ML17219A535

From kanterella
Jump to navigation Jump to search
Forwards Insp Repts 50-335/87-05 & 50-389/87-05 on 870302-06.No Violations or Deviations Noted
ML17219A535
Person / Time
Site: Saint Lucie  
Issue date: 04/09/1987
From: Verrelli D
NRC Office of Inspection & Enforcement (IE Region II)
To: Woody C
Florida Power & Light Co
Shared Package
ML17219A536 List:
References
NUDOCS 8704280629
Download: ML17219A535 (5)


See also: IR 05000335/1987005

Text

>r.

~~

l~.

0

ACCESSION

NBR

'ACIL:50-335

50-389

AUTH. NAhIE

RELLI> D. hI

C IP. hiArIE

DY> C. O.

REGULATORY INFQRhIATIQN DISTRIBUTION SYSTEhI

(R IDS)

8704280629

DOC. DATE: 87/04/09

NOTARIZED:

NQ

St.

Lucie Plant>

Unit

1> Florida Poeer

Zc Light Co.

St.

Lucie Plant>

Unit

2> Florida Power

Zc Light Co.

AUTHOR AFFILIATION

Region

2> Office of Direc tor

RECIPIENT AFFILIATION

Florida Power

Zc Light Co.

DOCKET 0

05000335

05000389

SUBJECT:

Forwards

Insp Repts

50-335/$ 7-05 5 50-389/87-05

on

870302-07. No violations or deviations

noted.

DISTRISVTIDN CODE:

IEOID

COPIES

RECEIVED; LTR g ENCL /

SIZE: 4 +//

TITLE: General

<50 DIct)-Insp Rept/Notice of Violation Response

NOTES:

RECIPIENT

ID CODE/NANE

PD2-2 LA

TQURIGNY> E

INTERNAL: AEOD

ENF LIEBERI'IAN

hIRR/DOEA DIR

NRR/DREP/RPB

NR

A

B

EG FILE

N

ILE

01

E

NAL:

LPDR

NSIC

COPIES

LTTR ENCL

1

0

1

1

1

1

1

1

2

2

1

1

RECIPIENT

ID CODE/NAI'IE

PD2-2

PD

DEORO

NRR

ROE> hI. L

NRR/DREP/EPB

NRR/DRIS DIR

OGC/HDS2

RES

SPEIS> T

NRC

PDR

COPIES

LTTR ENCL

1

1

1

1

1

1

1

1

1

1

1

1

1

1

TOTAL NUNBER OF COPIES

REQUIRED:

LTIR

20

ENCL

19

~

~

APR

O 9 gy

Docket Nos. 50-335,

50-389

License

Nos.

DPR-67,. NPF-16

Florida<Power

and Light Company

ATTN:yHr. C. 0.

Woody

Group Vice President

Nuclear Energy Department

P. 0.

Box 14000

Juno

Beach,

FL

33408

Gentlemen:

SUBJECT:

NRC

INSPECTION REPORT

NOS. 50-335/87-05

AND 50-389/87-05

This refers to the Nuclear Regulatory

Commission

(NRC) inspection

conducted

by

B.

R. Crowley

on

March 2-6,

1987.

The

inspection

included

a

review of

activities authorized

for your St. Lucie facility.

At the conclusion of the

inspection,

the findings

were discussed

with those

members

of your staff

identified in the enclosed

inspection report.

Areas

examined

during the inspection

are identified in the report.

Within

these

areas,

the inspection

consisted

of selective

examinations

of procedures

and

representative

records,

interviews with personnel,

and observation

of

activities in progress.

Within the

scope

of the

inspection,

no violations

or deviations

were

identified.

In accordance

with Section

2.790 of the

NRC's

"Rules of Practice,"

Part 2,

Title 10,

Code of Federal

Regulations,

a copy of this letter and its enclosure

will be placed in the

NRC Public Document

Room.

Should you have any questions

concerning this letter, please

contact us.

Sincerely,

ORIGINAI'. SIGNED BY

DAVID M. VERRELLt

Enclosure:

NRC Inspection

Report

cc:.

(See

page

2)

David M. Verrelli, Chief

Reactor Projects

Branch

1

Division of Reactor Projects

8704280b29

870409

PDR

ADOCK 05000335

9

PDR

Florida Power and Light Company

a

cc w/encl:

.

K. N. Harris, Vice President

St. Lucie Nuclear Plant

,, D. A. Sager,

Plant Manager

J.

B. Harper, Site

gA Superintendent

bcc w/encl:

yNRC Resident

Inspector

bcc w/encl:

Document Control

Desk

State of Florida

BRCrowley:cc

3/

/87

9-7

J

lake

Q/ j /87

RI(gf

H rdt

/9 /87