ML17221A578
| ML17221A578 | |
| Person / Time | |
|---|---|
| Site: | Saint Lucie |
| Issue date: | 01/11/1988 |
| From: | Dan Collins NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Woody C FLORIDA POWER & LIGHT CO. |
| Shared Package | |
| ML17221A579 | List: |
| References | |
| NUDOCS 8801190204 | |
| Download: ML17221A578 (4) | |
See also: IR 05000335/1987030
Text
REGULAT
INFORMATION DISTRIBUTION
STEM
( R IDS )
ACCESSION
NBR: 8801190204
DOC. DATE: 88/01/11
NOTARIZED:
NO
FACIL: 50-335 St.
Lucie Planti Unit ii Flori da Poeer
8c Light Co.
50-389 St.
Lucie Planti Unit 2i Florida Poeer
5 Light Co.
AUTH. NAME
AUTHOR'FFILIAT,ION
COLLINS'. M.
Reg ion 2i
Of c of the Director
REC IP. NAME,
RECIPIENT AFFILIATION
WOODY'. O.
Florida Poeer
5 Light Co.
SUBJECT:
Foreards
Insp Repts
50-335/87-30
8c 50-389/87-29
on
871207-11.
No violations or deviations
noted.
DISTRIBUTION CODE:
IE01D
COPIES'RECEIVED: LTR I
ENCL
I
SIZE:
TITLE: General
(50 Dkt)-Insp Rept/Notice of Violation Response
NOTES:
DOCKET
05000335
05000389
RECIPIENT
ID CODE/NAME
PD2-2
INTERNAL:
MORISSEAU. D
NRR/DOEA DIR
NRR/DREP/RPB
NRR/PMAS/ ILRB
OGC/HDS2
RES/DRPS
DIR
ERNAL:
LPDR
COPIES
LTTR ENCL
1
1
1
1
1
1
1
1l
1
1
1
1
1
1
1
1
1
1
RECIPIENT
ID CODE/NAME
TOURIGNYi E
DEDRO
NRR/DLPG/PEB
NRR/DREP/EPB
NRR/DRIS DIR
OE LIEBERMANiJ
RGN2
FILE
01
NRC
COPIES
LTTR ENCL
2
2
TOTAL NUMBER OF COPIES
REQUIRED:
LTTR
21
ENCL
21
Docket Nos. 50-335,
50-389
~
~
License
Nos.
Florida Power and Light Company
ATTN:
Mr. C. 0.
Woody
Group Vice President
Nuclear Energy Department
P. 0.
Box 14000
Juno
Beach,
FL
33408
Gentlemen:
SUBJECT:
NRC
INSPECTION REPORT
NOS. 50-335/87-30
AND 50-389/87-29
This refers
to the Nuclear
Regulatory
Commission
(NRC) inspection
conducted
by
J.
L. Kreh
on
December 7-11,
1987.
The
inspection
included
a
review of
activities authorized for your St.
Lucie facility.
At the conclusion of the
inspection,
the
findings
were
discussed
with those
members
of your staff
identified in the enclosed
inspection report.
Areas
examined
during
the inspection
are identified in the report.
Within
these
areas,
the inspection
consisted
of selective
examinations
of procedures
and
representative
records,
interviews
with personnel,
and
observation
of
activities in progress.
Within the
scope
of
the
inspection,
no violations
or deviations
were
identified.
In accordance
with Section
2.790 of the
NRC's
"Rules of Practice,"
Part 2,
Title 10,
Code of Federal
Regulations,
a copy of this letter and its enclosure
will be placed in the
NRC Public Document
Room.
Should you have any questions
concerning this letter,
please
contact
us.
Sincerely,
Enclosure:
Inspection
Report
cc w/encl;
(See
page
2)
Douglas
M. Collins, Chief
Emergency
Preparedness
and
Radiological Protection
Branch
Division of Radiation Safety
and Safeguards
8801190204
880111
ADOCK 05000335
G
Florida Power and Light Company
cc w/encl:
K. N. Harris, Vice President
St. Lucie Nuclear Plant
J.
G. Boissy, Plant Manager
J.
B. Harper, Site
gA Superintendent
bcc w/encl:
NRC Resident
Inspector
DRS Technical Assistant
Document Control
Desk
State of Florida
D.
B. Matthews,
NRR/EPB
J.
C. Heard, Jr.,
FEMA Region
IV
RI
reh
d/c& g
RII
BW~1son~
RI I
P< TDecker
42~~
di/0P/ZZ
uz/~ /gg