ML17221A477

From kanterella
Jump to navigation Jump to search
Forwards Insp Repts 50-335/87-22 & 50-389/87-21 on 870928-1002.No Violations or Deviations Noted
ML17221A477
Person / Time
Site: Saint Lucie  NextEra Energy icon.png
Issue date: 10/22/1987
From: Cline W
NRC Office of Inspection & Enforcement (IE Region II)
To: Woody C
Florida Power & Light Co
Shared Package
ML17221A478 List:
References
NUDOCS 8710290296
Download: ML17221A477 (3)


See also: IR 05000335/1987022

Text

REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION

NBR

FAC IL: 50-335

50-389

AUTH. NAME

LINEz W. E.

REC IP. NAME

OODYI C. O.

8710290296

DOC. DATE: 87/10/22

NOTARIZED:

NO

St.

Lucie Planti

Unit ii Florida Power

& Light Co.

St.

Lucie Planti Unit 2i Florida Power

8c Light Co.

AUTHOR AFFILIATION

Region

2i

Ofc of the Director

RECIPIENT AFFILIATION

Florida Power

5 Light Co.

DOCKET ¹

05000335

05000389

SUBJECT:

Forwards

Insp Repts. 50-335/87-22

8c 50-389/87-21

on

870928-1002.

No violations or deviations

noted.

DISTRIBUTION CODE:

IE04D

COPIES

RECEIVED: LTR

1 ENCL J

SIZE:

TITLE: Safeguards

Inspection

Rpt/NOV Response

(50 DKT)-Publicly Available

NOTES:

RECIPIENT

ID CODE/NAME

PD2-2 LA

TOURIGNYi E

COPIES

LTTR ENCL

0

1

1

REC IP IENT

ID CODE/NAME

PD2-2

PD

COPIES

LTTR ENCL

1

1

INTERNAL: AEOD/DOA

N

.

/SIB

R

G F LE

02

EXTERNAL:

LPDR

NSIC

1

0

NRR/DRIS/SGB

1

1

NRR/PMAS/ILRB

1

1

-

RQN2

FILE

01

NRC

PDR

1

1

1

0

1

1

1

1

TOTAL NUMBER OF. COPIES

REQUIRED:

LTTR

12

ENCL

SAFEGUARDS INFORMATION

OCT s2

i88~

Docket Nos.

50-335,

50-389

License

Nos.

DPR-67,

NPF-16

Florida Power

and Light Company

ATTN:

Mr. C. 0.

Woody

Group Vice President

Nuclear

Energy Department

P. 0. Box,14000

Juno

Beach,

FL

33408

o

I

CD

C/l

Gentlemen:.

SUBJECT:

NRC

INSPECTION

REPORT

NOS. 50-335/87-22

AND 50"389/87-21

This refers to the Nuclear Regulatory

Commission

(NRC) inspection

conducted

by

Orysia

M. Masnyk

on

September

28

October 2,

1987.

The inspect'ion

included

a

.

review of activities authorized for your St. 'Lucie facility.

At the conclusion

of the inspection,

the findings were discussed

with those

members of your staff

identified in the enclosed

inspection report.

Areas

examined

during

the

inspection

are identified in the report.

Within

these

areas,

the

inspection

consisted

of selective

examinations

of procedures

and

representative

records,

interviews with personnel,

and

observation

of

activities in progress.

Within

the

scope

of

the

inspection,

no violations

or deviations

were

identified.

In accordance

with 10 CFR 2.790(d)

and

10 CFR 73.21,

safeguards

activities and

security

measures

are

exempt

from public disclosure;

therefore,

the enclosure

to this letter, with the exception

of the report cover

page

which presents

a

nonexempt

summary,

wi 11 not be placed in the

NRC Public Document

Room.

Should you have

any questions

concerning this letter,

please

contact

us.

Sincerely,

8710290296

871022

PDR

ADOCK 05000335

6

PDR

Enclosure:

(See

page 2)

William E. Cline, Chief

Nuclear Materials Safety

and

Safeguards

Branch

Division of Radiation Safety

and Safeguards

~;,01>TA i'<"

<>C<osga

"

iahS ill"-

SAFgGU~

09 'D

'TX

SAFEGUARDS INFORivie I ION

SAFEGUARDS INFORMATION

OCT22 m87

Enclosure:

NRC Inspection

Report

cc w/encl:

K.

N. Harris,, Vice President

St.

Lucie Nuclear Plant

J.

G. Boissy, Plant Manager

J.

B. Harper, Site

QA Superintendent

bcc w/encl:

NRR/DRIS/SB

bcc w/Inspection

Summary:

Document Control

Desk (RIDS IE04),

016

NRC Resident

Inspector

State of Florida

10/g. /

RI I

Bgil on

10/g/87

~gghRDg IgPOllgATI

Ol'PON

SEl hBATION THIS

FhGE IS DECONTROLLED.

0

cG ire

10~ /8?

SAFEGUARDS INFORMATION