOCS 8803250298 | |
| Download: ML17221A683 (4) | |
See also: IR 05000335/1988003
Text
ACt:E~~TZD
DISTRIBUTION
DEMONSTRATION
SYSTEM
REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)
-ESSION NBR:8803250298
DOC.DATE: 88/03/18
NOTARIZED: NO
IL:50-335 St. Lucie Plant, Unit 1, Florida Power
& Light Co.
50-389 St. Lucie Plant, Unit 2, Florida Power
& Light Co.
AUTH.NAME
'UTHOR AFFILIATION
WILSON,B.A.
Region 2, Ofc of the Director
RECIP.NAME
'ECIPIENT AFFILIATION
CONWAY,W.F.
Florida Power
& Light Co.
SUBJECT:
Forwards, Insp Repts 50-335/88-03
& 50-389/88-03
on
880207-0305.No violations or deviations noted.
DISTRIBUTION CODE: IEOID
COPIES
RECEIVED:LTR 4 ENCL
L
SIZE: (2
TITLE: General
(50 Dkt)-Insp Rept/Notice of Vino ation Response
'OCKET
05000335
05000389
NOTES
RECIPIENT
ID CODE/NAME
PD2-2
INTERNAL: ACRS
DEDRO
NRR/DLPQ/PEB11B
NRR/DOEA DIR11E
NRR/DREP/RPB10A
NRR/PMAS/ILRB12
OGC 15-B-18
RES/DRPS
DIR
AL: LPDR
COPIES
LTTR ENCL
1
1
2
2,
1
'1
1
1
1
1
2
2
1
1
1
1
1
1
1
1
1
1
RECIPIENT
ID CODE/NAME
TOURIGNY,E
NRR MORISSEAUPD
NRR/DLPQ/QAB10A
NRR/DREP/EPB10D
NRR/DRIS DIR9A2
.8
J
G FIL
02
RGN2
FILE
01
NRC PDR
1
1
1
1
1
1
1
1
"1
1
COPIES
LTTR ENCL
2
2
1
1
1
1
1
1
1
3.'
j
A
S
'A
TOTAL NUMBER OF COPIES
REQUIRED:
LTTR
24
ENCL
24
1 8
1988
Docket Nos.
50-335,
50-389
License
Nos.
Fl~rida Power and Light Company
MTN:
Mr.
W.
F.
Conway
Group Vice President
Nuclear Energy Department
P. 0.
Box 14000
Juno
Beach,
FL
33408-0420
Gentlemen:
SUBJECT:
NRC INSPECTION
REPORT
NOS. 50-335/88-03
AND 50-389/88-03
This refers to the Nuclear Regulatory
Commission
(NRC) inspection
conducted
by
H.
E. Bibb on February
7
March 5,
1988.
The inspection
included
a review of
activities author. ized for- your St.
Lucie facility.
At the conclusion of the
inspection,
the
findings
were
discussed
with those
members
of your staff
identified in the enclosed
inspection report.
Areas
examined
during
the
inspection
are
identified in the report.
Within
these
areas,
the inspection
consisted
of selective
examinations
of procedures
and
representative
records,
interviews with personnel,
and
observation
of
activities in'progress.
Within
the
scope
of
the
inspection,
no violations
or deviations
were
identified.
In accordance
with Section
2.790 of the
NRC's
"Rules of Practice",
Part 2,
Title 10,
Code of Federal
Regulations,
a copy of this letter
and its enclosure
will be placed in the
NRC Public Document
Room.
Should you have
any questions
concerning this letter,
please
contact
us.
Sincerely,
Meet S!gned Sy
BRUCE A. VtiLSON
Bruce A. Wilson, Chief
Reactor Projects
Branch
2
Division of Reactor Projects
Enclosure:
NRC Inspection
Report
cc w/encl:
(See
page
2)
~g0325029~
05000335
gc3Q'3 18
pop
PQOCK
0
>/i
Power
and Light Company
MAR f 8
lS'88
cc w/encl:
- g.
N. Harris, Vice President
.St.
Lucie Nuclear Plant
LE'. Boissy, Plant Manager
g.
B. Harper, Site
gA Superintendent
bc
w/encl:
C Resident
Inspector,
DRS Technical Assistant
Document Control
Desk
State of Florida
RII
Christensen:tm
03/rP/88
BWi 1
n
i
03/
88
0