ML17221A428

From kanterella
Jump to navigation Jump to search
Forwards Insp Repts 50-335/87-20 & 50-389/87-19 on 870802-0905.No Violations or Deviations Noted
ML17221A428
Person / Time
Site: Saint Lucie  NextEra Energy icon.png
Issue date: 09/24/1987
From: Verrelli D
NRC Office of Inspection & Enforcement (IE Region II)
To: Woody C
Florida Power & Light Co
Shared Package
ML17221A429 List:
References
NUDOCS 8710010290
Download: ML17221A428 (3)


See also: IR 05000335/1987020

Text

REGULATORY INFORMATION DISTRIBUTION SYSTEM (RIDS)

ACCESSION NBR: 8710010290

DOC. DATE: 87/09/24

NOTARIZED:

NO

FACIL: 50-335 St.

Lucie Planti Unit

1> Florida Poeer

5 Light Co.

50-38'P St.

Lucie Planti Unit 2i Florida Pacer

& Light Co.

AUTH. NAME

AUTHOR AFFILIATION

VERRELLI> D. M.

Region

2i Office of Director

RECIP. NAME

RECIPIENT AFFILIATION

OODYs C. O.

Florida Power

h Light Co.

SUBJECT:

Foreards

Insp Repts

50-335/87-20

5 50-389/87-19

on

870802-0905.

No violations or deviations

noted.

DISTRIBUTION CODE:

IEOID

COPIES

RECEIVED: LTR / ENCL g

SIIE:

TITLE: General

(50 Dkt>-Insp Rept/Notice of Violation Response

NOTES:

DOCKET 0

05000335

05000389

RECIPIENT

ID CODE/NAME

PD2-2

PD

INTERNAL: AEOD

NRR

MOR ISSEAUi D

NRR/DREP/EPB

NRR/DRIS DIR

0

LIEBERMANiJ

RGN2

FILE

01

TERNAL:

LPDR

NSIC

COPIES

LTTR ENCL

1

1

1

1

1

1

1

1

1

1

1

1

.

1

1

1

1

1

1

RECIPIENT

ID CODE/NAME

TOUR IGNYa E

DEDRO

NRR/DOEA DIR

NRR/DREP/RPB

NRR/P MAS/ILRB

OGC/HDS2

RES

DEPY GI

NRC

PDR

COPIES

LTTR ENCL

2

2

1

1

1

2

.

2

1

1

1

-

1

1

1

1

1

TOTAL NUMBER OF COPIES

REQUIRED:

LTTR

20

ENCL

20

Docket Nos.

50-335,

50-389

License

Nos.

DRP-67,

NPF-16

Florida Power

and Light Company

ATTN:

Mr. C. 0.

Woody

Group Vice President

Nuclear Energy Department

P. 0.

Box 14000

Juno

Beach,

FL

33408

8

n

C3

CD

Gentlemen:

SUBJECT:

NRC

INSPECTION

RPEORT

NOS. 50-335/87-20

AND 50-389/87-19

This refers to the Nuclear Regulatory

Commission (NRC)'inspection

conducted

by

R.

V. Crlenjak on August 2, through September

5,

1987.

The inspection

included

a

review of activities

authorized

for your

St.

Lucie facility.

At the

conclusion

o

he inspection,

the findings were discussed

with those

members of

your staff identified in the enclosed

inspection report.

Areas

examined

during

the

inspection

are

identified in the report.

Within

these

areas,

the inspection

consisted

of selective

examinations

of procedures

and

representatives

records,

interviews with personnel,

and

observation

of

activities in progress.

Within

the

scope

of

the

inspection,

no violations

or

deviations

were

identified.

In accordance

with Section

2.790 of the

NRC's

"Rules of Practice",

Part

2,

Title 10,

Code

of

Federal

Regulations,

a

copy

of this letter

and its

- - enclosure( s) will be placed in the Public Document

Room.

Should you have

any questions

concerning this letter,

please

contact

us.

87fppipH'p 85ppp335

7gcQ4

pgR

AgQCK P

PgR

8

Sincerely,

KRIGINAL SIG"'~

BY

DAVID M. VERRELLl

David M. Verrelli, Chief

Reactors

Projects

Branch

1

Division of Reactor Projects

Enclosure:

NRC Inspection

Report

cc:

(See

page

2)

Florida Power

and Light Company

cc w/encl:

K. N. Harris, Vice President

St.

Lucie Nuclear Plant

J.

G. Boissy, Plant Manager

J.

B. Harper, Site

QA Superintendent

bcc w/encl:,

NRC Resident

Inspector

Document Control

Desk

State of Florida

RII,, J ].,

,.(

~

HChri stensen: vyg

9/ /'/87

RI I

i>son

g/++S7