ML17221A666
| ML17221A666 | |
| Person / Time | |
|---|---|
| Site: | Saint Lucie |
| Issue date: | 03/04/1988 |
| From: | Reyes L NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Woody C FLORIDA POWER & LIGHT CO. |
| References | |
| NUDOCS 8803170021 | |
| Download: ML17221A666 (3) | |
Text
REGULATO INFORMATION DISTRIBUTION TEM'RIDS)
, I ACCESSION NBR: 8803170021 DOC. DATE: 88/03/04 NOTARIZED:
NO FACIL: 50-3'-5 St.
Lucie Pla'nt, Unit 1I Florida Power 5 Light Co.
50-385't.
Lucie Planti Unit 2I Florida Power 5 Light Co.
AUTH. NAME AUTHOR AFFILIATION REYESI L. A.
Region 2I Ofc of the Director RECIP. NAME
~
RECIPIENT AFFILIATION WOODYI C. O.
Florida Power 5 Light Co.
DOCKET 4
050003 0500038'-=
SUBJECT:
Advises of special insp initiative in late stages of planning entitledI "Emergency Operating Procedure (EOP)
Insp Program" whose purpose is to verify technical accuracy of EOPs. Insps to be performed in Apr through Jul 1988.
DISTRIBUTION CODE:
IE35D COPIES RECEIVED: LTR l
ENCL Q SIZE:
TITLE: Emergency'Pr eparedness-Appraisal/Confirmatory Action Ltr/Exercise Rep NOTES:
RECIPIENT ID CODE/NAME PD2-2 PD COP IES LTTR ENCL RECIPIENT ID CODE/NAME TOURIQNYI E COPIES LTTR ENCL INTERNAL: ARM/DAF/LFMB NRR/PMAS/ILRB12 RGN2 FILE 01 EXTERNAL:
LPDR NSIC R -- ~E/EPB10D EL 02 RGN2/DRSS/EPRPB NRC PDR TOTAL NUMBER OF COPIES REQUIRED:
LTTR 11 ENCL
e
/flic( R I March 4, 1988 Florida Power and Light Company ATTN:
Mr. C. 0.
Woody Group Vice President Nuclear Energy Department P. 0.
Box 14000 Juno
- Beach, FL 33408 Gentlemen:
SUBJECT:
EMERGENCY, OPERATING PROCEDURE (EOP)
INSPECTION PROGRAM This is to advise you of a special inspection initiative that is in the late stages of planning.
, It wi 11 include an inspecti'on to be performed at the St.
Lucie site.
The initiative 'is entitled the "EOP
'Inspection Program."
The purpose of the inspection is to verify at selected sites that the emergency operating procedures (EOPs) are technically accurate; that their specified actions can be meaningfully accomplished using existing equipment,
- controls, and instrumentation; and that the available procedures have the usability necessary to provide the operator with an effective operating tool.
The inspection program includes a
team inspection of four sites'for each of the NSS vendor
- types, and the St.
Lucie site was selected as one of the four CE sites to be inspected.
The inspections are to be performed in the April through July 1988 timeframe.
The inspection team wi 11 include two or three senior reactor inspectors, a
licensing
- examiner, a
human factors specialist, and the St.
Lucie senior resident inspector (Mr. G. Paulk).
The team leader for your inspection will be Mr. Perry Stewart from Region IV.
Mr. Stewart, or one of his supervisors, will be contacting you in the near future to discuss the inspection and to begin negotiating the inspection schedule.
Additional information and details of the program, will be provided by the inspection team.
I If you have any questions in the interim regarding the inspection
- program, we would be pleased to discuss them with you.
Sincerely, cc:
(See Page 2) 8803l7002i 880304 PDR ADOCg pS000335 G
PDR Original Signed by Charles W. Hehl. /for Luis A. Reyes, Director Division of Reactor Projects
Florida 'Power and Light Company March 4, 1988 cc:
K. N. Harris, Vice President St. Luci e Nuclear Plant G. J. Boissy, Plant Manager J.
B. Harper, Site gA Superintendent bcc:
NRC Resident Inspector P. Stewart, RIV J. Gagliardo, RIV L. Lawyer, DRS DRS Technical Assistant Document Control Desk State of Florida RII
~h RII,.
RII RI R
(~
RII R
1~
"~'.~
lYP~y~
/')",'w~
PKel log):btm LL'awyey MShymlock CJu ian AGib on r ehJak LR es 3/g /88 3/~~ /88 3/ p /88 3/~/88 3/~ /88 3/Q /88 3/
/88