ML17219A535
| ML17219A535 | |
| Person / Time | |
|---|---|
| Site: | Saint Lucie |
| Issue date: | 04/09/1987 |
| From: | Verrelli D NRC Office of Inspection & Enforcement (IE Region II) |
| To: | Woody C Florida Power & Light Co |
| Shared Package | |
| ML17219A536 | List: |
| References | |
| NUDOCS 8704280629 | |
| Download: ML17219A535 (5) | |
See also: IR 05000335/1987005
Text
>r.
~~
l~.
0
ACCESSION
NBR
'ACIL:50-335
50-389
AUTH. NAhIE
RELLI> D. hI
C IP. hiArIE
DY> C. O.
REGULATORY INFQRhIATIQN DISTRIBUTION SYSTEhI
(R IDS)
8704280629
DOC. DATE: 87/04/09
NOTARIZED:
NQ
St.
Lucie Plant>
Unit
1> Florida Poeer
Zc Light Co.
St.
Lucie Plant>
Unit
2> Florida Power
Zc Light Co.
AUTHOR AFFILIATION
Region
2> Office of Direc tor
RECIPIENT AFFILIATION
Florida Power
Zc Light Co.
DOCKET 0
05000335
05000389
SUBJECT:
Forwards
Insp Repts
50-335/$ 7-05 5 50-389/87-05
on
870302-07. No violations or deviations
noted.
DISTRISVTIDN CODE:
IEOID
COPIES
RECEIVED; LTR g ENCL /
SIZE: 4 +//
TITLE: General
<50 DIct)-Insp Rept/Notice of Violation Response
NOTES:
RECIPIENT
ID CODE/NANE
PD2-2 LA
TQURIGNY> E
INTERNAL: AEOD
ENF LIEBERI'IAN
hIRR/DOEA DIR
NRR/DREP/RPB
NR
A
B
EG FILE
N
ILE
01
E
NAL:
LPDR
COPIES
LTTR ENCL
1
0
1
1
1
1
1
1
2
2
1
1
RECIPIENT
ID CODE/NAI'IE
PD2-2
DEORO
ROE> hI. L
NRR/DREP/EPB
NRR/DRIS DIR
OGC/HDS2
SPEIS> T
NRC
COPIES
LTTR ENCL
1
1
1
1
1
1
1
1
1
1
1
1
1
1
TOTAL NUNBER OF COPIES
REQUIRED:
LTIR
20
ENCL
19
~
~
APR
O 9 gy
Docket Nos. 50-335,
50-389
License
Nos.
Florida<Power
and Light Company
ATTN:yHr. C. 0.
Woody
Group Vice President
Nuclear Energy Department
P. 0.
Box 14000
Juno
Beach,
FL
33408
Gentlemen:
SUBJECT:
NRC
INSPECTION REPORT
NOS. 50-335/87-05
AND 50-389/87-05
This refers to the Nuclear Regulatory
Commission
(NRC) inspection
conducted
by
B.
R. Crowley
on
March 2-6,
1987.
The
inspection
included
a
review of
activities authorized
for your St. Lucie facility.
At the conclusion of the
inspection,
the findings
were discussed
with those
members
of your staff
identified in the enclosed
inspection report.
Areas
examined
during the inspection
are identified in the report.
Within
these
areas,
the inspection
consisted
of selective
examinations
of procedures
and
representative
records,
interviews with personnel,
and observation
of
activities in progress.
Within the
scope
of the
inspection,
no violations
or deviations
were
identified.
In accordance
with Section
2.790 of the
NRC's
"Rules of Practice,"
Part 2,
Title 10,
Code of Federal
Regulations,
a copy of this letter and its enclosure
will be placed in the
NRC Public Document
Room.
Should you have any questions
concerning this letter, please
contact us.
Sincerely,
ORIGINAI'. SIGNED BY
DAVID M. VERRELLt
Enclosure:
NRC Inspection
Report
cc:.
(See
page
2)
David M. Verrelli, Chief
Reactor Projects
Branch
1
Division of Reactor Projects
8704280b29
870409
ADOCK 05000335
9
Florida Power and Light Company
a
cc w/encl:
- .
K. N. Harris, Vice President
St. Lucie Nuclear Plant
,, D. A. Sager,
Plant Manager
J.
B. Harper, Site
gA Superintendent
bcc w/encl:
yNRC Resident
Inspector
bcc w/encl:
Document Control
Desk
State of Florida
BRCrowley:cc
3/
/87
9-7
J
lake
Q/ j /87
RI(gf
H rdt
/9 /87