ML17221A435
| ML17221A435 | |
| Person / Time | |
|---|---|
| Site: | Saint Lucie |
| Issue date: | 09/30/1987 |
| From: | Tourigny E Office of Nuclear Reactor Regulation |
| To: | Woody C FLORIDA POWER & LIGHT CO. |
| References | |
| TAC-65268, TAC-65269, NUDOCS 8710070691 | |
| Download: ML17221A435 (5) | |
Text
Docke't" Nos. 50-335/389 Mr. k. 0.
Woody Group Vice President Nuclear Energy Florida Power and Light Company P. 0.
Box 14000 Juno Beach, Florida 33408 SEP 30 $81
Dear Mr. Woody:
SUBJECT:
MISCELLANEOUS AMENDMENTS/SEARCH RE(UIREMENTS ST.
LUCIE PLANT (TAC 65268/65269)
This is to acknowledge receipt of the Florida Power and Light Company letter, dated December 2, 1986, which transmitted a proposed amendment to the St. Lucie Plant Physical Security Plan, in response to the Miscellaneous Amendments and Search Requirements.
The submitted document has been reviewed and we have determined that additional information and revisions to the plan are required prior to our approval.
The enclosed comments are based upon pertinent NRC regulations and published guidance describing methods, acceptable to the NRC staff, for implementing specific parts of those regulations.
It is requested that you provide your response to these comments within 30 days from receipt of this letter.
The reporting and/or record keeping requirements contained in this letter affect fewer than ten respondents; therefore, OMB clearance is not required under P.L.96-511.
Should you have any questions concerning the enclosed
- comments, please contact the reviewer, Robert Skelton, at (301) 492-4533.
Sincerely, 87~ o>>0~9>
8>093~0 PDR ADQCg 05000335" P~DR
Enclosure:
Physical Security Plan Comments cc w/enclosure:
See next page Edmond G. Tourigny, Project Manager Project Directorate II-2 Division of Reactor Projects I/II Office of Nuclear Reactor Regulation DISTRIBUTION W/ENCLOSURES:
r ec r RSkel ton CBuracker (2)
Region II Dflil 1er ETourigny Docket File 50-335/389 Case File NRC PDR RErickson wo/encl Local PDR LBush wo/encl PStarcher OFC
- RSGB NAME :RSkelto
- RSGB g,
- RSGB
- CBurafk r ush
- RSGB
- RE
~ p son
- D I-2
- PD II-2 o rigny
/
87 OATE $/
87
.Qp/
tIg /87: g/87
. I/'/p/87:p/~/87
V L
t
Docket Nos.
50-335/389 ENCLOSURE COMMENTS ON PHYSICAL SECURITY PLAN CHANGES (MISCELLANEOUS AMENDMENTS AND SEARCH REQUIREMENTS)
ST.
LUCIE PLANT State that vital area access controls will not be dropped for life threatening situations not involving public health and safety.
Reference 10 CFR 50.54(x) and (y) and Generic Letter 87-08 (gM ¹3).
Provide a commitment that a physical pat-down search of an individual shall be conducted if there is cause to suspect that an individual is attempting to bring firearms, explosives, or incendiary devices into the protected area.
Reference 10 CFR 73.55(d)(1).
Provide a commitment that vital area access lists shall be updated and reapproved by the cognizant manager/supervisor at least ever 31 da s (not monthly).
Reference 10 CFR 73.55(d)(7)(i)(A).
e )neutron sect>on o
plan does not apply to this commitment.
Provide a commitment to ensure prompt access to vital equipment to accommodate the potential need for rapid ingress or egress of individuals during emergency conditions or situations.
Indicate how this prompt access will be ensured (e. g., by issuing override keys to appropriate operators and security force members at the start of each shift, or by other acceptable means).
Reference 10 CFR 73.55(d)(7)(ii) and Generic Letter 87-08 (g8A ¹6).
Provide a commitment that all keys, locks, combinations, and related access control devices used to control access to protected and vital areas shall be changed or rotated at least ever 12 months (not annually) or whenever there is evidence or suspsclon that any of these devices may have been compromised.
Reference 10 CFR 73.55(d)(9). Definition section of plan does not apply to this commitment.
Provide a commitment that whenever an individual's unescorted access is revoked due to lack of trustworthiness, reliability, or inadequate work performance, keys, locks, combinations, and related access control devices to which that person had access shall be changed or rotated..
Reference 10 CFR 73.55(d)(9).
Define what actual timing is intended for the "periodic reviews" conducted.
Reference 10 CFR 73.55(d)(7)(ii)(B).
Indicate what components of the secondary power supply system will be protected as vital.
Reference 10 CFR 73.55(e)(l) and Generic Letter 87-08 (qu ¹18).
Provide a commitment to maintain a log indicating name, badge
- number, time of entry, and time of exit of all individuals granted access to all vital areas (drop references to unoccupied vital areas) except those individuals entering or exiting the reactor control room.
Reference 10 CFR 73.70(d).
Reinclude the reference to Section 5.2. 1(e),
page 5-6 in your plan; it appears to have been dropped from your previously approved plan.
~r V
~
~
Mr. L; 0.
Woody Florida Power 5 Light Company St. Lucie Plant CC:
Mr. Jack Shreve Office of the Public Counsel Room 4, Holland Building Tallahassee, Florida 32304 Resident Inspector c/o U.S.
NRC 7585 S.
Hwy AlA Jensen Beach, Florida 34957
'State Planning 5 Development Clearinghouse Office of Planning 5 Budget Executive Office of the Governor The Capitol Building Tallahassee, Florida 32301 Harold F. Reis, Esq.
Newman A Holtzinger 1615 L Street, N.W.
Washington, DC 20036 John T. Butler, Esq.
- Steel, Hector and Davis 4000 Southeast Financial Center Miami, Florida 33131-2398 Adminis trator Department of Environmental Regulation Power Plant Siting Section State of Florida 2600 Blair Stone Road Tallahassee, Florida 32301 Mr. Weldon B. Lewis, County Administrator St. Lucie County 2300 Virginia Avenue, Room 104 Fort Pierce, Florida 33450 Mr. Charles B. Brinkman, Manager Washington - Nuclear Operations Combustion Engineering, Inc.
7910 Woodmont Avenue
- Bethesda, Maryland 20814 Jacob Daniel Nash Office of Radiation Control Department of Health and Rehabilitative Services 1317 Winewood Blvd.
Tallahassee, Florida 32399-0700 Regional Administrator, Region II U.S. Nuclear Regulatory Commission Executive Director for Operations 101 Marietta Street N.W., Suite 2900 Atlanta, Georgia 303?3